Skip to main content
Log in

Organization of Air Preparation for Gas-Turbine Power Units of Different Power Capacities

  • Published:
Thermal Engineering Aims and scope Submit manuscript

Abstract

The experience gained at the Central Boiler-Turbine Institute Research and Production Association in the design and manufacture of air preparation systems for gas turbines is described. Some recent developments are used to illustrate the main principles and methods of constructing modern air preparation devices for gas-turbine power installations of different power capacities and for different climatic conditions.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Khomenok, L.A., Mikhailov, V.E., Strashnikov, A.A. et al. Organization of Air Preparation for Gas-Turbine Power Units of Different Power Capacities. Therm. Eng. 55, 45–49 (2008). https://doi.org/10.1134/S0040601508010102

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1134/S0040601508010102

Keywords

Navigation