Skip to main content
Log in

Automated Planning of Underground Mining Operations with Regard to Geological and Geotechnical Constraints

  • MINING ECOLOGY AND SUBSOIL MANAGEMENT
  • Published:
Journal of Mining Science Aims and scope

Abstract

The authors present a multi-factor algorithm for making provisions for geological/geotechnical constraints and operation timing criteria subject to availability of resources. The algorithm enables embracing a variety of possible combinations of heading or stoping conditions at each specific underground mine facility. The algorithm is a part of the digital tool of automated underground mine production planning in geological and mining information system MINEFRAME.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1

REFERENCES

  1. Badge, M.N., Ore and Backfill Dilution in Underground Hard Rock Mining, Journal of Mining Science, 2021, vol. 57, no. 6, pp. 995–1005.

    Article  Google Scholar 

  2. Lukichev, S.V. (Ed.), Nauchnye i prakticheskie aspekty primeneniya tsifrovykh tekhnologii v gornoi promyshlennosti: monografiya (Scientific and Practical Aspects of Using Digital Technologies in the Mining Industry: Monograph), Apatity: FITs KNTs RAN, 2019.

    Google Scholar 

  3. Chaplygin, N.N., Bliznyuk, G.I., Churkin, O.E., Myznikov, A.V., and Malinovskaya, M.P., Godovoe planirovanie podzemnykh gornykh rabot na EVM. Sb. nauch. tr.: Analiz sistem i upravlenie imi v gornom proizvodstve (Annual Planning of Underground Mining Operations on a Computer. Collection of Scientific Papers: Analysis and Management of Systems in Mining), Apatity: GoI KF AN SSSR, 1988.

    Google Scholar 

  4. Churkin, O.E. and Malinovskaya, M.P., Informatsionnoe obespechenie imitatsionnoi modeli tekhnologii podzemnoi dobychi rudy. Sb. nauch. tr.: Analiz sistem i upravlenie imi v gornom proizvodstve (Information Support of the Simulation Model of Underground Ore Mining Technology. Collection of Scientific Papers: Analysis and Management of Systems in Mining), Apatity: GoI KF AN SSSR, 1988.

    Google Scholar 

  5. Chaplygin, N.N., Bliznyuk, G.I., Churkin, O.E., Myznikov, A.V., and Malinovskaya, M.P., Modeling the Development of Underground Mining Operations, Proc. All-Union Sci. Tech. Conf. on the Theory and Practice of Designing, Constructing and Operating High-Performance Underground Mines, Moscow: MGI, 1990.

  6. Belogorodtsev, O.V. and Savin, E.M., Automated Planning of Underground Mining Operations, Chernaya Metallurgiya. Byull. Nauch. Tekh. Ekon. Inf., 2013, no. 10, pp. 15–19.

  7. Lukichev, S.V. and Nagovitsyn, O.V., Digital Transformation of the Mining Industry: Past, Present, and Future, Gornyi Zhurnal, 2020, no. 9, pp. 13–18.

  8. Lukichev, S.V., Nagovitsyn, O.V., Il’in, E.A., and Rudin, R.S., Digital Technologies for Engineering Support of Mining Operations—The First Step towards the Creation of “Smart” Mining Production, Gornyi Zhurnal, 2018, no. 7, pp. 86–90.

  9. Mine Production Planning in Geological and Mining Information System MINE ADVISOR. Available at: https://sight-power.com/ru/solutions/mine-planning-automation.

  10. Manrı́quez, F., Pérez, J., and Morales, N., A Simulation–Optimization Framework for Short-Term Underground Mine Production Scheduling, Optimization Eng., 2020, no. 21, pp. 939–971.

    Article  Google Scholar 

  11. Turtygina, N.A. and Sidorov, D.V., Planning the Quality of Ore-Mineral Raw Materials in the Development of Mining Operations, Nauch. Vestn. Arktiki, 2018, no. 4, pp. 11–17.

  12. Stadnik, D.A., Gabaraev, O.Z., Stadnik, N.M., and Tedeev, A.M., Improving the Methodological Foundations of Automated Scheduling of Mining Development when Designing Underground Mining of Ore Deposits, Mining Informational and Analytical Bulletin–GIAB, 2020, no. 11-1, pp. 189–201.

  13. Belogorodtsev, O.V., Nagovitsyn, O.V., and Savin, E.M., Mine Development Planning Module in MINEFRAME Software Package, Mining Informational and Analytical Bulletin–GIAB, 2014, no. 7, pp. 268–272.

  14. Andrade, A.B. and Rampazzo, P.C.B., Understanding Plan’s Priorities: Short Term Scheduling Optimization, Application of Computers and Operations Research in the Mineral Industry, Proc. 39th Int. Symp. APCOM, Wroclaw, Poland, 2019.

  15. Dimitrakopoulos, R., Stochastic Optimization for Strategic Mine Planning: A Decade of Developments, Journal of Mining Science, 2011, vol. 47, no. 2, pp. 138–150.

    Article  Google Scholar 

  16. Nagovitsyn, O.V. and Lukichev, S.V., Gorno-geologicheskie informatsionnye sistemy—istoriya razvitiya i sovremennoe sostoyanie (Mining and Geological Information Systems—History of Development and Current Situation), Apatity: KNTs RAN, 2016.

    Google Scholar 

  17. Laptev, V.V. and Zvonareva, S.V., Calculation of Muck Transportation Parameters in Automated Underground Mine Production Planning, Mining Informational and Analytical Bulletin–GIAB, 2022, no. 2, pp. 70–80.

  18. Lukichev, S.V., Nagovitsyn, O.V., and Laptev, V.V., Digital Tools for Underground Mine Planning: Cut-and-Fill Mining, Eurasian Min., 2021, no. 1, pp. 75–78.

  19. Lukichev, S.V., Nagovitsyn, O.V., and Laptev, V.V., Short- and Medium-Term Planning of Underground Mining Operations, Proc.: Application of Computers and Operations Research in the Minerals Industries, The Southern African Institute of Mining and Metallurgy, Johannesburg, 2021.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding authors

Correspondence to V. V. Laptev or K. P. Gurin.

Additional information

Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, 2023, No. 3, pp. 159-166. https://doi.org/10.15372/FTPRPI20230316.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Laptev, V.V., Gurin, K.P. Automated Planning of Underground Mining Operations with Regard to Geological and Geotechnical Constraints. J Min Sci 59, 490–496 (2023). https://doi.org/10.1134/S106273912303016X

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1134/S106273912303016X

Keywords

Navigation