Abstract
Construction cost control is a complex system engineering. The traditional controlling method cannot dynamically control in advance the construction cost because of its hysteresis. This paper proposes a computer simulation based construction cost integrated control method, which combines the cost with PERT systematically, so that the construction cost can be predicted and optimized systematically and effectively. The new method overcomes the hysteresis of the traditional systems, and is a distinct improvement over them in effect and practicality.
References
Mitrani I., 1982. Simulation Techniques for Discrete Event Systems. Cambridge University, Pergamon Press, p. 40–42.
Wang Shouqing, 1996. Computer’s Application in Cost Estimation in ConstructionEngineering, Isinghua Press, Beijing, p. 15–17.
Xie Xinghao, Han Gengzai, 1988. Computer Simulation and Analysis of the Reliability of the Average Value of the Total Project Duration by PERT.Journal of Xi’ an Construction and Technology University,7(1): 29–36.
Zhao Wei, Xie, Xinghao, 1988. Simulation and Application of Computer. Construction Industry Press of China, Beijing, p. 30–35.
Zhu, Yan, 1998. Cost Management in Construction Engineering. Construction Industry Press of China, Beijing p. 10–12.
Author information
Authors and Affiliations
Corresponding author
Additional information
Project (43220205*29817) supported by Cao Guang-Biao High-Tech. Development Foundation of Zhejiang University
Rights and permissions
About this article
Cite this article
Lian-fa, R., Ying, X. & You-sheng, W. Construction cost integrated control based on computer simulation. J. Zheijang Univ.-Sci. 2, 28–33 (2001). https://doi.org/10.1631/BF02841172
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1631/BF02841172