Abstract
The method for determining the ball load and the grinding capacity from the power consumed by the ball-tube mill under operating and emptying conditions is presented. The implementation of this method when grinding gas coals in the ball-tube mill of the ShBM 370/850(Sh-50a) type is discussed.
Similar content being viewed by others
References
V. I. Trembovlya, Ye. D. Finger, and A. A. Avdeeva, Thermotechnical Tests of Boiler Plants (Moscow, Energoizdat, 1991) [in Russian].
L. A. Letin and K. F. Roddatis, Medium-Speed and Low-Speed Pulverizers (Moscow, Energoizdat, 1981) [in Russian].
A. N. Lebedev, Fuel Preparation and Grinding at Thermal Power Plants (Moscow, Energiya, 1969) [in Russian].
Author information
Authors and Affiliations
Additional information
Original Russian Text © L.V. Golyshev, I.S. Mysak, 2012, published in Teploenergetika.
Rights and permissions
About this article
Cite this article
Golyshev, L.V., Mysak, I.S. The method for determining the ball load and the grinding capacity of a ball-tube mill from the power consumed by its electric motor. Therm. Eng. 59, 589–592 (2012). https://doi.org/10.1134/S0040601512080058
Published:
Issue Date:
DOI: https://doi.org/10.1134/S0040601512080058