Abstract
The long-term planning problem for integrated gas field development is investigated. The key decisions involve both design of the production and transportation network structure and operation of the gas fields over time. A novel continuous-time modeling and optimization approach is proposed, which introduces the concept of event points and allows the well platforms to come online at potentially any time within the continuous horizon under consideration. A two-level formulation and solution framework is developed to take into account complicated economic calculations and results in mixed-integer nonlinear programming (MINLP) problems. As compared with the discrete-time model, the proposed approach leads to more compact mathematical models and significant reduction of the size of the resulting MINLP problems. Even though, the proposed approach in its current form cannot guarantee convergence to the optimal solution, computational results show that this approach can reduce the computational efforts required substantially and solve problems that are intractable for the discrete-time model.
Similar content being viewed by others
References
A. Brooke, D. Kendrick, and A. Meeraus, GAMS: A User's Guide, South San Francisco, CA, 1988.
C. A. Floudas, Nonlinear and Mixed-Integer Optimization, Oxford University Press, 1995.
C. A. Floudas, Deterministic Global Optimization: Theory, Methods and Applications, Kluwer Academic Publishers, 2000.
GAMS Development Corporation, GAMS–The Solver Manuals, 1999.
D. Haugland, A. Hallefjord, and H. Asheim, “Models for petroleum field exploitation, ” Eur. J. Oper. Res. vol. 37, pp. 58–72, 1988.
M. G. Ierapetritou and C. A. Floudas, “Effective continuous-time formulation for short-term scheduling: 1. multipurpose batch processes, ” Ind. Eng. Chem. Res. vol. 37, pp. 4341–4359, 1998a.
M. G. Ierapetritou and C. A. Floudas, “Effective continuous-time formulation for short-term scheduling: 2. continuous and semi-continuous processes, ” Ind. Eng. Chem. Res. vol. 37, pp. 4360–4374, 1998b.
M. G. Ierapetritou, T. S. Hené, and C. A. Floudas, “Effective continuous-time formulation for short-term scheduling: 3. multiple intermediate due dates, ” Ind. Eng. Chem. Res. vol. 38, pp. 3446–3461, 1999.
R. R. Iyer, I. E. Grossmann, S. Vasantharajan, and A. S. Cullick, “Optimal planning and scheduling of offshore oil field infrastructure investment and operations, ” Ind. Eng. Chem. Res. vol. 37, pp. 1380–1397, 1998.
S. A. van den Heever and I. E. Grossmann, “An iterative aggregation/disaggregation approach for the solution of a mixed-integer nonlinear oilfield infrastructure planning model, ” Ind. Eng. Chem. Res. vol. 39, pp. 1955–1971, 2000.
S. A. van den Heever, I. E. Grossmann, S. Vasantharajan, and K. Edwards, “Integrating complex economic objectives with the design and planning of offshore oilfield infrastructures, ” Comp. Chem. Engng. vol. 24, pp. 1049–1055, 2000.
S. A. van den Heever, I. E. Grossmann, S. Vasantharajan, and K. Edwards, “A lagrangean decomposition heuristic for the design and planning of offshore hydrocarbon field infrastructures with complex economic objectives, ” Ind. Eng. Chem. Res. vol. 40, pp. 2857–2875, 2001.
J. Viswanathan and I. E. Grossmann, “A combined penalty function and outer approximation method for minlp optimization, ” Comp. Chem. Engng. vol. 14, pp. 769–782, 1990.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Lin, X., Floudas, C.A. A Novel Continuous-Time Modeling and Optimization Framework for Well Platform Planning Problems. Optimization and Engineering 4, 65–95 (2003). https://doi.org/10.1023/A:1021860330145
Issue Date:
DOI: https://doi.org/10.1023/A:1021860330145