Abstract
Inaccurate pre-tender cost estimates do not only contribute to cost overruns but also results in failure to implement viable projects. This study investigated factors that influence the accuracy of pre-tender cost estimates in the Zambian roads sector. The methodology adopted was a mixed method which included the use of both qualitative and quantitative approaches. The study established that the most severe accuracy-influencing factors for pre-tender cost estimates were completeness of the project information, which had SI of 87%. Clarity and details of the drawing as well as the specification having SI 85% was ranked second. The study therefore, recommends that, more time should be allocated to the design team to comprehensive prepare drawings and coordinate various players such as mechanical and civil consultants before the pre-tender estimate can be sought.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Henckel, T., McKibbin, W.J.: The economics of infrastructure in a globalized world: issues, lessons and future challenges. J. Infrastruct. Policy Dev. 1(2), 254–271 (2017). https://doi.org/10.24294/jipd.v1i2.55. https://systems.enpresspublisher.com/index.php/jipd/article/view/55/68
Goverment of the Republic of Zambia: Zambia’s National Budget. Ministry of Finance, Lusaka (2015)
AbouRizk, S., Babey, G., Karumanasseri, G.: Estimating the cost of capital projects: an empirical study of accuracy levels for municipal government projects (2008). http://www.researchgate.net/profile/Gordon_Babey/publication/237188753_Estimating_the_cost_of_capital_projects_An_empirical_study_of_accuracy_levels_for_municipal_government_projects/links/54419d770cf2a6a049a5be01.pdf?inViewer = 1&pdfJsDownload = 1&origin = pub. Accessed 7 Dec 2015
Evans, D.K, Lanham. J.D., Marsh, R.: Cost estimation method selection: matching user requirements and knowledge availability to methods (2012). https://pdfs.semanticscholar.org/835d/0ddf6eb55d08afc05d3aeb8f6b6f1826d419.pdf. http://diiconference.org/wp-content/uploads/2016/10/DII-2016-PROCEEDINGS-1.pdf
Enshassi, A., Mohamed, S., Abdel-Hadi, M.: Factors affecting the accuracy of pre-tender cost estimates in the gaza strip. J. Constr. Developing Countries, 18(1), pp. 73–94 (2013). http://diiconference.org/wp-content/uploads/2016/10/DII-2016-PROCEEDINGS-1.pdf
Aibinu, A.A., Dassanayake, D., Chau, T.V.: Use of artificial intelligence to predict the accuracy of pre-tender building cost estimate. In: Management and Innovation for a Sustainable Built Environment Conference, Amsterdam, 20–23 June 2011. http://diiconference.org/wp-content/uploads/2016/10/DII-2016-PROCEEDINGS-1.pdf
Pasco, T., Aibinu, A.A.: Project Factors Influencing the Accuracy of Early Stage Estimates. Heritance Kandalama, Sri-Lanka, University of Stanford, UK (2008). http://diiconference.org/wp-content/uploads/2016/10/DII-2016-PROCEEDINGS-1.pdf
Oladokun, G.M., Oladokun, A.A., Odesola I,A.: Undated. www.irbnet.de. http://www.irbnet.de/daten/iconda/CIB15880.pdf. Accessed 18 Aug 2016
Oberlender, G.D., Trost, S.M.: Predicting accuracy of early cost estimates based on estimate quality. J. Constr. Eng. Manage. 127(3), 173–182 (2001)
Ali, A., Kamaruzzaman, S.: Cost performance for building construction projects in Klang Valley. J. Build. Perfom. 1(1), 110–118 (2010)
Kaliba, C.: Cost Escalation, Schedule overruns and Quality Shortfalls on Construction Projects, A Thesis submitted in partial fulfilment of the requirements of the University of Zambia for a Degree of Master of Engineering. Lusaka: University of Zambia, Lusaka. Unpublished (2010)
Cantarelli, C.C., Flyvbjerg, B., Molin, E.J.E., van Wee, B.: Cost overruns in large-scale transportation infrastructure projects: explanations and their theoretical embeddedness. Eur. J. Transp. Infrastruct. Res. 10(1), 5–18 (2010)
Cong, J., Mbachu, J., Domingo, N.: Factors influencing the accuracy of precontract stage estimation of final contract price in New Zealand. Int. J. Constr. 4(2), 51–64 (2014)
Nor, A.A.B., et al.: Factors Influencing the Construction Cost of Industrialised. Elsevier, Malaysia (2012)
Ramabodu, M.S.: Procurement Guidelines for Project Success in Cost Planning of Construction project, Bloemfontein, Free State, University of the Free State: A thesis Submitted in partial fulfilment of the requirements of University of the Free State for the Degree of Doctor of Philosophy (2014)
Alumbugu, P.: Assessment of the factors affecting accuracy of pre-tender cost estimate in Kaduna state Nigeria. IOSR J. Environ. Sci,. Toxicol. Food Technol. 8(5), 19–27 (2014)
Ardianto, D.: Analysis of factors Affecting the Accuracy of Early Cost Estimates in Construction Projects, Johor Bahru, Johor, Malaysia: A thesis submitted in fulfilment of the requirements of Universiti Teknologi Malaysia for the degree master of science construction Management (2011)
Hair, J.F., Anderson, R.E., Tatham, R.L., Black, W.C.: Multivariate Data Analysis, 5th edn. Prentice-Hall International Inc., New Jersey (1998)
Peter, R., Peter, V.: An assessment of the internal consistency of measures of constructs used to revise the innovation decision framework. In: Conference Proceedings Academy of World Business, Marketing & Management Development, vol. 3, no. 1, July 2008
Jonsson, A., Svingby, G.: The use of scoring ubrics: reliability, validity and educational consequencies. ScienceDirect 2, 131–141 (2007)
Alinaitwe, H., Ruth, A., Tindiwensi, D.: Investigation into the causes of delays and cost overruns in Uganda’s public sector construction projects. J. Constr. Develop. Countries, Issue 18(2), 33–47 (2013)
Baruch, Y., Holtom, B.C.: Survey response rate levels and trends in organizational research (2009). https://www.researchgate.net/publication/228079609Survey_Response_Rate_Levels_and_Trends_in_Organizational_Research
Eshofonie, F.P.: Factors Affecting Cost Construction in Nigeria, a thesis submitted in Patial fulfilment of the requirements of University of Lagos Akoka for the degree of master of Construction Management. University of Lagos, Akoka, Lagos (2008)
US Goverment Accountability Office (2009). GAO COST ESTIMATING AND ASSESSMENT GUIDE, Best Practices for Developing and Managing Capital Program cost, Washington DC: US Goverment Accountability Office
Mislick, G.K., Nussbaum, D.A.: Cost Estimation Methods and Tools. Wiley & Sons Inc, New Jersey (2015)
Mulcahy. R.: PMP Exam Prep By Rita Mulcahy, 2013 Eighth Edition, Rita’s Course in a Book for Passing the PMP Exam Paperback – 2013. http://www.parliament.gov.zm/sites/default/files/images/publication_docs/2015%20Budget%20Speech_0.pdf
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2020 Springer Nature Switzerland AG
About this paper
Cite this paper
Chipulu, C., Mwanaumo, E., Mwiya, B., Haabazoka, L., Chisumbe, S. (2020). Accuracy Influencing Factors for Pre-tender Cost Estimates for the Roads Sector in Zambia. In: Aigbavboa, C., Thwala, W. (eds) The Construction Industry in the Fourth Industrial Revolution. CIDB 2019. Springer, Cham. https://doi.org/10.1007/978-3-030-26528-1_56
Download citation
DOI: https://doi.org/10.1007/978-3-030-26528-1_56
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-26527-4
Online ISBN: 978-3-030-26528-1
eBook Packages: EngineeringEngineering (R0)