Abstract
The tectonic structures of different rank are distinguished in the Norilsk Region. The first-order block structure is formed by intersection of rank I geodynamically active faults: Khatanga, Imangda-Kystykhtakh, Norislk, Fokin-Tangaralakh megafaults and other. Rank II faults are the Norilsk-Kharaelakh fault, which intersects the mine field, and other 7 structures. Using geological sections and boring records obtained within the mining lease, slip faults and oblique-slip faults of rank III, represented by ridges in the terrain, are plotted in the satellite image. In the rockburst-hazardous high-grade ore sites in Glubokaya mine, it is recommended to arrange safe zones by advance boring of destressing holes in underground openings in zones of rank III faults.
Similar content being viewed by others
References
Federal’nye normy i pravila v oblasti promyshlennoi bezopasnosti: “Pravila bezopasnosti pri vedenii gornykh rabot i pererabotke tvyordykh poleznykh iskopaemykh (utverzhdeno prikazom ot 11.11.2013 g. № 599 Rostekhnadzora Rossii) (Federal Guidelines and Rules on Industrial Safety FniP 06-13. Safety Rules in Mining and Processing Solid Mineral Deposits (approved by the Decree no. 599 of Rostekhnadzor of Russia on 11.11.2013)), Moscow: OOO NIITS Nedra–XXI, 2015.
Rukovodstvo po geodinamicheskomu rayonirovaniyu shakhtnykh poley (Guidelines on Mine Field Geodynamic Zoning), Saint Petersburg: VNIMI, 2012.
Shabarov, A.N., Filinkov, A.A, Zubkov, V.V., Tsyrel’, S.V., Zvezdkin, V.A., Suchilin, A.V., Guseva, N.V., Il’inov, M.D., Kartashov, Yu.M., Karmanskii, A.T., Korshunov, V.A., Kozlov, V.A., and Vasil’eva T.V., Metodicheskie ukazaniya po otsenke sklonnosti rudnykh i nerudnykh mestorozhdenii k gornym udaram (Methodical Instructions on Estimating Ore and Industrial Mineral Deposits Disposition to Rock Bursts), Saint Petersburg: SPbGU, 2011.
Batugina, I.M. and Petukhov, I.M., Geodinamicheskoe rayonirovanie mestorozhdenii pri proektirovanii i ekspuatatsii rudnikov (Geodynamic Zoning of Deposits in Mine Designing and Operation), Moscow: Nedra, 1988.
Ermolov, V.A., Larichev, L.N., and Moseykin, V.V., Geologiya: uchebnik dlya vuzov (v dvukh chastyakh). Chast 1: Osnovy geologii (College Textbook on Geology in Two Parts. Part I: Foundations of Geology), Moscow: MGGU, 2004.
Petukhov, I.M. and Batugina, I.M. (Editors), Geodinamicheskoe rayonirovanie nedr. Metodicheskie ukazaniya (Geodynamic Zoning of the Earth Interior. Methodological Instructions), Moscow; Leningrad: VNIMI, 1990.
Eremenko, A.A., Eremenko, V.A., and Gaydin, A.P., Gorno-geologicheskie i geomekhanicheskie usloviya razrabotki zheleznorudnykh mestorozhdenii v Altae-Sayanskoi skladchatoi oblasti (Geological and Geomechanical Conditions of Mining Iron-Ore Deposits in Altai-Sayan Faulting), Novosibirsk: Nauka, 2009.
Surkov, V.S. and Zhero, O.G., Fundament i razvitie platformennogo chekhla Zapadno-Sibirskoi plity (Foundation and Development of West Siberian Plate Sedimentary Cover), Moscow: Nedra, 1981.
Available at: http://www.goodle.com/maps.
Leont’ev, A.V., Analysis of Natural Stresses According to the Measurement Results in Mines on the Territory of Northern Eurasia, J. Min. Sci., 2001, vol. 37, no. 1, pp. 31–40.
Olovyannyi, A.G., Smirnov, V.A., Samorodov, B.N., and Marysyuk, V.P., Modelirovanie napryazhenno-deformirovannogo sostoyaniya massiva v okrestnosti gornykh vyrabotok rudnika “Skalistyi”. Geodinamika i napryazhennoe sostoyanie nedr Zemli (Rock Mass Stress-Strain State Modeling in the Vicinity of Mine Openings of the Skalisty Mine. Geodynamics and Stress State of the Earth Interior), Novosibirsk: IGD SO RAN, 2004.
