We present the results of the certification tests of the station No. 1 power unit of the Pskov district power station that were carried out in October 2006 and aimed at checking if the unit complies with the requirements for the standardized primary and automatic secondary control of the frequency in a power system.
Similar content being viewed by others
Author information
Authors and Affiliations
Additional information
Original Russian Text © N.I. Prytkov, V.V. Fedorov, K.V. Komarov, N.I. Davydov, N.V. Zorchenko, M.A. Zhiganov, 2007, published in Teploenergetika.
Rights and permissions
About this article
Cite this article
Prytkov, N.I., Fedorov, V.V., Komarov, K.V. et al. Certification tests of the 215-MW power unit at the Pskov district power station for conformity with the standards under which the units of thermal power stations may participate in the standardized primary and automatic secondary control of frequency. Therm. Eng. 54, 763–768 (2007). https://doi.org/10.1134/S0040601507100011
Issue Date:
DOI: https://doi.org/10.1134/S0040601507100011