Probabilistic Safety Assessment and Management pp 1906-1911 | Cite as
Differences Between Full Power Operation and Low Power / Shutdown Operation, and the Implications on the LPSD Standard
Conference paper
Abstract
This paper summarizes differences between plant operations at full power and non-power, the associated differences in risk modeling, and the implications on the LPSD Standard.
Keywords
Full Power Pressurize Water Reactor Probabilistic Risk Assessment Decay Heat Core Damage
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.
Preview
Unable to display preview. Download preview PDF.
Copyright information
© Springer-Verlag London 2004