Abstract

To ensure short delivery time and high delivery performance it is necessary to have control over manufacturing procedures and to keep lead times to a minimum. At the same time production profitability must be guaranteed. The interaction between these (and other) objectives and occurring conflicts can be investigated with bottleneck-oriented logistic analysis, which makes it possible, for example, to determine ideal states and realizable values for lead times and inventory for existing or planned production structures. In addition, the system behaviour of the production can be investigated with varied side constraints; also the effects of measures taken to influence the logistics potential can be described qualitatively and quantitatively. This allows an objective-oriented optimization of the manufacturing procedures and structures with regard to business re-engineering.

Keywords

Bottleneck-oriented logistic analysis logistic operating curves logistics positioning simulation. 

References

  1. Bechte, W. (1984) Steuerung derDurchlaufzeit durch belastungsorientierte Auftragsfreigabe bei Werkstattfertigung. Fortschritt-Berichte VDI, Row 2, No. 70, Düsseldorf.Google Scholar
  2. Kuhn, A. (1992) Modellgestützte Logistik - Methodik einer permanenten ganzheitlichenGoogle Scholar
  3. Systemgestaltung, in Rechnergestützte Fabrikplanung ‘82. VDI-Berichte 949, Düsseldorf. Kuprat, Th. (1991) Simulationsgestützte Beurteilung der logistischen Qualität von Produktionsstrukturen. Fortschritt-Berichte VDI, Row 2, No. 228, Düsseldorf.Google Scholar
  4. Nyhuis, P. (1991) Durchlauforientierte Losgrößenbestintmung. Fortschritt-Berichte VDI, Row 2, No. 225, Düsseldorf.Google Scholar
  5. Nyhuis, P. (1993) Betriebskennlinien zur Entscheidungsunterstützung in der Produktionsplanung und -steuerung, in Neue Wege der PPS (ed. H.-P. Wiendahl), gfmt-Verlag, München.Google Scholar
  6. Rice, W. und Gross, R. (1990) Simulation Technique and the WIPAC Curve for BalancingGoogle Scholar
  7. Capacity against Inventory. APICS,33rd International Conference Proceedings, New Orleans. Wiendahl, H.-P. (1987) Belastungsorientierte Fertigungssteuerung. Grundlagen, Verfahrensaufbau, Realisierung. Hanser-Verlag, München, Wien.Google Scholar
  8. Zäpfel, G. and Hödlmoser, P. (1992) Läßt sich das KANBAN-Konzept bei einer Varianten- fertigung wirtschaftlich einsetzen? Zeitschrift für Betriebswirtschaft, 62nd Annual, No. 4.Google Scholar

Copyright information

© Springer Science+Business Media Dordrecht 1995

Authors and Affiliations

  • T. Penz
    • 1
  • P. Nyhuis
    • 1
  1. 1.Institute for Production SystemsUniversity of HannoverHannoverGermany

Personalised recommendations