Abstract
Results obtained from elaboration of a procedure for estimating replacement terms for the condenser tube systems of steam turbine installations are presented. Censored data processing methods are used in performing statistical assessment of replacement terms. The service life of condenser tubes blanked off in the course of turbine operation is assumed to be known (complete operation time), and that for tubes blanked off during the turbine repair process is assumed to be undetermined (censored operation time). The criterion for estimating the replacement term for a condenser tube system is defined as the ratio between the number of tubes blanked off during a repair and in the course of turbine operation. The procedure is validated by the results from a study on analyzing the damageability of tubes made of different materials for the condensers of 11 turbines with capacities ranging from 25 to 500 MW.
Similar content being viewed by others
References
Yu. M. Brodov, K. E. Aronson, A. T. Mutovin, et al., Improving the Efficiency and Reliability of Heat-Transfer Apparatuses of Steam Turbine Installations under Field Conditions (UrFU, Yekaterinburg, 2010) [in Russian].
OST (Industry Standard) 108.005.31-83: Assessing the Quality Level of Heat-Transfer Equipment Used at Nuclear Power Plants.
R. S. Reznikova, E. I. Benenson, Yu. M. Brodov, et al., “Estimating the optimal time of replacing the tube bundles of turbine machinery heat-transfer apparatuses,” Therm. Eng., No. 2 (1085).
L. S. Baran, Diagnostics and Optimization of the Operating Characteristics of Steam Turbine Condensing Installations, Candidate’s Dissertation in Technical Sciences (NPO TsKTI, Leningrad, 1989).
V. G. Kritskii and P. S. Styazhkin, “Corrosion of copper-alloy tubes in cooling systems of nuclear power stations,” Therm. Eng., No. 8, 643 (1997).
V. I. Nikitin, “Corrosive damage to the condensers of steam turbines and determining the residual life of their tube system,” Therm. Eng., No. 11, 923 (2001).
Yu. A. Tsagareli, “Service life prediction for a condenser tube bundle during its operation,” Elektr. Stn., No. 8, 21–26 (1992).
K. E. Aronson, A. Yu. Ryabchikov, Yu. M. Brodov, and B. E. Murmanskii, “A procedure for evaluating and predicting the remaining life of the condenser tube systems used in steam turbine installations,” Elektr. Stn., No. 2, 25–31 (2010).
V. M. Skripnik, A. E. Nazin, and Yu. G. Prikhod’ko, Analyzing the Reliability of Technical Systems on the Basis of Censored Samplings (Radio i Svyaz’, Moscow, 1988) [in Russian].
K. E. Aronson, Yu. M. Brodov, P. N. Plotnikov, et al., “An analysis of indicators characterizing the reliability of auxiliary equipment of power units,” Therm. Eng., No. 8, 623 (2011).
V. K. Sedov, V. V. Panchenko, and N. S. Gabriichuk, “Experience gained from operations on removing deposits from the condensers of steam turbines at the Novovoronezh nuclear power plant,” Elektr. Stn., No. 5, 4–6 (1978).
B. V. Gnedenko, A Course of Probability Theory (Nauka, Moscow, 1998) [in Russian].
Author information
Authors and Affiliations
Additional information
Original Russian Text © K.E. Aronson, A.Yu. Ryabchikov, Yu.M. Brodov, M.I. Loginov, 2013, published in Teploenergetika.
Rights and permissions
About this article
Cite this article
Aronson, K.E., Ryabchikov, A.Y., Brodov, Y.M. et al. Development of a procedure for substantiating replacement terms for the condenser tubes of steam turbine installations. Therm. Eng. 60, 567–572 (2013). https://doi.org/10.1134/S0040601513080016
Published:
Issue Date:
DOI: https://doi.org/10.1134/S0040601513080016