Modular construction mechanics of a European pressurized reactor steel containment liner

  • Jia-chuan Yan
  • Xiao-fei Jin
  • Feng Qin
  • Zheng Li
  • Feng Fan
  • Jin-ping Ou
Article
  • 43 Downloads

Abstract

A European pressurized reactor (EPR) steel containment liner structure is comprised of the cylinder part and the dome part. An introduction of the steel liner structure is presented, followed by studies on the key mechanical features of the construction process using a refined finite element method. The steel liner was divided into several modules and then assembled during construction. Firstly, the equipment structure used to hoist the liner module was optimized, the lifting lug was analyzed using a multi-scale finite element model; the wind speed limit during lifting was also studied. Subsequently, the effect of internal forces during assembly between the liner modules, the lateral pressure of fresh concrete, the non-uniform temperature load, and the wind load on the cylinder module was analyzed. According to the time-varying structural performance during continuous concrete pouring and the hardening construction, an “overlapping element and birth-death element” technique was adopted to analyze the deformation and stress of the long-span steel dome liner. In addition, the stability-bearing capacities of the dome structure during construction were also studied, which took into consideration the effect of the initial geometrical imperfections and the elasto-plasticity of the material. This study presents a reference in terms of the mechanics of the construction scheme and the safety of such a type of structure.

Key words

Containment Construction mechanics Steel liner Overlapping element Birth-death element 

欧洲压水堆核电站安全壳钢衬里模块化施工力学研究

摘要

目 的

以广东台山欧洲压水堆(EPR)核电站安全壳钢衬里结构为研究背景,提炼钢衬里结构模块化施工全过程中的关键力学问题,对钢衬里结构模块化施工技术从力学角度给出建议,对确定结构施工方案和保证结构施工安全具有实用参考价值。

创新点

1. 提炼出EPR 核电站安全壳钢衬里结构模块化施工全过程中的关键力学问题;2. 采用“重叠单元和生死单元”技术模拟大型复杂结构混凝土浇筑成型全过程。

方法

1. 通过精细化有限元分析,开展吊装工装结构优化分析、吊耳节点多尺度有限元分析和工作风速分析;2. 建立安全壳结构复杂实体有限元模型,分析模块之间对接拼装初内力、新浇筑混凝土侧压力、不均匀温度作用及风荷载等施工因素对筒体钢衬里的影响;3. 采用“重叠单元和生死单元”技术,分析大跨度穹顶钢衬里结构在混凝土浇筑成型全过程中的结构变形和应力;4. 考虑结构初始几何缺陷和材料弹塑性的影响,对混凝土浇筑成型过程中穹顶钢衬里结构进行稳定性分析。

结论

1. 采用三角形环形桁架吊装工装,能够满足吊装过程的应力和变形要求,并减少吊装工装用钢量;2. 获得了筒体钢衬里模块高度和混凝土一次浇筑最大高度的相关曲线;3. 得到了混凝土浇筑成型全过程中穹顶钢衬里结构的力学性能;4. 定义并验算了混凝土浇筑成型过程中穹顶钢衬里结构两个关键阶段的稳定性,为此类结构施工提供了理论参考。

