Abstract
Most of the problems defined in the scheduling literature do not yet take into account the energy consumption of manufacturing processes, as in most of the variants with tardiness objectives. This study handles scheduling of jobs with due dates and sequence-dependent setup times (SMWTSD), while minimizing total weighted tardiness and total energy consumed in machine operations. The trade-off between total energy consumption (TEC) and total weighted tardiness is examined in a single machine environment, where different jobs can be operated at varying speed levels. A bi-objective mixed integer linear programming model is formulated including this speed-scaling plan. Moreover, an efficient multi-objective block insertion heuristic (BIH) and a multi-objective iterated greedy (IG) algorithm are proposed for this NP-hard problem. The performances of the proposed BIH and IG algorithms are compared with each other. The preliminary computational results on a benchmark suite consisting of instances with 60 jobs reveal that, the proposed BIH algorithm is very promising in terms of providing good Pareto frontier approximations for the problem.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Fang, K., Uhan, N., Zhao, F., Sutherland, J.W.: A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction. J. Manuf. Syst. 30(4), 234–240 (2011)
Mouzon, G., Yildirim, M.B., Twomey, J.: Operational methods for the minimization of energy consumption of manufacturing equipment. Int. J. Prod. Res. 45(18–19), 4247–4271 (2007)
Mouzon, G., Yildirim, M.B.: A framework to minimise total energy consumption and total tardiness on a single machine. Int. J. Sustain. Eng. 1(2), 105–116 (2008)
Liu, G.S., Zhang, B.X., Yang, H.D., Chen, X., Huang, G.Q.: A branch-and-bound algorithm for minimizing the energy consumption in the PFS problem. Math. Probl. Eng. 1–6 (2013)
Nawaz, M., Enscore Jr., E.E., Ham, I.: A heuristic algorithm for the m-machine, n-job flowshop sequencing problem. OMEGA 11(1), 91–95 (1983)
Diaz, N., Redelsheimer, E., Dornfeld, D.: Energy consumption characterization and reduction strategies for milling machine tool use. In: Hesselbach, J., Herrmann, C. (eds.) Glocalized Solutions for Sustainability in Manufacturing, pp. 263–267. Springer, Heidelberg (2011). https://doi.org/10.1007/978-3-642-19692-8_46
Fang, K.T., Lin, B.M.T.: Parallel-machine scheduling to minimize tardiness penalty and power cost. Comput. Ind. Eng. 64(1), 224–234 (2013)
Allahverdi, A., Ng, C.T., Cheng, T.C.E., Kovalyov, M.Y.: A survey of scheduling problems with setup times or costs. Eur. J. Oper. Res. 187(3), 985–1032 (2008)
Afshin Mansouri, S., Aktas, E., Besikci, U.: Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption. Eur. J. Oper. Res. 248(3), 772–788 (2016)
Lenstra, J., Rinnooy Kan, A., Brucker, P.: Complexity of machine scheduling problems. Ann. Discret. Math. 1, 343–362 (1977)
Tanaka, S., Araki, M.: An exact algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times. Comput. Oper. Res. 40(1), 344–352 (2013)
Cicirello, V.A., Smith, S.F.: Enhancing stochastic search performance by value-biased randomization of heuristics. J. Heuristics 11(1), 5–34 (2005)
Ruiz, T., Stützle, T.: A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem. Eur. J. Oper. Res. 177(3), 2033–2049 (2007)
Osman, I., Potts, C.: Simulated annealing for permutation flow-shop scheduling. OMEGA 17(6), 551–557 (1989)
Dubois-Lacoste, J., Pagnozzi, F., Stützle, T.: An iterated greedy algorithm with optimization of partial solutions for the makespan permutation flowshop problem. Comput. Oper. Res. 81, 160–166 (2017)
Subramanian, A., Battarra, M., Potts, C.: An iterated local search heuristic for the single machine total weighted tardiness scheduling problem with sequence-dependent setup times. Int. J. Prod. Res. 52(9), 2729–2742 (2014)
Xu, H., Lu, Z., Cheng, T.: Iterated local search for single-machine scheduling with sequence-dependent setup times to minimize total weighted tardiness. J. Sched. 17(3), 271–287 (2014)
González, M.A., Palacios, J.J., Vela, C.R., Hernández-Arauzo, A.: Scatter search for minimizing weighted tardiness in a single machine scheduling with setups. J. Heuristics 23(2–3), 81–110 (2017)
Tasgetiren, M.F., Pan, Q.-K., Ozturkoglu, Y., Chen, A.H.L.: A memetic algorithm with a variable block insertion heuristic for single machine total weighted tardiness problem with sequence dependent setup times. IEEE Congr. Evol. Comput. CEC 2016, 2911–2918 (2016)
Lee, Y.H., Bhaskaran, K., Pinedo, M.: A heuristic to minimize the total weighted tardiness with sequence-dependent setups. IIE Trans. 29(1), 45–52 (1997)
Tan, K.C., Goh, C.K., Yang, Y., Lee, T.H.: Evolving better population distribution and exploration in evolutionary multi-objective optimization. Eur. J. Oper. Res. 171, 463–495 (2006)
Zitzler, E.: Evolutionary Algorithms for Multi Objective Optimization: Methods and Applications. Shaker, Ithaca (1999)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2018 Springer International Publishing AG, part of Springer Nature
About this paper
Cite this paper
Fatih Tasgetiren, M., Öztop, H., Eliiyi, U., Eliiyi, D.T., Pan, QK. (2018). Energy-Efficient Single Machine Total Weighted Tardiness Problem with Sequence-Dependent Setup Times. In: Huang, DS., Bevilacqua, V., Premaratne, P., Gupta, P. (eds) Intelligent Computing Theories and Application. ICIC 2018. Lecture Notes in Computer Science(), vol 10954. Springer, Cham. https://doi.org/10.1007/978-3-319-95930-6_76
Download citation
DOI: https://doi.org/10.1007/978-3-319-95930-6_76
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-95929-0
Online ISBN: 978-3-319-95930-6
eBook Packages: Computer ScienceComputer Science (R0)