Abstract
The experience gained at the Central Boiler-Turbine Institute Research and Production Association in the design and manufacture of air preparation systems for gas turbines is described. Some recent developments are used to illustrate the main principles and methods of constructing modern air preparation devices for gas-turbine power installations of different power capacities and for different climatic conditions.
Similar content being viewed by others
Author information
Authors and Affiliations
Rights and permissions
About this article
Cite this article
Khomenok, L.A., Mikhailov, V.E., Strashnikov, A.A. et al. Organization of Air Preparation for Gas-Turbine Power Units of Different Power Capacities. Therm. Eng. 55, 45–49 (2008). https://doi.org/10.1134/S0040601508010102