Summary
The prime objective of Phase 3 of Project 955 was the development of conformance testing technology required for products based on the MAP/TOP 3.0 specification. The test tools formed an important part of the testing preparations for the Enterprise Networking Event 88i, staged in Baltimore, Maryland USA as well as having been used within the CNMA project.
The results of the project are now being exploited after further refinement through a distributor network covering Europe, the Americas and Japan.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Author information
Authors and Affiliations
Editor information
Rights and permissions
Copyright information
© 1989 ECSC, EEC, EAEC, Brussels and Luxembourg
About this paper
Cite this paper
Knight, G.R. (1989). Conformance Testing CNMA Phase 3 (CCT). In: Esprit ’89. Springer, Dordrecht. https://doi.org/10.1007/978-94-009-1063-8_53
Download citation
DOI: https://doi.org/10.1007/978-94-009-1063-8_53
Publisher Name: Springer, Dordrecht
Print ISBN: 978-94-010-6968-7
Online ISBN: 978-94-009-1063-8
eBook Packages: Springer Book Archive