Abstract
A good estimation of haulage fleet productivity is a pivotal input to determine the mine fleet requirement. In open pit mining, the two major factors affecting the fleet productivity are the planned tonnage to be moved, that is based on the long-term production schedule, and the time it takes to move the dirt tonnage which depends on the mine road network. The haulage speed, haulage time and the truck load tonnages are all probabilistic values due to the uncertainty involved in real mining operations, and simulation technique is a powerful tool to capture this uncertainty. In this paper, a simulation framework is presented to estimate the productivity of haulage fleet for open pit mining operations with truck-and-shovel system. The Productivity KPI is the Tonne per Gross Operating Hour (TPGOH) for combinations of Dig and Dump locations. Historical data are used to fit probability distributions for haulage cycle components, and the mine road network and long-term production schedule are the main inputs to the model. The developed model is verified and validated through implementing it on a real case from Alberta oil sands open pit operations.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Curry, J.A., Ismay, M.J., Jameson, G.J.: Mine operating costs and the potential impacts of energy and grinding. Miner. Eng. 56, 70–80 (2014)
Oraee, K., Goodarzi, A.: General approach to distribute waste rocks between dump sites in open cast mines. In: Sixteenth International Symposium on Mine Planning and Equipment Selection (MPES 2007), pp. 701–712. Reading Matrix Inc. (2007)
Akbari, A.D., Osanloo, M., Shirazi, M.A.: Minable reserve estimation while determining ultimate pit limits (UPL) under price uncertainty by real option approach (ROA). Arch. Min. Sci. 54, 321–339 (2009)
de Cunha, R.E., Lima, H.M., de Tomi, G.: New approach for reduction of diesel consumption by comparing different mining haulage configurations. J. Environ. Manag. 172, 177–185 (2016)
Fisonga, M., Mutambo, V.: Optimization of the fleet per shovel productivity in surface mining: case study of Chilanga Cement, Lusaka Zambia. Cogent Eng. 4, 1386852 (2017)
Pasch, O., Uludag, S.: Optimization of the load-and-haul operation at an opencast colliery. J. S. Afr. Inst. Min. Metall. 118, 449–456 (2018)
Chaowasakoo, P., Seppälä, H., Koivo, H., Zhou, Q.: Improving fleet management in mines: the benefit of heterogeneous match factor. Eur. J. Oper. Res. 261, 1052–1065 (2017)
Amin, I., Adil, M., Rehman, S.U., Ahmad, I.: Simulation of truck-shovel operations using simio. Int. J. Econ. Environ. Geol. 8, 55–58 (2019)
Zeng, W.: A simulation model for truck-shovel operation (2018)
Ozdemir, B., Kumral, M.: Simulation-based optimization of truck-shovel material handling systems in multi-pit surface mines. Simul. Model. Pract. Theory 95, 36–48 (2019)
Shishvan, M., Benndorf, J.: Simulation-based optimization approach for material dispatching in continuous mining systems. Eur. J. Oper. Res. 275, 1108–1125 (2019)
Yuriy, G., Vayenas, N.: Discrete-event simulation of mine equipment systems combined with a reliability assessment model based on genetic algorithms. Int. J. Min. Reclam. Environ. 22, 70–83 (2008)
Upadhyay, S.P., Askari-Nasab, H.: Simulation and optimization approach for uncertainty-based short-term planning in open pit mines. Int. J. Min. Sci. Technol. 28, 153–166 (2018)
Rist, K.: The solution of a transportation problem by use of a Monte Carlo technique. In: Proceedings of the 1st International Symposium on Computer Application in Mining (APCOM-I), p. L2. Tucson University of Arizona (1961)
Deutsch, M., González, E., Williams, M.: Using simulation to quantify uncertainty in ultimate-pit limits and inform infrastructure placement. Min. Eng. 67, 49–55 (2015)
Kumral, M., Sari, Y.A.: Simulation-based mine extraction sequencing with chance constrained risk tolerance. Simulation 93, 527–539 (2017)
Blom, M., Pearce, A.R., Stuckey, P.J.: Short-term planning for open pit mines: a review. Int. J. Min. Reclam. Environ. 33, 318–339 (2019). https://doi.org/10.1080/17480930.2018.1448248
White, J.W., Olson, J.P., Vohnout, S.I.: On improving truck/shovel productivity in open pit mines. CIM Bull. 86, 43–49 (1993)
Suglo, R.S., Al-Hassan, S.: Use of simulation techniques in determining the fleet requirements of an open pit mine. Ghana Min. J. 9 (2007)
Ortiz, C.E.A., Curi, A., Campos, P.H.: The use of simulation in fleet selection and equipment sizing in mining. In: Mine Planning and Equipment Selection, pp. 869–877. Springer (2014)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2020 Springer Nature Switzerland AG
About this paper
Cite this paper
Upadhyay, S., Tabesh, M., Badiozamani, M., Askari-Nasab, H. (2020). A Simulation Model for Estimation of Mine Haulage Fleet Productivity. In: Topal, E. (eds) Proceedings of the 28th International Symposium on Mine Planning and Equipment Selection - MPES 2019. MPES 2019. Springer Series in Geomechanics and Geoengineering. Springer, Cham. https://doi.org/10.1007/978-3-030-33954-8_5
Download citation
DOI: https://doi.org/10.1007/978-3-030-33954-8_5
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-33953-1
Online ISBN: 978-3-030-33954-8
eBook Packages: EngineeringEngineering (R0)