Skip to main content
Log in

Rich picture building in the soft systems methodology

  • Original Article
  • Published:
European Journal of Information Systems

Abstract

This paper examines the nature of rich picture building and its role within soft systems methodology. From an examination of published literature and accounts of the use of the methodology it is found that there is little agreement as to what is meant by ‘building a rich picture of the problem situation’. It is found that there is confusion about whether a ‘rich picture’ is considered to be an abstract, conceptual understanding of a problem situation or a literal diagram, about whether rich picture diagrams are a requirement of SSM and about their content and format. This paper identifies possible reasons for this confusion and discusses issues arising from it. A final section provides recommendations for the teaching of soft systems methodology.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Lewis, P. Rich picture building in the soft systems methodology. Eur J Inf Syst 1, 351–360 (1992). https://doi.org/10.1057/ejis.1992.7

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1057/ejis.1992.7

Navigation