Ramping study at the PLS-II storage ring
Article
First Online:
Received:
Accepted:
- 47 Downloads
- 1 Citations
Abstract
PLS-II (the upgrade of the Pohang Light Source) has been operated successfully since 21 March 2012. Since a 3-GeV linear accelerator is used as a full-energy injector, the performance of the linear accelerator is critical for reliable user service. Although the PLS-II linear accelerator has shown full reliability without interrupting user service during the first half year, there is always the possibility for failure of the 3-GeV linear accelerator system. For instance, any of the many pulsed high-power supplies may fail. Therefore, the storage ring should be prepared for injection at energies lower than 3-GeV. For that, we performed ramping studies, and we describe the results in this paper.
Keywords
Ramping Injection 3-GeV Linear AcceleratorPreview
Unable to display preview. Download preview PDF.
References
- [1]S. Nam, in Proceedings of the 23rd Particle Accelerator Conference (Vancouver, Canada, May 4–8, 2009).Google Scholar
- [2]J. h. Hong, J. Korean Phys. Soc. 59, 594 (2011).CrossRefGoogle Scholar
- [3]S. An, J. Korean Phys. Soc. 59, 553 (2011).CrossRefGoogle Scholar
- [4]C. Kim, J. Korean Phys. Soc. 59, 34 (2011).CrossRefGoogle Scholar
- [5]B.-J. Lee, in Proceedings of International Particle Accelerator Conference (New Orleans, USA, May 20–26, 2012).Google Scholar
- [6]H. S. Lee, Proceedings of International Particle Accelerator Conference, (New Orleans, USA, May 20–26, 2012).Google Scholar
Copyright information
© The Korean Physical Society 2013