Abstract

Based on 300 t top-bottom combined blowing converter bottom air brick location layout problems, ANSYS Fluent software is adopted to establish the three-dimensional model, which simulated the change after the location of the four air brick at the bottom of the flow of molten steel in the converter. The results show that when the bottom blow flow is constant, the four bottom permeable bricks should adopt asymmetric staggered layout, which is beneficial to uniform converter flow field. At the same time, it was found that the angle of the bottom-blown gas supply element is different and the influence on the wall scour is different. When the position of the bottom blown air brick is determined, the inclination angle of the air supply element is 10°, the molten steel has relatively less erosion on the furnace wall of the converter, the flow field in the converter is more reasonable, and the cost is saved for the converter smelting.

Keywords

300t converter Bottom blown breathable brick Gun position angle 

References

  1. 1.
    Xiaofang Jiang (2002) Current status and development of Baotou steel’s 300t converter combined blowing. Baosteel Technol 3:1–4Google Scholar
  2. 2.
    Pei Pei, Fuhai Liu, Rong Zhu (2017) Research on optimization of bottom blowing arrangement of 300t converter. Ind Heating 46(3):20–22Google Scholar
  3. 3.
    Mori A et al (1989) Optimum arrangement of botom tuyeres in 160t top and bottom blowing BOF. In: Steelmaking conference proceedings, 1989, pp 443–446Google Scholar
  4. 4.
    Kyoji Nakanishi et al (1980) Cold model study on the mixing rates of slag and metal bath in Q-BOP. J Iron Steel Inst Jpn 66(9):1307–1316CrossRefGoogle Scholar
  5. 5.
    Paul S, Ghosh. DN (1986) Model study of mixing and mass transfer rates of slag-metal in top and bottom blown converters. Metall Trans 17B(9):461–469CrossRefGoogle Scholar
  6. 6.
    Roth Christian, Peter Michael et al (1995) Cold model investigations into the effects of bottom blowing in metallurgical reactors. Steel Res 66(8):325–330CrossRefGoogle Scholar
  7. 7.
    Tatjana S et al (2002) Bottom blowing investigations on a cold model reactor to optimize mixing behavior in metallurgical process. Steel Res 73(9):373–377CrossRefGoogle Scholar
  8. 8.
    Rongsheng Zhang, Longgen Chen, Yisheng Zhou (1983) Hydraulic research on stirring of top bottom blowing and smelting pool. J Iron Steel Res Inst 3(1):14–22Google Scholar
  9. 9.
    Wenjin Wang (2013) Three-dimensional compressible fluid simulation of porous jet top-blown converter. Mod Metall 2(1):32–40Google Scholar
  10. 10.
    Yan W, Li Y, Zhu M (2011) Numerical simulation of gas-liquid two-phase prevalence in top-bottom combined blown converter. J Process Eng 2011, 11Google Scholar

Copyright information

© The Minerals, Metals & Materials Society 2019

Authors and Affiliations

  • Yun Huang
    • 1
  • Chengbo Wu
    • 1
    Email author
  • Yong Zhong
    • 1
  • Haitao Zhang
    • 1
  • Gaopeng Zhang
    • 1
  1. 1.College of Materials Science and EngineeringChongqing UniversityChongqingChina

Personalised recommendations