关键词

安全壳 施工力学 钢衬里 重叠单元 生死单元 

CLC number

TU393.3 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. ABAQUS Inc., 2012. Abaqus Theory Manual, Release 6.12. ABAQUS Inc.Google Scholar
  2. Anderson, P., 2005. Thirty years of measured prestress at Swedish nuclear reactor containments. Nuclear Engineering and Design, 235(21):2323–2336.CrossRefGoogle Scholar
  3. ANSYS Inc., 2012. Ansys Theory Manual, Release 14.5. ANSYS Inc.Google Scholar
  4. ASME (American Society of Mechanical Engineers), 2015. BPVC Section III-Rules for Construction of Nuclear Facility Components-Division 2-Code for Concrete Containments, BPVC-III-2. ASME.Google Scholar
  5. ASN (French Nuclear Safety Authority), 2015. EPR Information Letter No. 17:ASN Monitoring of the Flamanville EPR Reactor Construction Site: Notable Points. ASN. http://www.french-nuclear-safety.fr/Inspections/Supervi sion-of-the-epr-reactor/ASN-s-supervision-of-the-Flaman ville-3-reactor-construction-EPR-News/EPR-Informatio n-Letter-No.17#bottomGoogle Scholar
  6. Basha, S.M., Singh, R.K., Patnaik, R., et al., 2003. Predictions of ultimate load capacity for pre-stressed concrete containment vessel model with BARC finite element code ULCA. Annals of Nuclear Energy, 30(4):437–471. http://dx.doi.org/10.1016/S0306-4549(02)00075-0CrossRefGoogle Scholar
  7. Becue, P., Barre, F., Arbez, P., 2005. Design of the EPR containment. International Association for Bridge and Structural Engineering, 90(9):85–92.Google Scholar
  8. CEN (European Committee for Standardization), 2003. Flat Products Made of Steels for Pressure Purposes. Part 2: Non-alloy and Alloy Steels with Specified Elevated Temperature Properties, BS EN 10028-2:2003. CEN.Google Scholar
  9. CEN (European Committee for Standardization), 2004. European Standard. 2: Design of Concrete Structures. Part 1-1: General Rules and Rules for Buildings, BS EN 1992-1-1:2004. CEN.Google Scholar
  10. CEN (European Committee for Standardization), 2005. European Standard. 3: Design of Steel Structures. Part 1-1: General Rules and Rules for Buildings, BS EN 1993-1-1:2005. CEN.Google Scholar
  11. CEN (European Committee for Standardization), 2007. European Standard. 3: Design of Steel Structures. Part 1-6: Strength and Stability of Shell Structures, BS EN 1993-1-6:2007. CEN.Google Scholar
  12. de Clercq, G., 2014. EDF Hopes French EPR will Launch before Chinese Reactors. Reuters. http://af.reuters.com/article/commoditiesNews/idAFL6N 0Q665C20140731?sp=trueGoogle Scholar
  13. Enformable Nuclear News, 2011. Photos of the China’s Lifting of Dome at Taishan Nuclear Power Plant. Enformable Nuclear News. http://enformable.com/2011/10/photos-of-the-chinas-lifti ng-of-dome-at-taishan-nuclear-power-plant/Google Scholar
  14. Fib Task Group on Containment Structures, 2001. Nuclear Containments. International Federation for Structural Concrete.Google Scholar
  15. Gioncu, V., 1995. Buckling of reticulated shells state-of-theart. International Journal of Space Structures, 10(1):1–46.CrossRefGoogle Scholar
  16. Hessheimer, M.F., Klamerus, E.W., Lambert, L.D., et al., 2003. Overpressurization Test of a 1:4-scale Pre-stressed Concrete Containment Vessel Model. Technical Report No. NU-REG/CR-6810, SAND2003-0840P, Nuclear Regulatory Commission, Washington DC, USA; Sandia National Laboratories, Albuquerque, USA; Nuclear Power Engineering Corporation, Japan.Google Scholar
  17. Horschel, D.S., 1988. Design, Construction, and Instrumentation of a 1:6 Scale Reinforced Concrete Containment Building. Technical Report No. NUREG/CR-5083, SAND88-0030, Nuclear Regulatory Commission, Washington DC, USA; Sandia National Laboratories, Albuquerque, USA.Google Scholar
