Advertisement

Dynamic Process Management Based upon Existing Systems

  • M. Heller
  • M. Nagl
  • R. Wörzberger
  • T. Heer
Part of the Lecture Notes in Computer Science book series (LNCS, volume 4970)

Abstract

In the past funding periods of the CRC 476 the process management system AHEAD has been developed as a research prototype (cf. 3.4). The project T6 aims at transferring the corresponding research results into two different industrial environments. Together with innotec GmbH, we realize a process management system on top of the chemical engineering tool Comos PT. This system will allow for the holistic management of the overall administration configuration (activities, products and resources). Furthermore, we extend our application experience by also considering dynamic business processes. In cooperation with AMB-Informatik, we build a workflow management system that allows dynamic changes of workflows at runtime. This new workflow management system is also built on top of an existing one, which strictly separates build-time from runtime.

Keywords

Business Process Holistic Management Commercial Tool Conformance Checker Process Management System 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© Springer-Verlag Berlin Heidelberg 2008

Authors and Affiliations

  • M. Heller
  • M. Nagl
  • R. Wörzberger
  • T. Heer

There are no affiliations available

Personalised recommendations