The Fixed-Price Contract: A Challenge for the Software Development Project

  • Cornelia GaebertEmail author
Conference paper
Part of the Communications in Computer and Information Science book series (CCIS, volume 555)

Abstract

Describing the software development project between customer and supplier at the contracting level as interaction of the involved organizations in terms of game theory, we can show that the parties are in a dilemma situation regarding the effort for closing the gaps of incomplete requirement specifications. Incomplete, ambiguous, and changing requirements are the number one reason for failure of software development projects. Customer and supplier have to interchange information for closing requirement gaps. However, gathering and interchanging information generates undesirable costs. The most commonly used contract model is a fixed-price contract. Under this condition, the supplier is forced to cooperate, whereas the customer prefers to defect regarding closing requirement gaps. In support of our theoretical argument, we carried out an empirical investigation. We derive suggestions for improving the fixed-price contract design of software development projects as well as for the cooperation behavior during the project.

Keywords

Software development project Outsourcing Failure Information asymmetry Dilemma structures Incomplete contract 

References

  1. 1.
    Al-Ahmad, W., Al-Fagih, K., Khanfar, K., Alsamara, K., Abuleil, S., Abu-Salem, H.: A taxonomy of an IT project failure: root causes. Int. Manag. Rev. 5(1), 93–104 (2009)Google Scholar
  2. 2.
    Axelrod, R.: Die Evolution der Kooperation, Studienausgabe (7nd edn), München (2009)Google Scholar
  3. 3.
    Beckmann, M., Pies, I.: Freiheit durch Bindung - Zur ökonomischen Logik von Verhaltenskodizes, Diskussionspapier Nr. 2006-9, Lehrstuhl für Wirtschaftsethik der Martin-Luther-Universität Halle (2006)Google Scholar
  4. 4.
    Buhl, H.U., Meier, M.C.: Die Verantwortung der Wirtschaftsinformatik bei IT-Großprojekten. Wirtschaftsinformatik 2, 59–62 (2011)CrossRefGoogle Scholar
  5. 5.
    Chua, C.E.H., Lim, W.-K., Soh, C., Sia, S.K.: Client strategies in vendor transition: a threat balancing perspective. J. Strateg. Inf. Syst. 21(1), 72–83 (2012)CrossRefGoogle Scholar
  6. 6.
    Cockburn, A.: The end of software engineering and the start of economic-cooperative gaming. ComSIS 1(1), 1–32 (2004)CrossRefGoogle Scholar
  7. 7.
    El Emam, K., Koru, A.G.: A replicated survey of IT software project failures. IEEE Softw. 25(5), 84–90 (2008)CrossRefGoogle Scholar
  8. 8.
    Davis, L.H.: Prisoners, paradox, and rationality. Paradoxes of rationality and cooperation. In: Campell, R., Sowden, L. (eds.) Prisoner’s Dilemma and Newcomb’s Problem, pp. 46–59. UBC Press, Vancouver (1985). Reprint of American Philosophical Quarterly 14, 4, 1977, 319–327Google Scholar
  9. 9.
    Dwivedi, Y.K., Ravichandran, K., Williams, M.D., Miller, S., Lal, B., Antony, G.V., Kartik, M.: IS/IT project failures: a review of the extant literature for deriving a taxonomy of failure factors. In: Dwivedi, Y.K., Henriksen, H.Z., Wastell, D., De’, R. (eds.) TDIT 2013. IFIP AICT, vol. 402, pp. 73–88. Springer, Heidelberg (2013)CrossRefGoogle Scholar
  10. 10.
    Fink, L., Lichtenstein, Y., Wyss, S.: Ex post adaptations and hybrid contracts in software development services. Appl. Econ. 45(32), 4533–4544 (2013)CrossRefGoogle Scholar
  11. 11.
    Gauthier, D.: Maximization constrained: the rationality of cooperation. Paradoxes of rationality and cooperation. In: Campell, R., Sowden, L. (eds.) Prisoner’s Dilemma and Newcomb’s Problem, pp. 75–93. UBC Press, Vancouver (1985)Google Scholar
  12. 12.
    Gläser, J., Laudel, G.: Experteninterviews und qualitative Inhaltsanalyse, 4th edn. VS Verlag, Wiesbaden (2010)CrossRefGoogle Scholar
