Skip to main content
Log in

The method for determining the ball load and the grinding capacity of a ball-tube mill from the power consumed by its electric motor

  • Published:
Thermal Engineering Aims and scope Submit manuscript

Abstract

The method for determining the ball load and the grinding capacity from the power consumed by the ball-tube mill under operating and emptying conditions is presented. The implementation of this method when grinding gas coals in the ball-tube mill of the ShBM 370/850(Sh-50a) type is discussed.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. V. I. Trembovlya, Ye. D. Finger, and A. A. Avdeeva, Thermotechnical Tests of Boiler Plants (Moscow, Energoizdat, 1991) [in Russian].

    Google Scholar 

  2. L. A. Letin and K. F. Roddatis, Medium-Speed and Low-Speed Pulverizers (Moscow, Energoizdat, 1981) [in Russian].

    Google Scholar 

  3. A. N. Lebedev, Fuel Preparation and Grinding at Thermal Power Plants (Moscow, Energiya, 1969) [in Russian].

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Additional information

Original Russian Text © L.V. Golyshev, I.S. Mysak, 2012, published in Teploenergetika.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Golyshev, L.V., Mysak, I.S. The method for determining the ball load and the grinding capacity of a ball-tube mill from the power consumed by its electric motor. Therm. Eng. 59, 589–592 (2012). https://doi.org/10.1134/S0040601512080058

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1134/S0040601512080058

Keywords

Navigation