This paper is concerned with loading schedule of manufacturing orders in Material Requirement Planning (MRP) environment. A prototypical loading system developed by using MP (mathematical programming) logic and KB (Knowledge-Based) system approach are discussed for practical loading problem and compareed their features.

Keywords

Planning Horizon Goal Programming Shop Floor Aspiration Level Demand Level 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. 1.
    Hiraiwa, A. A study on order loading system for MRP : Apprication of optimizimg approach and extention to multi-item model for rule-based system, Unpublished paper, Graduate School of Waseda University, Tokyo, 1991Google Scholar
  2. 2.
    Katayama, H. and Izumi, T. On a rule-based order loading system for MRP, Industrial Engineering and Management Press, Norcross, Georgia, 1990Google Scholar
  3. 3.
    Oricky, J. Material Requirement Planning, McGraw-Hill, 1975Google Scholar

Copyright information

© Operations Management Association-UK 1991

Authors and Affiliations

  • Yuji Tanaka
    • 1
  • Fujiya Ogawa
    • 1
  • Hiroshi Katayama
    • 2
  1. 1.Osaka Steel WorksSumitomo Metal Industries LtdOsakaJapan
  2. 2.Waseda UniversityTokyoJapan

Personalised recommendations