Abstract
Offers of OAO Silovye Mashiny for delivery of equipment for combined-cycle installations (CCIs) of reconstructed and newly built power stations are presented.
Similar content being viewed by others
References
G. Butalov, I. Zaletov, A. Lebedev, and V. Kumin, “Gas-Turbine Installations of OAO LMZ of 160–180 MW capacity,” Gas-Turbine Technologies, no. 4, 14–16 (2002).
A. S. Lebedev, G. L. Butalov, I. V. Patrina, and V.A. Fomin, “Gas-Turbine Installations, of LMZ Affiliated Branch of the OAO “Silovye Mashiny” in St. Petersburg for Thermal Power Plants, “in Proc. of International Theoretical and Practical Conference “Modern Turbine Building,” 28–30 Sept., 2004.
G. Bohrenkaempfer, D. Reiermann, G. G. Hoehe, and U. Lingner, In Proc. “Siemens Power Generation, Germany. Technology Evolution of the Proven Gas Turbine Models V94.2 and V84.2 for New Units and Service Retrofits, in Proc. “Russia Power” Expocenter, Moscow, 9–11 March 2005, Russia.
Author information
Authors and Affiliations
Additional information
Original Russian Text © A.S. Lebedev, G.L. Butalov, 2007, published in Teploenergetika.
Rights and permissions
About this article
Cite this article
Lebedev, A.S., Butalov, G.L. Creation of equipment for combined-cycle installations—One of the priority problems facing power-machinery builders. Therm. Eng. 54, 296–300 (2007). https://doi.org/10.1134/S0040601507040106
Issue Date:
DOI: https://doi.org/10.1134/S0040601507040106