Thermal and chemical tests of the steam generator of unit 3 at the Kalinin nuclear power station

  • Published:
Thermal Engineering Aims and scope Submit manuscript

Abstract

The results obtained from combined thermal and chemical tests of the steam generator of Unit 3 at the Kalinin nuclear power station are summarized. The obtained data are compared with the results of thermal and chemical tests carried out on steam generators at other nuclear power stations equipped with VVER-1000 reactors, and recommendations on selecting the steam-generator blowdown schedule are given.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Additional information

Original Russian Text © N.N. Davidenko, N.B. Trunov, E.S. Saakov, A.A. Berezanin, I.N. Bogomolov, V.P. Derii, D.S. Nemytov, D.A. Usanov, N.B. Shestakov, S.V. Shchelik, 2007, published in Teploenergetika.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Davidenko, N.N., Trunov, N.B., Saakov, E.S. et al. Thermal and chemical tests of the steam generator of unit 3 at the Kalinin nuclear power station. Therm. Eng. 54, 971–980 (2007). https://doi.org/10.1134/S0040601507120051

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1134/S0040601507120051

Keywords

Navigation