Olovyannyi, A.G., and Smirnov, V.A., Otsenka sostoyaniya massiva vokrug gornykh vyrabotok rudnika “Skalistyi” metodom matematicheskogo modelirovaniya. Dobycha i pererabotka rud Norilskogo promyshlennogo rayona (Rock Mass State Estimate around Openings of Skalisty Mine by Mathematical Modeling. Mining and Processing Norilsk Industrial District Ores), Norilsk: NGGI, 2005.
Sadovskii, M.A.., Bolkhovitinov, L.G., Bogdanov, M.N., and Pisarenko, V.F., Discreteness Properties of Rocks, Izv. AN SSSR, Fizika Zemli, 1982, no.12, pp. 3–18.
Karelin, V.N., Marysyuk, V.P., Nagovitsyn, Yu.N., Vil’chinskii, V.B., and Zvezdkin, V.A., Investigation of Geomechanical State of Ore–Rock Mass in the Field of Skalisty Mine, Gornyi Zhurnal, 2010, no. 6, pp. 63–65.
Petukhov, I.M., Egorov, P.V., Skitovich, V.P., and Lotsenyuk, B.G., Rezultaty izucheniya napryazhennogo sostoyaniya netronutogo massiva porod na Talnakhskom i Oktyabr’skom mestorozhdeniyakh. Izmerenie napryazhenii v massive gornykh porod: sb.tr. (Results of Studying Stress State of Intact Rock Mass in the Talnakhsky and Oktyabrsky eposits. Stress State Measurement in the Rock Mass: Coll. of Works), Novosibirsk, IGD SO AN SSSR, part II, pp. 6–9, 1976.
Ukazaniya po bezopasnomu vedeniyu gornykh rabot na Talnakhskom i Oktyabrskom mestorozhdeniyakh, sklonnykh i opasnykh po gornym udaram (Guidelines on Safe Mining Operations in the Rockburst-Hazardous Talnakhsky and Oktyabrsky Deposits), Norilsk, 2015.
Smirnov, A.A., Zvezdkin, V.A., Shabarov, A..N., Samorodov, B.N., and Marysyuk, V.P., Predicting and Securing Stability of Mine Openings in the Mines of Norilsk Nickel Mining and Metallurgical Company, Gornyi Zhurnal, 2004, no. 12.
Khubulov, O.Yu., Anushenkov, A..N., Artemenko, Yu.V., and Uskov, V.A., Increasing Capacity of Existing Backfilling Complexes in the Mines of Western Branch of Norilsk Nickel Mining and Metallurgical Company due to Existing Mills Modernization, Gornyi Zhurnal, 2010, no. 6, pp. 85–87.
Karelin, V.N., Badtiev, B.P., Marysyuk, V.P., Ainbinder, I.I., and Arshavskii, V.V., Investigations of Influence Exerted by Room Parameters on Outcropping Stability of Undermined Impregnated Ore in Place, Gornyi Zhurnal, 2010, no. 6, pp. 55–57.
Tapsiev, A.P., and Uskov, V.A., Comparative Feasibility Study of the Mining Systems with Regard to Beneficiation and Metallurgical Extraction in the Mines of Western Branch of Norilsk Nickel Mining and Metallurgical Company, Fund. Prikl. Vopr. Gorn. Nauk, 2016, vol. 1, no. 3, pp. 201–205.
Galanov, R.B., Kholichev, E.V., Nagovitsyn, Yu.N, Andreev, A..A.., and Mulev, S.N., Geomechanical Situation at Cutting on Bolshoy Gorst Site of the Taimyrsky Mine, Gornyi Zhurnal, 2013, no. 2, pp. 14–19.
Author information
Authors and Affiliations
Corresponding authors
Additional information
Russian Text © The Author(s), 2019, published in Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, 2019, No. 1, pp. 86–96.
Rights and permissions
About this article
Cite this article
Uskov, V.A., Eremenko, A.A., Darbinyan, T.P. et al. Geodynamic Hazard Assessment for Tectonic Structures in Underground Mining of North Ore Bodies in the Oktyabrsky Deposit. J Min Sci 55, 77–87 (2019). https://doi.org/10.1134/S1062739119015312
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1134/S1062739119015312