Abstract
Throughout the construction phase of the cold mass for SSC magnets, electrical tests are made to determine that no faults in the coil structure have developed. These tests include ones designed to measure turn-to-turn voltage hold-off, hypot tests to ground, coil resistance, and instrumentation checks. These various tests will be described and the test parameters that are used will be covered.
Keywords
Voltage Drop Impulse Test Coil Resistance Cold Mass Ampere Current
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.
Preview
Unable to display preview. Download preview PDF.
Copyright information
© Plenum Press, New York 1989