Skip to main content

Energy-Efficient Single Machine Total Weighted Tardiness Problem with Sequence-Dependent Setup Times

  • Conference paper
  • First Online:
Intelligent Computing Theories and Application (ICIC 2018)

Part of the book series: Lecture Notes in Computer Science ((LNISA,volume 10954))

Included in the following conference series:

Abstract

Most of the problems defined in the scheduling literature do not yet take into account the energy consumption of manufacturing processes, as in most of the variants with tardiness objectives. This study handles scheduling of jobs with due dates and sequence-dependent setup times (SMWTSD), while minimizing total weighted tardiness and total energy consumed in machine operations. The trade-off between total energy consumption (TEC) and total weighted tardiness is examined in a single machine environment, where different jobs can be operated at varying speed levels. A bi-objective mixed integer linear programming model is formulated including this speed-scaling plan. Moreover, an efficient multi-objective block insertion heuristic (BIH) and a multi-objective iterated greedy (IG) algorithm are proposed for this NP-hard problem. The performances of the proposed BIH and IG algorithms are compared with each other. The preliminary computational results on a benchmark suite consisting of instances with 60 jobs reveal that, the proposed BIH algorithm is very promising in terms of providing good Pareto frontier approximations for the problem.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Fang, K., Uhan, N., Zhao, F., Sutherland, J.W.: A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction. J. Manuf. Syst. 30(4), 234–240 (2011)

    Article  Google Scholar 

  2. Mouzon, G., Yildirim, M.B., Twomey, J.: Operational methods for the minimization of energy consumption of manufacturing equipment. Int. J. Prod. Res. 45(18–19), 4247–4271 (2007)

    Article  Google Scholar 

  3. Mouzon, G., Yildirim, M.B.: A framework to minimise total energy consumption and total tardiness on a single machine. Int. J. Sustain. Eng. 1(2), 105–116 (2008)

    Article  Google Scholar 

  4. Liu, G.S., Zhang, B.X., Yang, H.D., Chen, X., Huang, G.Q.: A branch-and-bound algorithm for minimizing the energy consumption in the PFS problem. Math. Probl. Eng. 1–6 (2013)

    MathSciNet  MATH  Google Scholar 

  5. Nawaz, M., Enscore Jr., E.E., Ham, I.: A heuristic algorithm for the m-machine, n-job flowshop sequencing problem. OMEGA 11(1), 91–95 (1983)

    Article  Google Scholar 

  6. Diaz, N., Redelsheimer, E., Dornfeld, D.: Energy consumption characterization and reduction strategies for milling machine tool use. In: Hesselbach, J., Herrmann, C. (eds.) Glocalized Solutions for Sustainability in Manufacturing, pp. 263–267. Springer, Heidelberg (2011). https://doi.org/10.1007/978-3-642-19692-8_46

    Chapter  Google Scholar 

  7. Fang, K.T., Lin, B.M.T.: Parallel-machine scheduling to minimize tardiness penalty and power cost. Comput. Ind. Eng. 64(1), 224–234 (2013)

    Article  Google Scholar 

  8. Allahverdi, A., Ng, C.T., Cheng, T.C.E., Kovalyov, M.Y.: A survey of scheduling problems with setup times or costs. Eur. J. Oper. Res. 187(3), 985–1032 (2008)

    Article  MathSciNet  Google Scholar 

  9. Afshin Mansouri, S., Aktas, E., Besikci, U.: Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption. Eur. J. Oper. Res. 248(3), 772–788 (2016)

    Article  MathSciNet  Google Scholar 

  10. Lenstra, J., Rinnooy Kan, A., Brucker, P.: Complexity of machine scheduling problems. Ann. Discret. Math. 1, 343–362 (1977)

    Article  MathSciNet  Google Scholar 

  11. Tanaka, S., Araki, M.: An exact algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times. Comput. Oper. Res. 40(1), 344–352 (2013)

    Article  MathSciNet  Google Scholar 

  12. Cicirello, V.A., Smith, S.F.: Enhancing stochastic search performance by value-biased randomization of heuristics. J. Heuristics 11(1), 5–34 (2005)

    Article  Google Scholar 

  13. Ruiz, T., Stützle, T.: A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem. Eur. J. Oper. Res. 177(3), 2033–2049 (2007)

    Article  Google Scholar 

  14. Osman, I., Potts, C.: Simulated annealing for permutation flow-shop scheduling. OMEGA 17(6), 551–557 (1989)

    Article  Google Scholar 

  15. Dubois-Lacoste, J., Pagnozzi, F., Stützle, T.: An iterated greedy algorithm with optimization of partial solutions for the makespan permutation flowshop problem. Comput. Oper. Res. 81, 160–166 (2017)

    Article  MathSciNet  Google Scholar 

  16. Subramanian, A., Battarra, M., Potts, C.: An iterated local search heuristic for the single machine total weighted tardiness scheduling problem with sequence-dependent setup times. Int. J. Prod. Res. 52(9), 2729–2742 (2014)

    Article  Google Scholar 

  17. Xu, H., Lu, Z., Cheng, T.: Iterated local search for single-machine scheduling with sequence-dependent setup times to minimize total weighted tardiness. J. Sched. 17(3), 271–287 (2014)

    Article  MathSciNet  Google Scholar 

  18. González, M.A., Palacios, J.J., Vela, C.R., Hernández-Arauzo, A.: Scatter search for minimizing weighted tardiness in a single machine scheduling with setups. J. Heuristics 23(2–3), 81–110 (2017)

    Article  Google Scholar 

  19. Tasgetiren, M.F., Pan, Q.-K., Ozturkoglu, Y., Chen, A.H.L.: A memetic algorithm with a variable block insertion heuristic for single machine total weighted tardiness problem with sequence dependent setup times. IEEE Congr. Evol. Comput. CEC 2016, 2911–2918 (2016)

    Google Scholar 

  20. Lee, Y.H., Bhaskaran, K., Pinedo, M.: A heuristic to minimize the total weighted tardiness with sequence-dependent setups. IIE Trans. 29(1), 45–52 (1997)

    Article  Google Scholar 

  21. Tan, K.C., Goh, C.K., Yang, Y., Lee, T.H.: Evolving better population distribution and exploration in evolutionary multi-objective optimization. Eur. J. Oper. Res. 171, 463–495 (2006)

    Article  Google Scholar 

  22. Zitzler, E.: Evolutionary Algorithms for Multi Objective Optimization: Methods and Applications. Shaker, Ithaca (1999)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to M. Fatih Tasgetiren .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2018 Springer International Publishing AG, part of Springer Nature

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Fatih Tasgetiren, M., Öztop, H., Eliiyi, U., Eliiyi, D.T., Pan, QK. (2018). Energy-Efficient Single Machine Total Weighted Tardiness Problem with Sequence-Dependent Setup Times. In: Huang, DS., Bevilacqua, V., Premaratne, P., Gupta, P. (eds) Intelligent Computing Theories and Application. ICIC 2018. Lecture Notes in Computer Science(), vol 10954. Springer, Cham. https://doi.org/10.1007/978-3-319-95930-6_76

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-95930-6_76

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-95929-0

  • Online ISBN: 978-3-319-95930-6

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics