Advertisement

Investigation into the Critical Sources of Wastes Influencing the Performance of Construction Projects in Morocco

  • Mohamed Saad BajjouEmail author
  • Anas Chafi
Conference paper
Part of the Lecture Notes in Intelligent Transportation and Infrastructure book series (LNITI)

Abstract

Construction projects worldwide are significantly affected by waste occurrences which negatively influence their performance. Nevertheless, limited studies have been performed aiming at waste assessment, especially in developing countries. In the current study, 24 sources of wastes were identified through a review of previous works, consolidated by interviews with Moroccan construction experts. Subsequently, a structured questionnaire was used to survey 330 Moroccan construction professionals to explore the critical sources of wastes in Morocco. “Activity start delays” was found to be the most significant source of waste according to the perceptions of the surveyed respondents. Furthermore, the statistical analysis revealed that the top three ranked waste categories were: 1—unused employee creativity, 2—delay and waiting, and 3—defects/errors/corrections. These findings are expected to help practitioners and managers of construction projects to focus their resources and interest on the main sources of wastes and to establish, therefore, more effective strategies for waste reduction.

Keywords

Critical sources of wastes Survey Construction industry Morocco 

References

  1. 1.
    Shehu, Z., Endut, I.R., Akintoye, A., Holt, G.D.: Cost overrun in the Malaysian construction industry projects: a deeper insight. Int. J. Project Manage. 32(8), 1471–1480 (2014)CrossRefGoogle Scholar
  2. 2.
    Bajjou, M.S., Chafi, A.: Lean construction implementation in the Moroccan construction industry: awareness, benefits and barriers. J. Eng. Des. Technol. 16(4), 533–556 (2018).  https://doi.org/10.1108/JEDT-02-2018-0031CrossRefGoogle Scholar
  3. 3.
    Bajjou, M.S., Chafi, A., En-Nadi, A.: The potential effectiveness of lean construction tools in promoting safety on construction sites. Int. J. Eng. Res. Africa 33, 179–193 (2017)CrossRefGoogle Scholar
  4. 4.
    Tableau de bord sectoriel: Ministry of Economy and Finance, 88p (2015)Google Scholar
  5. 5.
    Khanh, H.D., Kim, S.Y.: Development of waste occurrence level indicator in Vietnam construction industry. Eng. Constr. Architect. Manage. 22(6), 715–731 (2015)CrossRefGoogle Scholar
  6. 6.
    Khanh, H.D., Kim, S.Y.: Identifying causes for waste factors in high-rise building projects: a survey in Vietnam. KSCE J. Civil Eng. 18(4), 865–874 (2014)CrossRefGoogle Scholar
  7. 7.
    Khanh, H.D., Kim, S.Y.: Evaluating impact of waste factors on project performance cost in Vietnam. KSCE J. Civil Eng. 18(7), 1923–1933 (2014)CrossRefGoogle Scholar
  8. 8.
    El-Namrouty, K.A., Abushaaban, M.S.: Seven wastes elimination targeted by lean manufacturing case study “gaza strip manufacturing firms’’. Int. J. Econ. Finance Manage. Sci. 1(2), 68–80 (2013)Google Scholar
  9. 9.
    Nikakhtar, A., Hosseini, A.A., Wong, K.Y., Zavichi, A.: Application of lean construction principles to reduce construction process waste using computer simulation: a case study. Int. J. Serv. Oper. Manage. 20(4), 461–480 (2015)Google Scholar
  10. 10.
    Garas, G.L., Anis, A.R., El Gammal, A.: Materials waste in the Egyptian construction industry. In: Proceedings IGLC-9, Singapore (2001)Google Scholar
  11. 11.
    Bajjou, M.S., Chafi, A.: Towards implementing lean construction in the Moroccan construction industry: Survey study. In: 4th International Conference on Optimization and Applications (ICOA), pp. 1–5. IEEE, April 2018Google Scholar
  12. 12.
    Bajjou, M.S., Chafi, A.: Barriers of lean construction implementation in the Moroccan construction industry. In: AIP Conference Proceedings, vol. 1952, No. 1, p. 020056. AIP Publishing (2018)Google Scholar
  13. 13.
    Bossink, B.A.G., Brouwers, H.J.H.: Construction waste: quantification and source evaluation. J. Constr. Eng. Manage. 122(1), 55–60 (1996)CrossRefGoogle Scholar
  14. 14.
    Oko John, A., Emmanuel Itodo, D.: Professionals’ views of material wastage on construction sites and cost overruns. Organ. Technol. Manage. Constr. Int. J. 5(1), 747–757 (2013)Google Scholar
  15. 15.
    Bajjou, M.S., Chafi, A., En-Nadi, A.: A comparative study between lean construction and the traditional production system. Int. J. Eng. Res. Africa 29, 118–132 (2017)CrossRefGoogle Scholar
  16. 16.
    Koskela, L. Application of the new production philosophy to construction (Vol. 72). Stanford, CA: Stanford university, 1992Google Scholar
  17. 17.
    Bajjou, M.S., Chafi, A., Ennadi, A., El Hammoumi, M.: The practical relationships between lean construction tools and sustainable development: a literature review. J. Eng. Science & Technol. Rev. 10(4), 170–177 (2017)CrossRefGoogle Scholar
  18. 18.
    Jin, R., Hancock, C., Tang, L., Chen, C., Wanatowski, D., Yang, L.: Empirical study of BIM implementation-based perceptions among chinese practitioners. J. Manage. Eng. 33(5), 04017025 (2017)CrossRefGoogle Scholar
  19. 19.
    Bajjou, M.S., Chafi, A.: Empirical study of schedule delay in Moroccan construction projects. Int. J. Constr. Manage.  https://doi.org/10.1080/15623599.2018.1484859

Copyright information

© Springer Nature Switzerland AG 2019

Authors and Affiliations

  1. 1.Department of Industrial Engineering, Faculty of Sciences and TechniquesSidi Mohamed Ben Abdellah UniversityFezMorocco

Personalised recommendations