Literatur
Flyvbjerg B, Budzier A (2011) Double whammy – how ICT projects are fooled by randomness and screwed by political intent.
Boehm B, Abts C, Chulani S (2000) Software development cost estimation approaches – A survey. Annals of Software Engineering 10(1), S. 177–205.
Kahneman D, Slovic P, Tversky A (1982) Judgment Under Uncertainty: Heuristics and Biases. Cambridge University Press.
Ott HJ (1993) Wirtschaftlichkeitsanalyse von EDV-Investitionen mit dem WARS-Modell am Beispiel der Einführung von CASE. Wirtschaftsinformatik 35(6), S. 522–531.
Schumann M (1993) Wirtschaftlichkeitsbeurteilung für IV-Systeme. Wirtschaftsinformatik 35(2), S. 167–178.
Andresen J, Björk B, Betts M (2000) A framework for measuring IT innovation benefits.
Van Grembergen W, De Haes S (2005) Measuring and improving IT governance through the balanced scorecard. Information Systems Control Journal 2(1), S. 35–42.
Walter SG, Spitta T (2004) Approaches to the Ex-ante Evaluation of Investments into Information Systems. Wirtschaftsinformatik 46(3), S. 171–180.
Ward J, Daniel E (2006) Benefits management: Delivering value from IS & IT investments. John Wiley & Sons.
Zangemeister C (1971) Nutzwertanalyse in der Systemtechnik. Wittemannsche Buchhandlung, München.
Rights and permissions
About this article
Cite this article
Blumberg, S., Chen, X., Heidemann, J. et al. IT-Projektsteuerung – eine Methodik zum Benefits-Management mit integrierter Risikobetrachtung. Wirtsch Inform Manag 4, 56–61 (2012). https://doi.org/10.1365/s35764-012-0181-3
Published:
Issue Date:
DOI: https://doi.org/10.1365/s35764-012-0181-3