Abstract
The article formulates the problem on optimization of depth for transition from open pit to underground coal mining, considering lag factor. The main regularities are presented together with the numerical calculation of the set problem in terms of the Raspadsky Open Pit Mine using the dynamic programming method.
Similar content being viewed by others
References
Suprun, V.I., Rybak, L.V., Radchenko, S.A., et al., Validation of Open Pit Mining Limits in Large Coal Centroclinal Folds, Ugol’, 2012, no. 6.
Tverdov, A.A., Zhura, A.V., Nikishichev, S.B., Modern Approaches to Finding Open Pit Mining Limits, Ugol’, 2009, no. 2.
Anistratov, Yu.I. and Anistratov, K.Yu., Open Pit-to-Underground Mining of Coal, Ugol’, 2009, no. 2.
Kaputin, Yu.E., Informatsionnye tekhnologii planirovaniya gornykh rabot (Information Technologies for Mine Planning), Saint-Petersburg: Nedra, 2004.
Kaputin, Yu.E., Informatsionnye tekhnologii planirovaniya i ekonomicheskaya otsenka gornykh proektov (Information Technologies of Mine Planning and Economic Appraisal of Mine Projects), Saint-Petersburg: Nedra, 2008.
Dimitrakopoulos, R., Stochastic Optimization of Strategic Mine Planning: A Decade of Developments, J. Min. Sci., 2011, vol. 47, no. 2, pp. 138–150.
Elkington, T. and Durham, R., Integrated Open Pit Pushback Selection and Production Capacity Optimization, J. Min. Sci., 2011, vol. 47, no. 2, pp. 177–190.
Abdel Sabur S.A. and Dimitrakopoulos, R., Incorporating Geological and Market Uncertainties and Operational Flexibility into Open Pit Mine Design, J. Min. Sci., 2011, vol. 47, no. 2, pp. 191–201.
Richmond, A., Evaluating Capital Investment Timing with Stochastic Modeling of Time-Dependent Variables in Open Pit Optimization, J. Min. Sci., 2011, vol. 47, no. 2, pp. 227–334.
Godoy, M. and Dimitrakopoulos, R., A Risk Quantification Framework for Strategic Mine Planning: Method and Application, J. Min. Sci., 2011, vol. 47, no. 2, pp. 235–246.
King, B., Optimal Mining Practice in Strategic Planning, J. Min. Sci., 2011, vol. 47, no. 2, pp. 247–253.
Achireko, P.K., Application of Modified Conditional Simulation and Artificial Neural Networks to Open Pit Mining, Canada, Nova Scotia, Halifax, Dalhousie University Daltech, 1998.
Meagher, C., Dimitrakopoulos, R., and Avis, D., Optimized Open Pit Mine Design, Pushbacks and the Gap Problem: A Review, J. Min. Sci., 2014, vol. 50, no. 3, pp. 508–526.
Ordin, A.A., Dinamicheskie modeli optimizatsii proektnoi moshchnosti shakhty (Dynamic Models of Mine Production Capacity Optimization), Novosibirsk: IGD SO AN SSSR, 1991.
Ordin, A.A., Nikol’sky, A.M., and Golubev, Yu.G., Lag Modeling and Design Capacity Optimization at Operating Diamond Placer Mines Solur and Vostochny, Republic of Sakha (Yakutia), J. Min. Sci., 2012, vol. 48, no. 3, pp. 515–524.
Ordin, A.A. and Klishin, V.I., Optimizatsiya tekhnologicheskikh parametrov gornodobyvayushchikh predpriyatii na osnove lagovykh modelei (Lag Modeling-Based Optimization of Mine Design Parameters), Novosibirsk: Nauka, 2009.
Kodola, V.V. and Ordin, A.A., Design Optimization of an Underground Mining Site in the Operating Sibirginsky Open Pit Mine, Ugol’, 2000, no. 8.
Bellman, R., Dynamic Programming, Princeton University Press, 1957.
Author information
Authors and Affiliations
Corresponding author
Additional information
Original Russian Text © A.A. Ordin, I.V. Vasil’ev, published in Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, 2014, No. 4, pp. 97–108.
Rights and permissions
About this article
Cite this article
Ordin, A.A., Vasil’ev, I.V. Optimized depth of transition from Open Pit to underground coal mining. J Min Sci 50, 696–706 (2014). https://doi.org/10.1134/S1062739114040103
Received:
Published:
Issue Date:
DOI: https://doi.org/10.1134/S1062739114040103