Abstract
A formula is suggested for calculating the complex indeterminacy of the group of analyzed production operations before and after their improvement, as well as process flowsheets as a whole in information units. A calculation on the basis of this formula will allow one to establish the predictability and production reliability of these operations.
Similar content being viewed by others
References
Shannon, K.E., in Raboty po teorii informatsii i kibernetike (Research in the Theory of the Information and Cybernetics), Moscow: Inostrannaya Literatura, 1963, p. 243.
Medikhanov, D.G. and Ospanov, E.A., Sbornik nauchykh rabot po problemam BGMK, posvyashchennyi 10-letiyu nezavisimosit RK (Collected Articles by the Problems of BGMK Devoted to the 10th Anniversary of Independence of Republic Kazakhstan), Balkhash: BGTI, 2001, p. 114.
Ospanov, E.A., Malyshev, V.P., Nurmagambetova, A.M., and Kazhikenova, S.Sh., Prom-st. Kazakhstana, 2008, no. 3, p. 52.
Author information
Authors and Affiliations
Corresponding author
Additional information
Original Russian Text © V.P. Malyshev, S.Sh. Kazhikenova, A.M. Turdukozhaeva, 2009, published in Izvestiya VUZ. Tsvetnaya Metallurgiya, 2009, No. 4, pp. 22–24.
About this article
Cite this article
Malyshev, V.P., Kazhikenova, S.S. & Turdukozhaeva, A.M. A qualitative and quantitative evaluation of the technological processes in the metallurgy of non-ferrous metals. Russ. J. Non-ferrous Metals 50, 335–337 (2009). https://doi.org/10.3103/S106782120904004X
Published:
Issue Date:
DOI: https://doi.org/10.3103/S106782120904004X