Accuracy Influencing Factors for Pre-tender Cost Estimates for the Roads Sector in Zambia

  • Conference paper
  • First Online:
The Construction Industry in the Fourth Industrial Revolution (CIDB 2019)

Abstract

Inaccurate pre-tender cost estimates do not only contribute to cost overruns but also results in failure to implement viable projects. This study investigated factors that influence the accuracy of pre-tender cost estimates in the Zambian roads sector. The methodology adopted was a mixed method which included the use of both qualitative and quantitative approaches. The study established that the most severe accuracy-influencing factors for pre-tender cost estimates were completeness of the project information, which had SI of 87%. Clarity and details of the drawing as well as the specification having SI 85% was ranked second. The study therefore, recommends that, more time should be allocated to the design team to comprehensive prepare drawings and coordinate various players such as mechanical and civil consultants before the pre-tender estimate can be sought.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Henckel, T., McKibbin, W.J.: The economics of infrastructure in a globalized world: issues, lessons and future challenges. J. Infrastruct. Policy Dev. 1(2), 254–271 (2017). https://doi.org/10.24294/jipd.v1i2.55. https://systems.enpresspublisher.com/index.php/jipd/article/view/55/68

    Article  Google Scholar 

  2. Goverment of the Republic of Zambia: Zambia’s National Budget. Ministry of Finance, Lusaka (2015)

    Google Scholar 

  3. AbouRizk, S., Babey, G., Karumanasseri, G.: Estimating the cost of capital projects: an empirical study of accuracy levels for municipal government projects (2008). http://www.researchgate.net/profile/Gordon_Babey/publication/237188753_Estimating_the_cost_of_capital_projects_An_empirical_study_of_accuracy_levels_for_municipal_government_projects/links/54419d770cf2a6a049a5be01.pdf?inViewer = 1&pdfJsDownload = 1&origin = pub. Accessed 7 Dec 2015

  4. Evans, D.K, Lanham. J.D., Marsh, R.: Cost estimation method selection: matching user requirements and knowledge availability to methods (2012). https://pdfs.semanticscholar.org/835d/0ddf6eb55d08afc05d3aeb8f6b6f1826d419.pdf. http://diiconference.org/wp-content/uploads/2016/10/DII-2016-PROCEEDINGS-1.pdf

  5. Enshassi, A., Mohamed, S., Abdel-Hadi, M.: Factors affecting the accuracy of pre-tender cost estimates in the gaza strip. J. Constr. Developing Countries, 18(1), pp. 73–94 (2013). http://diiconference.org/wp-content/uploads/2016/10/DII-2016-PROCEEDINGS-1.pdf

  6. Aibinu, A.A., Dassanayake, D., Chau, T.V.: Use of artificial intelligence to predict the accuracy of pre-tender building cost estimate. In: Management and Innovation for a Sustainable Built Environment Conference, Amsterdam, 20–23 June 2011. http://diiconference.org/wp-content/uploads/2016/10/DII-2016-PROCEEDINGS-1.pdf

  7. Pasco, T., Aibinu, A.A.: Project Factors Influencing the Accuracy of Early Stage Estimates. Heritance Kandalama, Sri-Lanka, University of Stanford, UK (2008). http://diiconference.org/wp-content/uploads/2016/10/DII-2016-PROCEEDINGS-1.pdf

  8. Oladokun, G.M., Oladokun, A.A., Odesola I,A.: Undated. www.irbnet.de. http://www.irbnet.de/daten/iconda/CIB15880.pdf. Accessed 18 Aug 2016

  9. Oberlender, G.D., Trost, S.M.: Predicting accuracy of early cost estimates based on estimate quality. J. Constr. Eng. Manage. 127(3), 173–182 (2001)

    Article  Google Scholar 

  10. Ali, A., Kamaruzzaman, S.: Cost performance for building construction projects in Klang Valley. J. Build. Perfom. 1(1), 110–118 (2010)

    Google Scholar 

  11. Kaliba, C.: Cost Escalation, Schedule overruns and Quality Shortfalls on Construction Projects, A Thesis submitted in partial fulfilment of the requirements of the University of Zambia for a Degree of Master of Engineering. Lusaka: University of Zambia, Lusaka. Unpublished (2010)

