Stakeholders to Sustainable Value Management

  • Ayodeji E. Oke
  • Clinton O. Aigbavboa
Chapter

Abstract

This chapter explains how project stakeholders and participants of sustainable construction can be incorporated into value management practice and study in the quest of achieving sustainable construction projects. Stakeholders to sustainable value management team were identified as internal or external members. Cost of value management, which is related to the selection and number of team members, was noted as one of the risks of value manager. The size of the team should be large enough to allow for the generation of various ideas, brainstorming and delegation of responsibilities; it should also be few enough to reduce the cost of the study. Care should therefore be taken by the facilitator of sustainable value management to ensure that there are not too many participants when trying to include all relevant members in the team.

Keywords

Construction project Stakeholder management Sustainable value management Team composition Value management Value management facilitator 

References

  1. Aapaoja, A., & Haapasalo, H. (2014). A framework for stakeholder identification and classification in construction projects. Open Journal of Business and Management, 2(2014), 43–55.CrossRefGoogle Scholar
  2. Bal, M., Bryde, D., Fearon, D., & Ochieng, E. (2013). Stakeholder engagement: Achieving sustainability in the construction sector. Sustainability, 6(5), 695–710.CrossRefGoogle Scholar
  3. Daddow, T., & Skitmore, M. (2005). Value management in practice: An interview survey. Australian Journal of Construction Economics and Building, 4(2), 11–18.CrossRefGoogle Scholar
  4. Leung, M. (2001). Educational framework for MSc in value management. Paper presented at a Conference on towards a Value Management and Value Engineering Educational Framework at Master’s Level, Florida.Google Scholar
  5. Michel, J. (2001). What value societies, value association and value institutes need to see before they give accreditation? Paper presented at a Conference on towards a Value Management and Value Engineering Educational Framework at Master’s Level, Florida.Google Scholar
  6. Nash, S., Chinyio, E., Gameson, R., & Suresh, S. (2010). The dynamism of stakeholders’ power in construction projects. In C. Egbu (Ed.), 26th Annual ARCOM Conference (pp. 471–480). Leeds: Association of Researchers in Construction Management.Google Scholar
  7. Oke, A. E., & Ogunsemi, D. R. (2012). Training of quantity surveyors for value management practice. International Journal of Construction Project Management, 4(2), 147–157.Google Scholar
  8. Oke, A. E., & Ogunsemi, D. R. (2013). Key competencies of value managers in Lagos state, Nigeria. In S. Larry & S. Agyepong (Eds.), Proceeding of 5th West Africa Built Environment Research (WABER) conference (pp. 773–778). Ghana: Accra.Google Scholar
  9. Olatunji, S. O., Oke, A. E., & Owoeye, L. C. (2014). Factors affecting performance of construction professionals in Nigeria. International Journal of Engineering and Advanced Technology, 3(6), 76–84.Google Scholar
  10. Sigle, H. M., Klopper, C. H. & Visser, R. N. (2000). The South African quantity surveyor and value management. Project Pro, 23–26.Google Scholar
  11. Zanjirchi, S. M., & Moradi, M. (2012). Construction project success analysis from stakeholders’ theory perspective. African Journal of Business Management, 6(15), 5218–5225.Google Scholar

Copyright information

© Springer International Publishing AG 2017

Authors and Affiliations

  1. 1.Faculty of Engineering and the Built EnvironmentUniversity of JohannesburgJohannesburgSouth Africa

Personalised recommendations