  13. 13.
    Hazzan, O., Dubinsky, Y.: Social perspective of software development methods: the case of the prisoner dilemma and extreme programming. In: Baumeister, H., Marchesi, M., Holcombe, M. (eds.) XP 2005. LNCS, vol. 3556, pp. 74–81. Springer, Heidelberg (2005)CrossRefGoogle Scholar
  14. 14.
    Kalnins, A., Mayer, K.J.: Relationships and hybrid contracts: an analysis of contract choice in information technology. J. Law Econ. Organ. 20(1), 207–229 (2004)CrossRefGoogle Scholar
  15. 15.
    Kano, N., Seraku, N., Takahashi, F., Tsuji, S.: Attractive quality and must be quality. Qual. J. Japan. Soc. Qual. Control 14(2), 39–44 (1984)Google Scholar
  16. 16.
    Keil, M., Smith, H.J., Pawlowski, S., Jin, L.: ‘Why didn’t somebody tell me?’: Climate, information asymmetry, and bad news about troubled projects. SIGMIS Database 35(2), 65–84 (2004)CrossRefGoogle Scholar
  17. 17.
    Klammer, B.: Empirische Sozialforschung. Eine Einführung für Kommunikationswissenschaftler und Journalisten. Utb, Konstanz (2005)Google Scholar
  18. 18.
    Liu, J.Y.-C., Chen, H.-G., Chen, C.C., Sheu, T.S.: Relationships among interpersonal conflict, requirements uncertainty, and software project performance (2011)Google Scholar
  19. 19.
    McGee, S., Greer, D.: Towards an understanding of the causes and effects of software requirements change: two case studies. Requirement Eng. 17, 133–155 (2012)CrossRefGoogle Scholar
  20. 20.
    Mayer, H.: Interview und schriftliche Befragung. Entwicklung, Durchführung und Auswertung. Oldenbourg Wissenschaftsverlag, München (2012)Google Scholar
  21. 21.
    Myers, M.D., Newman, M.: The qualitative interview in IS research: examining the craft. Inf. Organ. 17(1), 2–26 (2007)CrossRefGoogle Scholar
  22. 22.
    Natovich, J.: Vendor related risks in IT development: a chronology of an outsourced project failure. Technol. Anal. Strateg. Manag. 15(4), 409–419 (2003)CrossRefGoogle Scholar
  23. 23.
    Oestereich, B.: Der agile Festpreis und andere Preis- und Vertragsmodelle. Objekt-Spektrum 01(2006), 29–33 (2006)Google Scholar
  24. 24.
    Rustagi, S., King, W.R., Kirsch, L.J.: Predictors of formal control usage in IT outsourcing partnerships. Inf. Syst. Res. 19(2), 126–143 (2008)CrossRefGoogle Scholar
  25. 25.
    Schnell, R., Hill, P., Esser, E.: Methoden der Sozialforschung, 9th edn. Oldenbourg Wissenschaftsverlag, München (2011)Google Scholar
  26. 26.
    Spremann, K.: Asymmetrische Information. ZfB 60(5/6), 561–586 (1990)Google Scholar
  27. 27.
    Standish Group 1995: CHAOS Report. http://www.projectsmart.co.uk/docs/chaos-report.pdf. Accessed 21 June 2011
  28. 28.
    Standish Group, 2010. CHAOS MANIFESTO, The Laws of Chaos and the CHAOS 100 Best PM Practices. https://secure.standishgroup.com/reports/reports.php#reports. Accessed 26 June 2011
  29. 29.
    Tollefsen, D.: Organizations as true believers. J. Soc. Philos. 33(3), 395–410 (2002)CrossRefGoogle Scholar
  30. 30.
    Tucker, A.W.: Biographie, prisoner’s dilemma (1950). http://www.princeton.edu/pr/news/95/q1/0126tucker.html
  31. 31.
    Yilmaz, M., O’Connor, R.V., Collins, J.: Improving software development process through economic mechanism design communications. Comput. Inf. Sci. 99, 177–188 (2010)CrossRefGoogle Scholar
  32. 32.
    Zannier, C., Maurer, F.: Comparing decision making in agile and non-agile software organizations. In: Damiani, E., Concas, G., Scotto, M., Succi, G. (eds.) XP 2007. LNCS, vol. 4536, pp. 1–8. Springer, Heidelberg (2007)CrossRefGoogle Scholar

Copyright information

© Springer International Publishing Switzerland 2015

Authors and Affiliations

  1. 1.Research Group on Strategic Information Management, European Research Center for Information SystemsUniversity of MuensterMuensterGermany

Personalised recommendations