  18. Horschel, D.S., 1992. Experimental Results from Pressure Testing of a 1:6 Scale Nuclear Power Plant Containment. Technical Report No. NU-REG/CR-5121, SAND88-0906, Nuclear Regulatory Commission, Washington DC, USA; Sandia National Laboratories, Albuquerque, USA.Google Scholar
  19. Hu, H.T., Lin, J.X., 2016. Ultimate analysis of PWR prestressed concrete containment under long-term prestressing loss. Annals of Nuclear Energy, 87: 500–510.CrossRefGoogle Scholar
  20. IAEA (International Atomic Energy Agency), 2012a. Nuclear Power Reactor Details: Taishan-1. Power Reactor Information System. https://www.iaea.org/PRIS/CountryStatistics/ReactorDet ails.aspx?current=918Google Scholar
  21. IAEA (International Atomic Energy Agency), 2012b. Nuclear Power Reactor Details: Taishan-2. Power Reactor Information System. https://www.iaea.org/PRIS/CountryStatistics/ReactorDet ails.aspx?current=919Google Scholar
  22. Kim, S.H., Choi, M.S., Joung, J.Y., et al., 2013. Long-term reliability evaluation of nuclear containments with tendon force degradation. Nuclear Engineering and Design, 265: 582–590. http://dx.doi.org/10.1016/j.nucengdes.2013.06.025CrossRefGoogle Scholar
  23. Kwak, H.G., Kwon, Y., 2016. Nonlinear analysis of containment structure based on modified tendon model. Annals of Nuclear Energy, 92: 113–126. http://dx.doi.org/10.1016/j.anucene.2016.01.040CrossRefGoogle Scholar
  24. Lapp, C.W., Golay, M.W., 1997. Modular design and construction techniques for nuclear power plants. Nuclear Engineering and Design, 172(3):327–349. http://dx.doi.org/10.1016/S0029-5493(97)00031-9CrossRefGoogle Scholar
  25. Lee, H.P., Choun, Y.S., Seo, J.M., 2004. Nonlinear finite element analysis of containment vessel by considering the tension stiffening effect. Journal of the Korean Nuclear Society, 36(6):512–527.Google Scholar
  26. Lundqvist, P., Nilsson, L.O., 2011. Evaluation of prestress losses in nuclear reactor containments. Nuclear Engineering and Design, 241(1):168–176. http://dx.doi.org/10.1016/j.nucengdes.2010.11.007CrossRefGoogle Scholar
  27. Marques, J.G., 2010. Evolution of nuclear fission reactors: third generation and beyond. Energy Conversion and Management, 51(9):1774–1780. http://dx.doi.org/10.1016/j.enconman.2009.12.043CrossRefGoogle Scholar
  28. MOHURD (Ministry of Housing and Urban-Rural Development), 2003. Code for Design of Steel Structures, GB50017-2003. National Standards of People’s Republic of China (in Chinese).Google Scholar
  29. MOHURD (Ministry of Housing and Urban-Rural Development), 2008. Technical Code for Safety of Forms in Construction, JGJ 162-2008. Construction Industry Standards of People’s Republic of China (in Chinese).Google Scholar
  30. MOHURD (Ministry of Housing and Urban-Rural Development), 2009. Code for Construction of Mass Concrete, GB50496-2009. National Standards of People’s Republic of China (in Chinese).Google Scholar
  31. MOHURD (Ministry of Housing and Urban-Rural Development), 2010. Technical Specification for Space Frame Structures, JGJ 7-2010. Construction Industry Standards of People’s Republic of China (in Chinese).Google Scholar
  32. MOHURD (Ministry of Housing and Urban-Rural Development), 2012a. Load Code for the Design of Building Structures, GB 50009-2012. National Standards of People’s Republic of China (in Chinese).Google Scholar
  33. MOHURD (Ministry of Housing and Urban-Rural Development), 2012b. Specification for Design of Reinforced Concrete Shell Structures, JGJ 22-2012. Construction Industry Standards of People’s Republic of China (in Chinese).Google Scholar
