Managing the Supply and Demand Uncertainty in Assembly Systems

  • Hongze Ma
  • Kesheng Wang
Part of the IFIP International Federation for Information Processing book series (IFIPAICT, volume 207)

Abstract

To react to changing market rapidly, some companies outsource all components, and then assemble them into end product to fulfill customer demand. For such assembly systems, the marketing environment at both supply and demand sides is quite volatile. So, agility is one of the key factors for them to win the competition. In this paper, a simulation model is built for an assembly system, in which both supply and demand uncertainties are considered. Then, by this model, the effect of supply and demand uncertainty on the performance of the system is studied, and the approach on how to manage such uncertainties is provided. To achieve agility, managers of the assembly systems can utilize such results to adjust their assembly schedule to adapt to the different levels of supply and demand uncertainty.

Key words

Assembly system inventory management supply and demand uncertainty simulation 

6. References

  1. 1.
    Clark, A., Scarf, H., (1960), Optimal policies for multi-echelon inventory problem, Management Science 6, 475–490.CrossRefGoogle Scholar
  2. 2.
    Diks, E.B., Kok, A.G., (1998), Optimal control of a divergent multi-echelon inventory system, European Journal of Operational Research.Google Scholar
  3. 3.
    Heijden, M., (1999), Inventory control in multi-echelon divergent systems with random lead times, Springer Verlag.Google Scholar
  4. 4.
    Graves, S.C., Willems, S.P., (2000), “Optimizing strategic safety stock placement in supply chains”, Manufacturing Service Operation Management 2, 68–83.CrossRefGoogle Scholar
  5. 5.
    Cachon, G.P., (2001), Exact evaluation of batch ordering inventory policies in two-echelon supply chains with periodic review, Operation Research, Vol. 49, No. 1.Google Scholar
  6. 6.
    Chopra, S., Meindl, P., (2004), Supply chain management: strategy, planning and operation, Prentice Hall, 250–340.Google Scholar
  7. 7.
    Bertolini, M, Rizzi, A., (2002), A simulation approach to manage finished goods inventory replenishment economically in a mixed push/pull environment, Logistics Information Management, Vol. 15, No. 4, pp. 281–293.CrossRefGoogle Scholar
  8. 8.
    Bollapragada, R., Rao, U.S., Zhang, J., (2004), Managing inventory and supply performance in assembly systems with random supply capacity and demand, Management Science, Vol. 50, No., 12, pp. 1729–1743.CrossRefGoogle Scholar
  9. 9.
    Decroix, G.A., Zipkin, P.H., (2005), Inventory management for an assembly system with product or component returns, Management Science, Vol. 51, Issues 8, pp. 1250–1266.MathSciNetCrossRefGoogle Scholar

Copyright information

© International Federation for Information Processing 2006

Authors and Affiliations

  • Hongze Ma
    • 1
  • Kesheng Wang
    • 2
  1. 1.Logistics, Turku School of Economics and Business AdministrationTurkuFinland
  2. 2.Norwegian University of Science and TechnologyTrondheimNorway

Personalised recommendations