Construction Management Information System at JINR

  • PHYSICS OF ELEMENTARY PARTICLES AND ATOMIC NUCLEI. EXPERIMENT
  • Published:
Physics of Particles and Nuclei Letters Aims and scope Submit manuscript

Abstract

The deployment and adaptation of an all-around Construction Management Information System (CMIS) was recently completed at the Joint Institute for Nuclear Research (JINR) from the collaborative work of the Laboratory of High Energy Physics (LHEP) and the Laboratory of Information Technologies (LIT). The system is particularly useful for the fine-grained control and continuous feedback of the production of complex multipart objects like the detector subsystems composing the experiments of the Nuclotron-based Ion Collider fAcility (NICA) at JINR’s LHEP. Currently, the CMIS is used for the production of two different silicon tracker detectors at the LHEP, although it might as well be used by any other hardware production projects related to JINR whose complexity would make it very hard to fulfill their quality and timing requirements otherwise.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1.
Fig. 2.
Fig. 3.
Fig. 4.
Fig. 5.
Fig. 6.

Similar content being viewed by others

REFERENCES

  1. MPD Collab., Eur. Phys. J. A 58, 140 (2022).

    Article  ADS  Google Scholar 

  2. BM@N Collab., Nucl. Phys. A 982, 967-970 (2019).

  3. Yu. A. Murin and C. Ceballos. Phys. Part. Nucl. 52, 742 (2021).

    Article  Google Scholar 

  4. A. Sheremetiev, D. Dementev, V. Elsha, A. Kolozhvari, and Yu. Murin, Phys. Part. Nucl. 53, 377 (2022).

    Article  Google Scholar 

  5. G. Adde and B. Chan, D. Duellmann, X. Espinal, A. Fiorot, J.Iven, L. Janyst, M. Lamanna, L. Mascetti, J. M. Pereira Rocha, A. J. Peters, and E. A. Sindrilaru, J. Phys.: Conf. Ser. 608, 012009, (2015).

    Google Scholar 

  6. N. Sukhov et al., “Development of bonding quality control for assembly of the silicon microstrip sensor modules,” CBM Progress Report (Darmstadt, 2018).

  7. Software Guide. ZEN 2 (blue edition). http://www.zeiss.com/microscopy.

  8. https://github.com/zeiss-microscopy/libCZI.

Download references

ACKNOWLEDGMENTS

We would like to thank Dr. Luciano Musa and the CERN’s ALICE-ITS team for their decisive support for transferring the CMIS technological solution to JINR. As well, we would like to acknowledge the directorship of LHEP and LIT at JINR for their support of the deployment and adaptation of the system to the IT platform of JINR.

Author information

Authors and Affiliations

Authors

Corresponding authors

Correspondence to C. Ceballos, A. A. Kolozhvari, A. G. Dolbilov, R. N. Semenov, E. A. Tsapulina, A. Rodriguez, A. D. Sheremetiev or Yu. A. Murin.

Ethics declarations

The authors declare that they have no conflicts of interest.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Ceballos, C., Kolozhvari, A.A., Dolbilov, A.G. et al. Construction Management Information System at JINR. Phys. Part. Nuclei Lett. 20, 981–987 (2023). https://doi.org/10.1134/S1547477123050187

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1134/S1547477123050187

Navigation