Skip to main content
Log in

Creation of equipment for combined-cycle installations—One of the priority problems facing power-machinery builders

  • Published:
Thermal Engineering Aims and scope Submit manuscript

Abstract

Offers of OAO Silovye Mashiny for delivery of equipment for combined-cycle installations (CCIs) of reconstructed and newly built power stations are presented.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. G. Butalov, I. Zaletov, A. Lebedev, and V. Kumin, “Gas-Turbine Installations of OAO LMZ of 160–180 MW capacity,” Gas-Turbine Technologies, no. 4, 14–16 (2002).

  2. A. S. Lebedev, G. L. Butalov, I. V. Patrina, and V.A. Fomin, “Gas-Turbine Installations, of LMZ Affiliated Branch of the OAO “Silovye Mashiny” in St. Petersburg for Thermal Power Plants, “in Proc. of International Theoretical and Practical Conference “Modern Turbine Building,” 28–30 Sept., 2004.

  3. G. Bohrenkaempfer, D. Reiermann, G. G. Hoehe, and U. Lingner, In Proc. “Siemens Power Generation, Germany. Technology Evolution of the Proven Gas Turbine Models V94.2 and V84.2 for New Units and Service Retrofits, in Proc. “Russia Power” Expocenter, Moscow, 9–11 March 2005, Russia.

Download references

Author information

Authors and Affiliations

Authors

Additional information

Original Russian Text © A.S. Lebedev, G.L. Butalov, 2007, published in Teploenergetika.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Lebedev, A.S., Butalov, G.L. Creation of equipment for combined-cycle installations—One of the priority problems facing power-machinery builders. Therm. Eng. 54, 296–300 (2007). https://doi.org/10.1134/S0040601507040106

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1134/S0040601507040106

Keywords

Navigation