  34. Nuclear Engineering International, 2009. Olkiluoto 3 Reactor Building Gets Roof. Global Trade Media, Progressive Media Group Limited.Google Scholar
  35. Parmar, R.M., Singh, T., Thangamani, I., et al., 2014. Overpressure test on barcom pre-stressed concrete containment. Nuclear Engineering and Design, 269: 177–183. http://dx.doi.org/10.1016/j.nucengdes.2013.08.027CrossRefGoogle Scholar
  36. People’s Daily, 2009. Taishan Nuclear Power Plant to Be One of World’s Largest. People’s Daily Online. http://en.people.cn/90001/90776/90883/6849430.htmlGoogle Scholar
  37. Rizkalla, S.H., Macgregor, J.G., Simmonds, S.H., 1984. Prestressed concrete containment model. Journal of Structural Engineering, 110(4):730–743. http://dx.doi.org/10.1061/(asce)0733-9445(1984)110:4(730)CrossRefGoogle Scholar
  38. Shen, S.Z., Chen, X., 1999. Stability of Reticulated Shells. Science Press, Beijing, China (in Chinese).Google Scholar
  39. Shokoohfar, A., Rahai, A., 2016. Nonlinear analysis of prestressed concrete containment vessel (PCCV) using the damage plasticity model. Nuclear Engineering and Design, 298: 41–50. http://dx.doi.org/10.1016/j.nucengdes.2015.12.019CrossRefGoogle Scholar
  40. Timoshenko, S., Woinowsky-Krieger, S., 1959. Theory of Plates and Shells. McGraw-Hill Book Company, USA.zbMATHGoogle Scholar
  41. Twidale, D., Crowder, R., 1991. Sizewell ‘B’-A one tenth scale containment model test for the UK PWR programme. Nuclear Engineering and Design, 125(1): 85–93. http://dx.doi.org/10.1016/0029-5493(91)90008-6CrossRefGoogle Scholar
  42. von Riesemann, W.A., Parks, M.B., 1995. Current state of knowledge on the behavior of steel liners in concrete containments subjected to overpressurization loads. Nuclear Engineering and Design, 157(3):481–487. http://dx.doi.org/10.1016/0029-5493(95)01003-ZCrossRefGoogle Scholar
  43. Wang, G.Y., 2000. On mechanics of time-varying structures. China Civil Engineering Journal, 33(6):105–108(in Chinese).Google Scholar
  44. WNA (World Nuclear Association), 2010. Nuclear Power in China. WNA.Google Scholar
  45. WNN (World Nuclear News), 2013a. Symbolic Milestone for Finnish EPR. WNN. http://www.world-nuclear-news.org/NN-Symbolic_mile stone_ for_Finnish_EPR-2410134.htmlGoogle Scholar
  46. WNN (World Nuclear News), 2013b. Taishan Generator Stator Lift. WNN. http://www.world-nuclear-news.org/NN_Taishan_gener ator_lift_1110131.htmlGoogle Scholar
  47. Yonezawa, K., Imoto, K., Watanabe, Y., et al., 2002. Ultimate capacity analysis of 1/4 PCCV model subjected to internal pressure. Nuclear Engineering and Design, 212(1–3):357–379. http://dx.doi.org/10.1016/S0029-5493(01)00498-8CrossRefGoogle Scholar
  48. Zhang, X., 2009. 900 MW PWR containment mechanical behavior characteristics during containment test. Nuclear Engineering and Design, 239(9):1647–1652. http://dx.doi.org/10.1016/j.nucengdes.2009.04.003CrossRefGoogle Scholar

Copyright information

© Zhejiang University and Springer-Verlag GmbH Germany 2017

Authors and Affiliations

  • Jia-chuan Yan
    • 1
    • 2
  • Xiao-fei Jin
    • 3
  • Feng Qin
    • 4
  • Zheng Li
    • 5
  • Feng Fan
    • 1
    • 2
  • Jin-ping Ou
    • 1
    • 2
  1. 1.Key Lab of Structures Dynamic Behavior and Control of the Ministry of EducationHarbin Institute of TechnologyHarbinChina
  2. 2.School of Civil EngineeringHarbin Institute of TechnologyHarbinChina
  3. 3.China Construction First Engineering Division Corporation LimitedBeijingChina
  4. 4.Country GardenFoshanChina
  5. 5.China Construction Second Engineering Bureau Nuclear Power Plants BranchShenzhenChina

Personalised recommendations