Improving the Availability of a Production Line Through TPM in an Automotive Gearbox Industrial Unit

  • Inês M. Ribeiro
  • Radu Godina
  • João C. O. MatiasEmail author
Conference paper
Part of the Springer Proceedings in Mathematics & Statistics book series (PROMS, volume 281)

Abstract

It is ever more necessary that equipment, systems, and installations operate as long as possible without failures. And when failures occur they must be as short as possible. This is when maintenance becomes actively important through the obligation of giving a quick response, efficiently, and economically. To be successful at these types of responses, it is fundamental to continually improve the practices used in maintenance activities. This paper focuses on the use of the TPM methodology combined with a few lean thinking tools in order to optimize the availability of a critical production line in a company which produces mechanical components and gearboxes for the automotive industry. To measure the success of the implemented actions and to compare the final results with the initial situation, a few indicators were used: Overall Equipment Effectiveness (OEE), Mean Time Between Failures (MTBF) and Mean Time to Repair (MTTR).

Keywords

TPM OEE Availability Lean thinking Automotive industry 

Notes

Acknowledgements

This work was financially supported by the research unit on Governance, Competitiveness and Public Policy (project POCI-01-0145-FEDER-006939), funded by FEDER funds through COMPETE2020—POCI and by national funds through FCT—Fundação para a Ciência e a Tecnologia. Radu Godina would like to acknowledge financial support from Fundação para a Ciência e Tecnologia (UID/EMS/00667/2019).

References

  1. 1.
    Bakri, A.H., Rahim, A.R.A., Yusof, N.M., Ahmad, R.: Boosting lean production via TPM. Procedia—Soc. Behav. Sci. 65, 485–491 (2012)CrossRefGoogle Scholar
  2. 2.
    Ahuja, I.P.S.: Total productive maintenance. In: Handbook of Maintenance Management and Engineering, pp. 417–459. Springer London, London (2009)Google Scholar
  3. 3.
    Méndez, J.D.M., Rodriguez, R.S.: Total productive maintenance (TPM) as a tool for improving productivity: a case study of application in the bottleneck of an auto-parts machining line. Int. J. Adv. Manuf. Technol. 92, 1013–1026 (2017)CrossRefGoogle Scholar
  4. 4.
    Agustiady, T., Cudney, E.: Total Productive Maintenance. CRC Press, Boca Raton (2015). https://doi.org/10.1201/b18641
  5. 5.
    Kumar Gupta, A., Garg, R.K.: OEE improvement by TPM implementation: a case study. Int. J. IT Eng. Appl. Sci. Res. Int. Res. J. Consort. 1, 2319–4413 (2012)Google Scholar
  6. 6.
    Thun, J.-H.: Maintaining preventive maintenance and maintenance prevention: analysing the dynamic implications of total productive maintenance. Syst. Dyn. Rev. 22, 163–179 (2006)CrossRefGoogle Scholar
  7. 7.
    Batumalay, K., Santhapparaj, A.S.: Overall equipment effectiveness (OEE) through total productive maintenance (TPM) practices—a study across the Malaysian industries. In: 2009 International Conference for Technical Postgraduates (TECHPOS), pp. 1–5. IEEE (2009)Google Scholar
  8. 8.
    Østbø, P., Wetherill, M., Cattermole, R.: Defining and understanding the core lean tools. In: Leading Beyond Lean, pp. 44–87. Palgrave Macmillan, London (2016)Google Scholar
  9. 9.
    Benjamin, S.J., Marathamuthu, M.S., Murugaiah, U.: The use of 5-WHYs technique to eliminate OEE’s speed loss in a manufacturing firm. J. Qual. Maint. Eng. 21, 419–435 (2015)CrossRefGoogle Scholar
  10. 10.
    Candra, N.E., Susilawati, A., Herisiswanto, Setiady, W.: Implementation of total productive maintenance (TPM) to improve sheeter machine performance. In: MATEC Web Conferences, vol. 135 (2017)Google Scholar
  11. 11.
    Ahmad, N., Hossen, J., Ali, S.M.: Improvement of overall equipment efficiency of ring frame through total productive maintenance: a textile case. Int. J. Adv. Manuf. Technol. 94, 239–256 (2018)CrossRefGoogle Scholar
  12. 12.
    Garza-Reyes, J.A.: From measuring overall equipment effectiveness (OEE) to overall resource effectiveness (ORE). J. Qual. Maint. Eng. 21, 506–527 (2015)CrossRefGoogle Scholar
  13. 13.
    Dadashnejad, A.-A., Valmohammadi, C.: Investigating the effect of value stream mapping on overall equipment effectiveness: a case study. Total Qual. Manag. Bus. Excell. 30, 466–482 (2019)Google Scholar

Copyright information

© Springer Nature Switzerland AG 2019

Authors and Affiliations

  • Inês M. Ribeiro
    • 1
  • Radu Godina
    • 2
  • João C. O. Matias
    • 1
    • 3
    Email author
  1. 1.DEGEITUniversity of AveiroAveiroPortugal
  2. 2.Research and Development Unit in Mechanical and Industrial Engineering (UNIDEMI), Department of Mechanical and Industrial Engineering, Faculty of Science and Technology (FCT)Universidade NOVA de LisboaCaparicaPortugal
  3. 3.GOVCOPPUniversity of AveiroAveiroPortugal