Abstarct
The offer on working out of the pulse modulator with 180 MW pulse power and 180 kW average power for pulse S-band klystrons of LUE-200 linac of IREN installation at the Laboratory of neutron physics (FLNP) at JINR is formulated. Main requirements, key parameters and element base of the modulator are presented. The variant of the basic scheme on the basis of 14 (or 11) stage 2 parallel PFN with the thyratron switchboard (TGI2-10K/50) and six parallel high voltage power supplies (CCPS Power Supply) is considered.
Similar content being viewed by others
References
A. V. Belozerov, Ju. Boettcher, Yu. K. Bulycheva, V. N. Zamrij, A. S. Kayukov, V. V. Kobets, I. N. Meshkov, V. F. Minashkin, V. A. Petrov, V. G. Pyataev, P. V. Sedyshev, A. V. Skrypnik, A. P. Sumbaev, A. V. Ufimtsev, V. G. Shabratov, V. A. Shvets, V. N. Shvetsov, A. A. Fateev, O. V. Belikov, A. A. Galt, P. V. Logatchev, A. S. Medvedko, and V. M. Pavlov, “Physical startup of the first stage of the IREN facility,” Phys. Elem. Part. Nucl. Lett. 7(7)[(163)], 923–932 (2010).
Ju. Boettcher, E. A. Golubkov, V. A. Egorov, Yu. K. Zaytseva, V. N. Zamrij, A. S. Kayukov, V. V. Kobets, A. Zh. Korokin, V. F. Minashkin, V. G. Pyataev, A. N. Repkin, A. V. Skrypnik, A. P. Sumbaev, K. V. Udovichenko, V. G. Shabratov, V. A. Schvets, V. N. Shvetsov, and V. M. Pavlov, “LUE-200 accelerator of IREN facility: Current status and development,” Phys. Elem. Part. Nucl. Lett. 11(5), (2014). To be published.
Author information
Authors and Affiliations
Corresponding author
Additional information
The article is published in the original.
Rights and permissions
About this article
Cite this article
Su, K.D., Sumbaev, A.P. & Shvetsov, V.N. 180 MW/180 KW pulse modulator for S-band klystron of LUE-200 linac of IREN installation of JINR. Phys. Part. Nuclei Lett. 11, 672–674 (2014). https://doi.org/10.1134/S1547477114050173
Published:
Issue Date:
DOI: https://doi.org/10.1134/S1547477114050173