We describe the main activities carried out at the Central Boiler-Turbine Institute Research and Production Association Department for Strength and Service Life of Power-Generating Equipment on solving comprehensive problems of ensuring the strength and durability of steam, gas, and hydraulic turbines; boilers, and steam lines, as well as auxiliary equipment of thermal and nuclear power stations.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. L. P. Safonov, N. V. Golovanov, V. I. Rozenblyum, et al., Problems of Increasing the Longevity of Boiler and Turbine Equipment, Trudy TsKTI, No. 172, 3–13 (1979).

  2. V. F. Rezinskikh, E. A. Grin’, and V. F. Zlepko, A Concept of Extending the Service Life of the Metal of TPS Equipment, Prom. Energ., No. 4, 25–29 (2002).

  3. V. I. Lebedev, B. M. Oreshkin, and A. V. Sudakov, Extending the Service Life of the Equipment of NPS Power Units, Trudy TsKTI, No. 282, 28–44 (2002).

  4. L. L. Smelkov and Yu. L. Shraiber, Problems Pertinent to Assessment of the Remaining Service Life of the Main Parts of Hydraulic Turbines, in Abstracts of Reports Presented at the Seminar Experience with Operation and Retrofitting of Hydraulic Turbine Equipment, Ust-Narva, October 3–5, 1989, pp. 16–18.

  5. SO (Industry Standard) 153-34.17.421-2003: A Typical Instruction for Examining the Metal of the Main Parts of Boilers, Turbines, and Pipelines at Thermal Power Stations and Extending Its Service Life (ORGRES, Moscow, 2003) [in Russian].

    Google Scholar 

  6. RD (Guidelines) EO 0630-05: Methodical Guidelines for Examination of Metal with the Purpose of Extending the Service Life of Turbines at Nuclear Power Stations Beyond the Assigned Service Life (FGUP Rosenergoatom Concern, Moscow, 2005) [in Russian].

    Google Scholar 

  7. RD (Guidelines) EO 0478-03: A Procedure for Technical Diagnostics and Extension of the Design Service Life of Vessels and Heat Exchangers of Systems Important to the Safety of the Power Units at the Leningrad NPS Equipped with an RBMK-1000 Reactor (FGUP Rosenergoatom Concern, Moscow, 2003) [in Russian].

    Google Scholar 

  8. N. N. Vinogradov, E. M. Rabinovich, N. N. Korop, et al., Improving the Tightness of the Shell Joints of PT-60-130 Turbines, Trudy TsKTI, No. 201, 17–23 (1983).

  9. A. N. Kovalenko and A. I. Levchenko, The Problems of Increasing the Service Life of Turbines for Prospective NPS Power Units, Trudy TsKTI, No. 292, 56–65 (2003).

  10. A. I. Levchenko and L. V. Fedorova, A Calculated Assessment of the Remaining Service Life of Steam Turbine Rotors Taking the Creep of Material into Account, Trudy TsKTI, No. 293, 315–323 (2004).

  11. A. I. Levchenko, A. V. Sudakov, L. V. Fedorova, and L. P. Naumov, Carrying Out Studies for Assessing the Possibility of Further Operation of the K-220-44 Turbine Units at the Kola NPS, Trudy TsKTI, No. 291, 165–171 (2002).

  12. S. A. Avramenko, N. N. Vinogradov, and V. I. Rozenblyum, The Creep of Steam Turbine Rotors under the Conditions of Power Stations, Energomashinostroenie, No. 1, 30–31 (1975).

  13. RTM (Guidelines) 108.021.55-77: Repairing Buckled Shells of Steam Turbines (NPO TsKTI, Leningrad, 1977) [in Russian].

    Google Scholar 

  14. S. A. Avramenko and N. N. Vinogradov, Development and Adjustment of a Device for Measuring the Creep Strain of Turbine Rotors and Experience with Using It at Power Stations, Trudy TsKTI, No. 124, 5–8 (1974).

  15. Recommendations on Improving the Tightness of the Horizontal Joints of Steam Turbines, Ed. by N. N. Vinogradov and E. M. Rabinovich (NPO TsKTI, Leningrad, 1981) [in Russian].

  16. RTM (Guidelines) 108.021.18-85: Strength Calculation of the Tie Bolts for Rotor Couplings (NPO TsKTI, Leningrad, 1985) [in Russian].

    Google Scholar 

  17. RD (Guidelines) 10-262-98: Instruction for Examination and Extension of the Service Life of the Components of Boilers, Turbines, and Pipelines at TPSs (NPO TsKTI, St. Petersburg, 1998) [in Russian].

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Sudakov, A.V., Gavrilov, S.N., Danyushevskii, I.A. et al. Activities Carried Out at the NPO TsKTI on Ensuring the Strength and Service Life of Power-Generating Equipment. Therm. Eng. 55, 62–66 (2008). https://doi.org/10.1134/S0040601508010138

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1134/S0040601508010138

Keywords

Navigation