Skip to main content
Log in

Technical Procedures for CDM Project Design

  • Published:
Mitigation and Adaptation Strategies for Global Change Aims and scope Submit manuscript

Abstract

The success of CDM depends on active participation of public and private entities. In particular, participation of wide range of private companies is an important factor for the success. In order to promote the participation of private companies in the CDM project activities as project participants, the authors clarify the steps and technical issues involved in the CDM project design procedures in a step-by-step approach. The steps consist of outlining the project plans, identifying project impacts, defining a project boundary, estimating GHG emissions reduction/enhancement of removals, documenting the results of estimation, and designing of monitoring plans. The authors also propose guidance for project participants, especially for those not familiar with the CDM, which provides plain explanation of major technical issues. In order to further develop a complete guideline, it is necessary to integrate the outputs of the ongoing international initiatives concerning technical issues of CDM into the stepwise approach proposed in this paper.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • GHG Protocol Initiative: 2002, RevisionWorking Group: Evaluation of the 1st Edition of the Corporate Accounting Standard, London meeting - Draft revised chapters and outlines of new chapters, Washington, D.C., GHG Protocol, pp. 39.

    Google Scholar 

  • Jepma, Catrinus J.: 2002, Procedures for Accounting and Baselines for JI and CDM projects, presentation in the Special Event of SB 16, Standardizing Procedures for Joint Implementation and Clean Development Mechanism baselines and accounting, Paterswolde, PROBASE, pp. 15.

    Google Scholar 

  • Ministry of Economic Affairs of the Netherlands: 2001, Operational Guidelines for Baseline Studies, Validation, Monitoring and Verification of Joint Implementation Projects, Volume 2a: Baseline Studies, Monitoring and Reporting, A guide for project developers, Version 2.0, Amsterdam, pp. 33.

  • Ministry of Housing, Spatial Planning and the Environment of the Netherlands: 2001a, Operational Guidelines for Baseline Studies, Validation, Monitoring and Verification of Clean Development Mechanism Project Activities, Volume 2a: Baseline Studies, Monitoring and Reporting, A guide for project developers, Version 1.0, Amsterdam, pp. 31.

  • Ministry of Housing, Spatial Planning and the Environment of the Netherlands: 2001a, Standardised Baselines and Streamlined Monitoring Procedures for Selected Small-scale Clean Development Mechanism Project Activities, Volume 2c: Baseline studies for small-scale project categories, A guide for project developers, Version 1.0, Amsterdam, pp. 33.

  • OECD/IEA: 2002, Practical Baseline Recommendations for Greenhouse Gas Mitigation Projects in the Electric Power Sector, in OECD and IEA Information Paper, Paris, pp. 63.

  • PCF: 2000, Baseline Study for the Greenhouse Gas Component of the Liepaja Regional Solid Waste Management Project, New York, Prototype Carbon Fund, the World Bank, pp. 38.

    Google Scholar 

  • PCF: 2001a, Baseline Study, Chile: Chacabuquito 26 MW Run-of-River Hydro Project, New York, Prototype Carbon Fund, the World Bank, pp. 28.

    Google Scholar 

  • PCF: 2001b, Baseline Study, Uganda: West Nile Hydropower Project, New York, Prototype Carbon Fund, the World Bank, pp. 67.

    Google Scholar 

  • UNFCCC: 2003a, Appendix A to the Simplified Modalities and Procedures for Small-Scale CDM Project Activities, Bonn, Annex 5 in The Report of the Seventh Meeting of the Executive Board, pp. 14.

  • UNFCCC: 2003b, Indicative Simplified Baseline and Monitoring Methodologies for Selected Small-Scale CDM Project Activity Categories, Bonn, Annex 6 in The Report of the Seventh Meeting of the Executive Board, pp. 20.

  • UNFCCC: 2003c, Further Clarifications on Methodological Issues, Bonn, EB 09 Report Annex 3, pp. 2.

  • Working Group on Baseline for CDM/JI Project 2001, Technical Procedures for CDM/JI Projects at the Planning Stage, Interim Report to Ministry of the Environment, Government of Japan, Tokyo, Ministry of the Environment, pp. 70.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Yamada, K., Fujimori, M. Technical Procedures for CDM Project Design. Mitigation and Adaptation Strategies for Global Change 8, 221–235 (2003). https://doi.org/10.1023/B:MITI.0000005640.48177.cd

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1023/B:MITI.0000005640.48177.cd

Navigation