Abstract
Both “KAIZEN” and “KAIZEN” are used in the text. Please check whether any changes should be made for consistency.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Ashmore, C. (2001). KAIZEN–and the art of motorcycle manufacture. Manufacturing Engineer, 80(5), 220–222.
Bessant, J., & Caffyn, S. (1994). Rediscovering continuous improvement. Technovation, 14(1), 17–29.
Bhuiyan, N., & Baghel, A. (2005). An overview of continuous improvement: from the past to the present. Management Decision, 43(5), 761–771.
Bhuiyan, N., Baghel, A., & Wilson, J. (2006). A sustainable continuous improvement methodology at an aerospace company. International Journal of Productivity and Performance Management, 55(8), 671–687.
Brunet, A. P., & New, S. (2003). KAIZEN in Japan: an empirical study. International Journal of Operations and Production Management, 23(12), 1426–1446.
Brunet, P. (2000). KAIZEN in Japan. IEE Seminar, KAIZEN: from understanding to action (Ref. No. 2000/035). London, pp. 1–10.
Caffyn, S. (1999). Development of a continuous improvement self-assessment tool. International Journal of Operations and Production Management, 19(11), 38–53.
Chen, J. C., Dugger, J., & Hammer, B. (2000). A KAIZEN based approach for cellular manufacturing design: A case study. The Journal of Technology Studies, 27(2), 19–27.
Deshmukh, S. V., & Chavan, A. (2012). Six Sigma and SMEs: A critical review of literature. International Journal of Lean Six Sigma, 3(2), 157–167.
Deshmukh, S. V., & Lakhe, R. R. (2010). Six Sigma awareness in Central Indian SMEs. International Journal of Productivity and Quality Management, 5(2), 200–212.
Doolen, T. L., June, W. Q., Akan, V., Eileen, M., & Jennifer, F. (2003). Development of an assessment approach for KAIZEN Events. Proceedings of the 2003 Industrial Engineering and Research Conference, CD-ROM.
Gunasekaran, A., Korukonda, A. R., Virtanen, I., & Yli-Olli, P. (1994). Improving productivity and quality in manufacturing organizations. International Journal of Production Economics, 36(2), 169–183.
Hammer, M., Champy, J., & Tathan, R. L. (1993). Reengineering the corporation: A manifesto for business revolution. New York: Harper Collins.
Imai, M. (1997). Gemba KAIZEN: A commonsense, low cost approach to management. New York: McGraw Hill.
Jha, S., Noori, H., & Michela, J. (1996). The dynamics of continuous improvement. International Journal of Quality Science, 1(1), 19–47.
Jorgensen, F., Boer, H., & Gertsen, F. (2003). Jump-starting continuous improvement through self-assessment. International Journal of Operations and Production Management, 23(10), 1260–1278.
Karkoszka, T., & Szewieczek, D. (2007). Risk of the processes in the aspect of quality, natural environment and occupational safety. Journal of Achievements in Materials and Manufacturing Engineering, 20(3), 539–542.
Kaye, M., & Anderson, R. (1999). Continuous improvement: The ten essential criteria. International Journal of Quality and Reliability Management, 16(5), 485–506.
Kossoff, L. L. (1993). Total quality or total chaos? HR Magazine, 38(4), 131–134.
Malik, S. A., & YeZhuang, T. (2006). Execution of continuous improvement practices in Spanish and Pakistani industry: A comparative analysis. IEEE International Conference on Management of Innovation and Technology, Singapore, 2, pp. 761–765.
Marin-Garcia, J. A., Val, M. P., & Martin, T. B. (2008). Longitudinal study of the results of continuous improvement in an industrial company. Team Performance Management, 14(1/2), 56–69.
Newitt, D. J. H. (1996). Beyond BPR and TQM- managing the processes: Is KAIZEN enough? In Proceedings Industrial Engineering, London, Institution of Electric Engineers, pp. 1–5.
Radharamanan, R., Godoy, L. P., & Watanabe, K. I. (1996). Quality and productivity improvement in a custom-made furniture industry using KAIZEN. Computer and Industrial Engineering, 31(1/2), 471–474.
Reid, R. A. (2006). Productivity and quality improvement: An implementation framework. International Journal of Productivity and Quality Management, 1(1/2), 26–36.
Setijono, D. (2010). Model and principles of stakeholders-oriented quality management based on radical (discontinuous) improvement—a modern re-interpretation of TQM and CWQC? International Journal of Quality and Innovation, 1(1), 167–183.
Shingo, S. (1985). A Revolution in manufacturing: The SMED System. Andrew Oillon: Productivity Press.
Singh, B., & Khanduja, D. (2010). SMED for quick changeover in foundry SMEs. International Journal of Productivity and Performance Management, 59(1), 98–116.
Wittenberg, G. (1994). KAIZEN-The many ways of getting better. Assembly Automation, 14(4), 12–17.
Yan-jiang, C., Dan, W., & Lang, X. (2006). Influencing factors of continuous improvement and tendency to change. IEEE International conference on management of innovation and technology, vol. 1, Singapore, PP. 181–185.
Yeo, C. H., Goh, T. N., & Xia, M. (1995). A positive management orientation for continuous improvement. IEEE Conference on Engineering Management, pp. 208–213.
Author information
Authors and Affiliations
Rights and permissions
Copyright information
© 2019 The Author(s), under exclusive licence to Springer International Publishing AG, part of Springer Nature
About this chapter
Cite this chapter
Singh, J., Singh, H. (2019). Introduction. In: Strategic Implementation of Continuous Improvement Approach. SpringerBriefs in Operations Management. Springer, Cham. https://doi.org/10.1007/978-3-319-93121-0_1
Download citation
DOI: https://doi.org/10.1007/978-3-319-93121-0_1
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-93120-3
Online ISBN: 978-3-319-93121-0
eBook Packages: Business and ManagementBusiness and Management (R0)