    Google Scholar 

  12. Cantarelli, C.C., Flyvbjerg, B., Molin, E.J.E., van Wee, B.: Cost overruns in large-scale transportation infrastructure projects: explanations and their theoretical embeddedness. Eur. J. Transp. Infrastruct. Res. 10(1), 5–18 (2010)

    Google Scholar 

  13. Cong, J., Mbachu, J., Domingo, N.: Factors influencing the accuracy of precontract stage estimation of final contract price in New Zealand. Int. J. Constr. 4(2), 51–64 (2014)

    Google Scholar 

  14. Nor, A.A.B., et al.: Factors Influencing the Construction Cost of Industrialised. Elsevier, Malaysia (2012)

    Google Scholar 

  15. Ramabodu, M.S.: Procurement Guidelines for Project Success in Cost Planning of Construction project, Bloemfontein, Free State, University of the Free State: A thesis Submitted in partial fulfilment of the requirements of University of the Free State for the Degree of Doctor of Philosophy (2014)

    Google Scholar 

  16. Alumbugu, P.: Assessment of the factors affecting accuracy of pre-tender cost estimate in Kaduna state Nigeria. IOSR J. Environ. Sci,. Toxicol. Food Technol. 8(5), 19–27 (2014)

    Article  Google Scholar 

  17. Ardianto, D.: Analysis of factors Affecting the Accuracy of Early Cost Estimates in Construction Projects, Johor Bahru, Johor, Malaysia: A thesis submitted in fulfilment of the requirements of Universiti Teknologi Malaysia for the degree master of science construction Management (2011)

    Google Scholar 

  18. Hair, J.F., Anderson, R.E., Tatham, R.L., Black, W.C.: Multivariate Data Analysis, 5th edn. Prentice-Hall International Inc., New Jersey (1998)

    Google Scholar 

  19. Peter, R., Peter, V.: An assessment of the internal consistency of measures of constructs used to revise the innovation decision framework. In: Conference Proceedings Academy of World Business, Marketing & Management Development, vol. 3, no. 1, July 2008

    Google Scholar 

  20. Jonsson, A., Svingby, G.: The use of scoring ubrics: reliability, validity and educational consequencies. ScienceDirect 2, 131–141 (2007)

    Google Scholar 

  21. Alinaitwe, H., Ruth, A., Tindiwensi, D.: Investigation into the causes of delays and cost overruns in Uganda’s public sector construction projects. J. Constr. Develop. Countries, Issue 18(2), 33–47 (2013)

    Google Scholar 

  22. Baruch, Y., Holtom, B.C.: Survey response rate levels and trends in organizational research (2009). https://www.researchgate.net/publication/228079609Survey_Response_Rate_Levels_and_Trends_in_Organizational_Research

  23. Eshofonie, F.P.: Factors Affecting Cost Construction in Nigeria, a thesis submitted in Patial fulfilment of the requirements of University of Lagos Akoka for the degree of master of Construction Management. University of Lagos, Akoka, Lagos (2008)

    Google Scholar 

  24. US Goverment Accountability Office (2009). GAO COST ESTIMATING AND ASSESSMENT GUIDE, Best Practices for Developing and Managing Capital Program cost, Washington DC: US Goverment Accountability Office

    Google Scholar 

  25. Mislick, G.K., Nussbaum, D.A.: Cost Estimation Methods and Tools. Wiley & Sons Inc, New Jersey (2015)

    Book  Google Scholar 

  26. Mulcahy. R.: PMP Exam Prep By Rita Mulcahy, 2013 Eighth Edition, Rita’s Course in a Book for Passing the PMP Exam Paperback – 2013. http://www.parliament.gov.zm/sites/default/files/images/publication_docs/2015%20Budget%20Speech_0.pdf

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Erastus Mwanaumo .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Chipulu, C., Mwanaumo, E., Mwiya, B., Haabazoka, L., Chisumbe, S. (2020). Accuracy Influencing Factors for Pre-tender Cost Estimates for the Roads Sector in Zambia. In: Aigbavboa, C., Thwala, W. (eds) The Construction Industry in the Fourth Industrial Revolution. CIDB 2019. Springer, Cham. https://doi.org/10.1007/978-3-030-26528-1_56

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-26528-1_56

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-26527-4

  • Online ISBN: 978-3-030-26528-1

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics