Skip to main content
Log in

Design, Manufacture, and Experimental Serviceability Validation of ITER Blanket Components

  • Published:
Physics of Atomic Nuclei Aims and scope Submit manuscript

Abstract

In 2014, the Russian Federation and the ITER International Organization signed two Procurement Arrangements (PAs) for ITER blanket components: 1.6.P1ARF.01 “Blanket First Wall” of February 14, 2014, and 1.6.P3.RF.01 “Blanket Module Connections” of December 19, 2014. The first PA stipulates development, manufacture, testing, and delivery to the ITER site of 179 Enhanced Heat Flux (EHF) First Wall (FW) Panels intended for withstanding the heat flux from the plasma up to 4.7MW/m2. Two Russian institutions, NIIEFA (Efremov Institute) and NIKIET, are responsible for the implementation of this PA. NIIEFA manufactures plasma-facing components (PFCs) of the EHF FW panels and performs the final assembly and testing of the panels, and NIKIET manufactures FW beam structures, load-bearing structures of PFCs, and all elements of the panel attachment system. As for the second PA, NIKIET is the sole official supplier of flexible blanket supports, electrical insulation key pads (EIKPs), and blanket module/vacuum vessel electrical connectors. Joint activities of NIKIET and NIIEFA for implementing PA 1.6.P1ARF.01 are briefly described, and information on implementation of PA 1.6.P3.RF.01 is given. Results of the engineering design and research efforts in the scope of the above PAs in 2015–2016 are reported, and results of developing the technology for manufacturing ITER blanket components are presented.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. IO ITER, Technical Specification, Annex B to Procurement Arrangement 1.6.P3.RF.01, ITER_UID_PUKQPB (2014), vol. 1.1.

  2. IO ITER, Technical Specification, Annex B to Procurement Arrangement 1.6.P1A.RF.01, ITER_D_GHVBGL (2014), vol. 1.1.

  3. IO ITER, ITER Vacuum Handbook (ITER D 2EZ9UM, 2009).

  4. IO ITER, List of EHF FW Variants for RF PA, GLDCSS, vol. 2.2.

  5. IO ITER, Material Specification G2VF8B, vol. 1.2.

  6. IO ITER, Technical Specification D25QF6, vol. 1.4.

  7. V. Barabash, J. Nucl. Mater. 367–370, 21 (2007).

    Article  Google Scholar 

  8. V. Rozov, V. Belyakov, V. Kukhtin, E. Lamzin, I. Mazul, and S. Sytchevsky, Fusion Eng. Des. 89, 2691 (2014).

    Article  Google Scholar 

  9. IO ITER, ITER Vacuum Vessel Load Specification, ITER D 2F52JY (2014), vol. 3.3.

  10. IO ITER, Technical Specification GKEM64, vol. 2.1.

  11. ITER IO, Blanket System Load Specification. ITER_D_3NSGK2 vol. 2.1.

  12. K. Ioki et al., Fusion Eng. Des. 61–62, 399 (2002).

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to A. Yu. Leshukov.

Additional information

Original Russian Text © A.Yu. Leshukov, Yu.S. Strebkov, M.N. Sviridenko, V.M. Safronov, A.B. Putrik, 2016, published in Voprosy Atomnoi Nauki i Tekhniki, Seriya: Termoyadernyi Sintez, 2016, Vol. 39, No. 4, pp. 13–26.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Leshukov, A.Y., Strebkov, Y.S., Sviridenko, M.N. et al. Design, Manufacture, and Experimental Serviceability Validation of ITER Blanket Components. Phys. Atom. Nuclei 80, 1249–1260 (2017). https://doi.org/10.1134/S1063778817070092

Download citation

  • Received:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1134/S1063778817070092

Keywords

Navigation