Abstract
We consider problem settings and methods of job-shop scheduling on mechanical engineering facilities whose production departments manufacture components, and the final products are assembled on conveyors. Job schedules are constructed both in terms of incoming orders for manufactured products and in terms of existing demand and storage costs at the company warehouses until the moment of sale.
Similar content being viewed by others
References
Khobotov, E.N., On Some Models and Methods of the Solution of Scheduling Problems in Discrete Enterprises, Autom. Remote Control, 2007, vol. 68, pp. 2172–2186.
Sidorenko, A.M. and Khobotov, E.N., Production Planning with Parallel Assembly of Units, Vest. MGTU im. N.E. Baumana, Ser. Mashinostroen., 2009, no. 3, pp. 100–109.
Kunyaev, M.S., Firsov, A.S., and Khobotov, E.N., On One Approach to Constructing a Job Scheduling System on a Mechanical Engineering Facility, Vest. MGTU im. N.E. Baumana, Ser. Mashinostroen., 2009, no. 4, pp. 91–102.
Sidorenko, A.M. and Khobotov, E.N., Aggregation in Job Scheduling on Mechanical Engineering Facilities, Teor. Sist. Upravlen., 2013, no. 5, pp. 132–144.
Larina, E.A., Sidorenko, A.M., and Khobotov, E.N., Choosing the Order of Assembly for Units and Modules in Job Scheduling on Facilities with Discrete Production, Probl. Upravlen., 2013, no. 3, pp. 71–77.
Khobotov, E.N., Control Problems and Methods for Multi-Nomenclature Reserves in Production, Izv. Ross. Akad. Nauk, Teor. Sist. Upravlen., 2011, no. 6, pp. 221–232.
Bruker, P., Scheduling Algorithms, Leipzig: Springer, 2007.
Jain, A.S. and Meeran, S., Theory and Methodology. Deterministic Job-Shop Scheduling: Past, Present and Future, Eur. J. Oper. Res., 1999, no. 112, pp. 390–434.
Zak, Yu.A., Prikladnye zadachi teorii raspisanii i marshrutizatsii perevozok (Applied Problems of Scheduling Theory and Transportation Routing), Moscow: Knizhnyi Dom “Librokom”, 2011.
Khobotov, E.N., Some Comments on Johnson Theorem, Autom. Remote Control, 1995, vol. 56, pp. 1506–1507.
Kalashnikov, V.V., Organizatsiya modelirovaniya slozhnykh sistem (Organization of Complex Systems Modeling), Moscow: Znanie, 1982.
Tsvirkun, A.D., Akinfiev, V.K., and Filippov, V.A., Imitatsionnoe modelirovanie v zadachakh sinteza struktury slozhnykh sistem (Imitational Modeling in Synthesis Problems for Structures of Complex Systems), Moscow: Nauka, 1985.
Box, G.E.P. and Jenkins, G.M., Time Series Analysis—Forecasting and Control, London: Holden-Day, 1970. Translated under the title Analiz vremennykh ryadov. Prognoz i upravlenie, Moscow: Mir, 1974.
Bazrov, B.M., Osnovy tekhnologii mashinostroeniya (Fundamentals of Mechanical Engineering Technology), Moscow: Mashinostroenie, 2005.
Author information
Authors and Affiliations
Corresponding authors
Additional information
Russian Text © The Author(s), 2019, published in Avtomatika i Telemekhanika, 2019, No. 5, pp. 155–172.
Rights and permissions
About this article
Cite this article
Khobotov, E.N., Ermolova, M.A. Aggregation in Job-Shop Scheduling Problems on Facilities with Conveyor Assembly of Finished Products. Autom Remote Control 80, 913–926 (2019). https://doi.org/10.1134/S0005117919050096
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1134/S0005117919050096