Advertisement

Resource Allocation in the Paced Assembly of Customer Specific Goods

  • Kirsten Tracht
  • Lars FunkeEmail author
Conference paper
Part of the Lecture Notes in Mechanical Engineering book series (LNME)

Abstract

The production of large-dimensioned, customer specific goods like machinery, investment goods, and special vehicles is a demanding challenge because of the integration of numerous customer specific features and the need for short delivery times. In addition, complex assembly operations require highly skilled workers to ensure the flexibility of production, which is needed to cope with varying workloads and assembly procedures. The presented paper introduces a concept for planning and controlling the production of those products, with a focus on personal allocation and assembly order development. After giving a brief problem statement, which highlights the major aspects to be considered, an overview of the literature, which copes with comparable problems, is given. The following sections introduce three means of control used in the concept and present a computational investigation of these under varying settings concerning hindering effects in assembly operations. The paper is closed by a discussion of the achieved results and a brief summary.

Keywords

Execution Time Assembly Line Assembly Line Balance Work Content Assembly Line Balance Problem 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

References

  1. 1.
    Ernst AT, Jiang H, Krishnamoorthy M, Sier D (2004) Staff scheduling and rostering: a review of applications, methods and models. Eur J Oper Res 153(1):3–27MathSciNetzbMATHCrossRefGoogle Scholar
  2. 2.
    Boysen N (2006) Production planning in mixed-model assembly lines (Produktionsplanung bei Variantenfließfertigung). In: Waldmann K-H, Stocker UM (eds) Operations research proceedings 2006, Springer, Berlin-Heidelberg, pp 11–15Google Scholar
  3. 3.
    Taiichi O (1988) Toyota production system: beyond large-scale production. Productivity Press, Cambridge (Mass)Google Scholar
  4. 4.
    Boysen N, Fliedner M, Scholl A (2006) Level-scheduling in mixed-model assembly lines (Level-Scheduling bei Variantenfließfertigung: Klassifikation, Literaturüberblick und Modellkritik), Jenaer Schriften zur Wirtschaftswissenschaft, Vol 26/2006Google Scholar
  5. 5.
    Solnon C, Cung VD, Nguyen A, Artigues C (2008) The car sequencing problem: overview of state-of-the-art methods and industrial case-study of the ROADEF’2005 challenge problem. Eur J Oper Res 191(3):912–927MathSciNetzbMATHCrossRefGoogle Scholar
  6. 6.
    Scholl A (1999) Balancing and sequencing of assembly lines, 2nd edn. Physica, HeidelbergCrossRefGoogle Scholar
  7. 7.
    Boysen N, Fliedner M, Scholl A (2007) A classification of assembly line balancing problems. Eur J Oper Res 183(2):674–693MathSciNetzbMATHCrossRefGoogle Scholar
  8. 8.
    Cevikan E, Durmusoglu MB, Unal ME (2009) A team-oriented design methodology for mixed model assembly systems. Comput Ind Eng 56(2):576–599CrossRefGoogle Scholar
  9. 9.
    Özcan U, Toklu B (2009) Balancing of mixed-model two-sided assembly lines. Comput Ind Eng 57(1):217–227CrossRefGoogle Scholar
  10. 10.
    Lee TO, Kim Y, Kim YK (2001) Two-sided assembly line balancing to maximize work relatedness and slackness. Comput Ind Eng 40(3):273–292Google Scholar
  11. 11.
    Håkansson J, Skoog E, Eriksson KM (2008) A review of assembly line balancing and sequencing including line layouts. In: Proceeding of PLANs forsknings- och tillämpningskonferens, pp 69–84Google Scholar
  12. 12.
    Dimitriadis SG (2006) Assembly line balancing and group working: a heuristic procedure for workers’ groups operating on the same product and workstation. Comput Oper Res 22(9):2757–2774Google Scholar
  13. 13.
    Chang H-J, Chan T-M (2010) Simultaneous perspective-based mixed-model assembly line balancing problem. Tamkang J Sci Eng 13(3):327–336MathSciNetzbMATHGoogle Scholar
  14. 14.
    Bartholdi JJ, Eisenstein DD (1996) A production line that balances itself. Oper Res 44:21–34zbMATHCrossRefGoogle Scholar
  15. 15.
    Armbruster D, Gel ES, Murakami J (2007) Bucket brigades with worker learning. Eur J Oper Res 176:264–274zbMATHCrossRefGoogle Scholar
  16. 16.
    Tracht K, Funke L, Joppien T (2011) Decentralised resource allocation in paced assembly processes. In: 21st International conference on production research (ICPR 21), 31 July–4 Aug, StuttgartGoogle Scholar
  17. 17.
    Tracht K, Funke L (2011) Order-related Shift Planning in Assembly (Auftragsorientierte Schichtplanung in der Montage), wt-online, 101(9):591–594Google Scholar
  18. 18.
    Tracht K, Funke L (2012) Resource allocation in manual assembly (Ressourcenallokation in der manuellen Montage), wt-online, 102(9):564–567Google Scholar
  19. 19.
    Fontaine C, Dajoz I, Meriguet J, Loreau M (2006) Functional diversity of plant-pollinator interaction webs enhances the persistence of plant communities. PLoS Biol 4(1):129–135CrossRefGoogle Scholar

Copyright information

© Springer International Publishing Switzerland 2013

Authors and Affiliations

  1. 1.Bremen Institute for Mechanical Engineering (Bime)University of BremenBremenGermany

Personalised recommendations