Multiple Lotsizing in Production to Order with Random Yields: Review of Recent Advances

  • Published:
Annals of Operations Research Aims and scope Submit manuscript

Abstract

This article provides a review of models, analytical results and insights pertaining to multiple lotsizing in production to order, with emphasis on recent work on multistage systems and inspection issues. The basic setting consists of an order of fixed size that has to be met in its entirety. Production is in lots and is imperfect, and inspection can take place only when lot has completed a stage. Processing each lot at each stage entails fixed and variable costs. The tradeoff is between running large lots, entailing potentially costly overproduction, and small lots, which may necessitate multiple production runs and their associated setups. Variations of this problem have been explored since the 1950's, but only recently has there been significant progress in solving exactly problems of realistic complexity. We first review single-stage models, including those which compute the variance of costs, those dealing with inspections, those with multiple grades and situations with uncertain demand. We then review multi-stage systems, starting with those with no bottlenecks, and progressing to one, and two bottlenecks. The implications of rework capability in the various systems are then explored.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Anily, S. (1993). “Single Machine Lot Sizing with Uniform Yields and Rigid Demands: Robustness of the Optimal Solution.” IIE Transactions 27, 625–633.

    Google Scholar 

  • Anily, S., A. Beja, and A. Mendel. (2000). “Optimal Lot Sizes with Geometric Production Yield and Rigid Demand.” Operations Research, to appear.

  • Barad, M. and D. Braha. (1996). “Control Limits for Multi-Stage Manufacturing Processes with Binomial Yield: Single an Multiple Production Runs.” Journal of the Operational Research Society 47, 98–112.

    Google Scholar 

  • Beja, A. (1977). “Optimal Reject Allowance with Constant Marginal Production Efficiency.” Naval Research Logistics Quarterly 24, 21–33.

    Google Scholar 

  • Bowman, E.H. (1955). “Using Statistical Tools to Set a Reject Allowance.” NACA Bulletin 36, 1334–1342.

    Google Scholar 

  • Bowman, E.H. and R.B. Fetter. (1961). Analysis for Production Management. Homewood, IL: Irwin.

    Google Scholar 

  • Eeckhoudt, L., C. Gollier, and H. Schlesinger. (1995). “The Risk-Averse (and Prudent) Newsboy.” Management Science 41, 786–794.

    Google Scholar 

  • Gerchak, Y. and A. Grosfeld-Nir. (1998). “Multiple Lotsizing and Value of Probabilistic Information in Production to Order of an Uncertain Size.” International Journal of Production Economics 56-57, 191–197.

    Google Scholar 

  • Gerchak, Y. and A. Grosfeld-Nir. (1999). “Lot Sizing in Production-to-Order with Random Funtionality Yields.” International Journal of Flexible Manufacturing Systems 11, 371–377.

    Google Scholar 

  • Gomez-Corral, A. (1999). “Stochastic Analysis of a Single Server Retrial Queue with General Retrial Times.” Naval Research Logistics 46, 561–581.

    Google Scholar 

  • Goode, H.P. and S. Saltzman. (1961). “Computing Optimum Shrinkage Allowance of Small Order Sizes.” Journal of Industrial Engineering 12, 57–61.

    Google Scholar 

  • Grosfeld-Nir, A. (1995). “Single Bottleneck Systems with Proportional Expected Yields and Rigid Demand.” European Journal of Operational Research 80, 297–307.

    Google Scholar 

  • Grosfeld-Nir, A. (2001). “A Two-Bottleneck System with Binomial Yields and Rigid Demand.” Working Paper, Tel-Aviv University.

  • Grosfeld-Nir, A. and Y. Gerchak. (1990). “Multiple Lotsizing with Random Common-Cause Yield and Rigid Demand.” Operations Research Letters 9, 383–388.

    Google Scholar 

  • Grosfeld-Nir, A. and Y. Gerchak. (1996). “Production to Order with Random Yields: Single-Stage Multiple Lotsizing.” IIE Transactions 28, 669–676.

    Google Scholar 

  • Grosfeld-Nir, A. and Y. Gerchak. (2002). “Multistage Production to Order with Rework Capability.” Management Science 48(5), 652–664.

    Google Scholar 

  • Grosfeld-Nir, A., Y. Gerchak, and Q.-M. He. (2000). “Manufacturing to Order with Random Yield and Costly Inspection.” Operations Research 48(5), 761–767.

