Skip to main content
Log in

Retrofitting the Strogino district heat supply station with construction of a 260-MW combined-cycle power plant (Consisting of two PGU-130 combined-cycle power units)

  • Published:
Thermal Engineering Aims and scope Submit manuscript

Abstract

The retrofitting carried out at the Strogino district heat supply station and the specific features of works accomplished in the course of constructing the thermal power station based on a combined-cycle power plant at the station site are described; the layout solutions for the main building and turbine building are presented, and a comparison of the retrofitted station with the Kolomenskoe and Vnukovo gas turbine-based power stations is given.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Additional information

Original Russian Text © V.F. Aleksandrov, 2010, published in Teploenergetika.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Aleksandrov, V.F. Retrofitting the Strogino district heat supply station with construction of a 260-MW combined-cycle power plant (Consisting of two PGU-130 combined-cycle power units). Therm. Eng. 57, 173–174 (2010). https://doi.org/10.1134/S0040601510020151

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1134/S0040601510020151

Keywords

Navigation