Skip to main content
Log in

Main results of the work accomplished at ZAO Interavtomatika for 15 years

  • Published:
Thermal Engineering Aims and scope Submit manuscript

Abstract

Main results of the activities carried out by ZAO Interavtomatika in the Russian market of power engineering are presented. Main lines of activities are described, the results of putting in use control systems are analyzed, and prospects for their further development are presented.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. A. G. Sviderskii and Kh. Kharpel’, “New Technical Facilities for Equipping Power Industry Plants Facilities with Automatic Control Systems,” Teploenergetika, No. 10, 9–13 (2008) [Therm. Eng., No. 10 (2008)].

  2. L. L. Grekhov, V. A. Bilenko, N. N. Derkach, et al., “The Automatic Process Control System for the 500-MW Power Unit at the Reftinsk District Power Station,” Elektr. Stn., No. 5, 61–68 (2002).

  3. V. A. Bilenko, N. N. Derkach, E. E. Mikushevich, and D. Yu. Nikol’skii, “Development and Commissioning of Systems for Regulating the Main Parameters of a Boiler within the Scope of the Process Control System of the 500-MW Power Unit at the Reftinsk District Power Station,” Teploenergetika, No. 10, 2–9 (1999) [Therm. Eng., No. 10 (1999)].

  4. V. A. Bilenko, A. D. Melamed, E. E. Mikushevich, et al., “Development and Application of Automatic Frequency and Power Control Systems for Large Power Units,” Teploenergetika, No. 10, 13–26 (2008) [Therm. Eng., No. 10 (2008)].

  5. I. Z. Chernomzav and K. A. Nefedov, “Improvement of Automatic Control Systems for Large-Capacity Steam Turbines,” Teploenergetika, No. 10, 27–33 (2008) [Therm. Eng., No. 10 (2008)].

  6. I. Z. Chernomzav, D. A. Zhezherya, R. V. Mukharryamov, and A. A. Perezhogina, “The System for Automatically Controlling the Processes in a GTE-110, Russia’s First High-Temperature Large-Capacity Gas Turbine,” Teploenergetika, No. 10, 61–68 (2008) [Therm. Eng., No. 10 (2008)].

  7. K. A. Molchanov, V. P. Strashnykh, D. A. Zhezherya, and O. A. Manevskaya, “A Full-Scale Training Simulator for Educating the Operative Personnel of the PGU-450 Unit at OAO Mosenergo’s Cogeneration Station TETs-27,” Teploenergetika, No. 10, 69–76 (2008) [Therm. Eng., No. 10 (2008)].

Download references

Author information

Authors and Affiliations

Authors

Additional information

Original Russian Text © V.V. Lysko, A.G. Sviderskii, V.A. Bilenko, A.A. Anan’ev, 2008, published in Teploenergetika.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Lysko, V.V., Sviderskii, A.G., Bilenko, V.A. et al. Main results of the work accomplished at ZAO Interavtomatika for 15 years. Therm. Eng. 55, 811–818 (2008). https://doi.org/10.1134/S0040601508100017

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1134/S0040601508100017

Keywords

Navigation