    Google Scholar 

  • Grosfeld-Nir, A. and L.W. Robinson. (1995). “Production to Order on a Two Machine Line with Random Yields, and Rigid Demand.” European Journal of Operational Research 80, 264–276.

    Google Scholar 

  • Grosfeld-Nir, A. and B. Ronen. (1993). “A Single Bottleneck System with Binomial Yield and Rigid Demand.” Management Science 39, 650–653.

    Google Scholar 

  • Guu S.-M. and A.X. Zhang. (2001). “The Finite Multiple Lot Sizing Problem with Interrupted Geometric Yield and Holding Costs.” Forthcoming in the European Journal of Operational Research.

  • He, Q-M., Y. Gerchak, and A. Grosfeld-Nir. (1996). “Optimal Inspection Order when Process' Failure Rate Is Constant.” International Journal of Reliability, Quality and Safety 3, 25–41.

    Google Scholar 

  • Henig, M. and Y. Gerchak. (1990). “The Structure of Periodic Review Policies in the Presence of Random Yield.” Operations Research 38, 634–643.

    Google Scholar 

  • Hillier, F.S. (1963). “Reject Allowance for Job Lot Orders.” Journal of Industrial Engineering 14, 311–316.

    Google Scholar 

  • Lee, H.-L. and C.A. Yano. (1988). “Production Control in Multistage Systems with Variable Yield Losses.” Operations Research 36, 269–278.

    Google Scholar 

  • Llewellyn, R.W. (1959). “Order Sizes of Job Lot Manufacturing.” Journal of Industrial Engineering 10, 176–180.

    Google Scholar 

  • Nandakumar, P. and J.L. Rummel. (1998). “A Subassembly Manufacturing Yield Problem with Multiple Production Runs.” Operations Research 46, 550–564.

    Google Scholar 

  • Pentico, D.W. (1988). “An Evaluation and Proposed Modification of the Sepheri-Silver-New Heuristic for Multiple Lot Sizing under Variable Yield.” IIE Transactions 20, 360–363.

    Google Scholar 

  • Pentico, D.W. (1994). “Multistage Production Systems with Random Yield: Heuristics and Optimality.” International Journal of Production Research 32, 2455–2462.

    Google Scholar 

  • Porteus, E.L. (1986). “Optimal Lotsizing, Process Quality Improvement and Setup Cost Reduction.” Operations Research 34, 137–144.

    Google Scholar 

  • Porteus, E.L. (1990). “The Impact of Inspection Delay on Process and Inspection Lotsizing.” Management Science 36, 999–1007.

    Google Scholar 

  • Sepheri, M., E.A. Silver, and C. New. (1986). “A Heuristic for Multiple Lotsizing for an Order under Variable Yield.” IIE Transactions 18, 63–69.

    Google Scholar 

  • Vachani, M. (1970). “Determining Optimum Reject Allowances for Multistage Job-Lot Manufacturing.” IIE Transactions 2, 70–77.

    Google Scholar 

  • Wadsworth, H.M. and S.H. Chang. (1964). “The Reject-Allowance Problem: An Analysis and Application to Job Lot Production.” Journal of Industrial Engineering 15, 127–132.

    Google Scholar 

  • Wang, Y. and Y. Gerchak. (2000). “Input Control in a Batch Production System with Random Yields, Lead Times and Due Dates.” European Journal of Operational Research 126, 371–385.

    Google Scholar 

  • Wein, A.S. (1992). “Random Yield, Rework and Scrap in Multi-Stage Batch Manufacturing Environments.” Operations Research 40, 551–563.

    Google Scholar 

  • White, D.J. (1965). “Dynamic Programming and Systems of Uncertain Duration.” Management Science 12, 37–67.

    Google Scholar 

  • Yano, C.A. and H.L. Lee. (1995). “Lot Sizing and Random Yields: A Review.” Operations Research 43, 311–334.

    Google Scholar 

  • Zhang, A.X. and S.-M. Guu. (1998). “The Multiple Lot Sizing Problem with Rigid Demand and Interrupted Geometric Yield.” IIE Transactions 30, 427–431.

    Google Scholar 

  • Zipkin, P.H. (2000). Foundations of Inventory Management. Irwin/McGraw-Hill.

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Yigal Gerchak.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Grosfeld-Nir, A., Gerchak, Y. Multiple Lotsizing in Production to Order with Random Yields: Review of Recent Advances. Annals of Operations Research 126, 43–69 (2004). https://doi.org/10.1023/B:ANOR.0000012275.01260.f5

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1023/B:ANOR.0000012275.01260.f5

Navigation