Skip to main content
Log in

Staff rostering at a large international airport

  • Published:
Annals of Operations Research Aims and scope Submit manuscript

Abstract

The human resource planning and scheduling system described in this paper assists in the rostering of approximately 500 staff for the airport operations of a major international airline at one of the busiest international airports. The system rosters airline ground staff over a monthly planning horizon so that the work load is evenly distributed among the staff and idle time, the main productivity measure, is minimised. The rosters are subject to a large number of rules designed to ensure reasonable working conditions and service stand-ards. The system then allocates individual tasks to the staff for any particular day, and effectively manages, in real-time, disruptions that occur due to aircraft delays and unplanned staff absences on the day of operations. The system is also designed to reduce the number of staff needed to run the present rostering system. In this paper, we provide a description of the overall system and an algorithm for solving the rostering problem associated with the system.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. R. Anbil, E. Gelman, B. Patty and R. Tanga, Recent advances in crew-pairing optimization at American Airlines, Interfaces 21(1991)62–74.

    Google Scholar 

  2. M. Arkin and B. Silverberg, Scheduling jobs with fixed start and end times, Discrete Applied Mathematics 18(1987)

  3. K.R. Baker, Workforce allocation in cyclical scheduling problems: A survey, Operations Research Quarterly 27(1976)155–167.

    Google Scholar 

  4. C. Barnhart, E.L. Johnson, R. Anbil and L. Hatay, A column generation technique for the long-haul crew assignment problem, Technical Report COC-91-01, School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta, GA 30332, 1991.

    Google Scholar 

  5. S.E. Bechtold, M.J. Brusco and M.J. Showalter, A comparative evaluation of labor tour scheduling methods, Decision Science 22(1991)683–699

    Google Scholar 

  6. M.J. Brusco, L.W. Jacobs, R.J. Bongiorno, D.V. Loyns and B. Tang, Improving personnel scheduling at airline stations, Operations Research 43(1995)741–751.

    Google Scholar 

  7. N.E. Collins, R.W. Eglese and B.L. Golden, Simulated annealing: An annotated bibliography, American Journal of Mathematical and Management Sciences 8(1988)209–307.

    Google Scholar 

  8. D. Dowling, TMS simulated annealing explained, Technical Report 13-7-92, The Preston Group 488, Victoria Street, Richmond, VIC 3121, Australia, 1992.

    Google Scholar 

  9. M.A. Ellis and B. Stroustrup, A C++ Reference Manual, Addison-Wesley, New York, 1990.

    Google Scholar 

  10. A. Ernst, M. Krishnamoorthy and D. Dowling, Train driver rostering using simulated annealing, Technical Report, CSIRO Mathematical and Information Sciences, Private Bag 10, Clayton South MDC, Clayton, VIC 3169, Australia, 1992.

    Google Scholar 

  11. M. Fischetti, S. Martello and P. Toth, The fixed job schedule problem with spread-time constraints, Operations Research 35(1987)849–858.

    Google Scholar 

  12. M. Fischetti, S. Martello and P. Toth, The fixed job schedule problem with working-time constraints, Operations Research 37(1989)395–403.

    Google Scholar 

  13. M. Fischetti, S. Martello and P. Toth, Approximation algorithms for fixed job schedule problems, Operations Research 40(1992)S96–S108.

    Google Scholar 

  14. E. Gamma, R. Helm, R. Johnson and J. Vlissides, Design Patterns: Elements of Reusable Object-Oriented Software, Addison-Wesley, New York, 1995.

    Google Scholar 

  15. I. Gershkoff, Optimizing flight crew schedules, Interfaces 19(1989)29–43.

    Google Scholar 

  16. W.B. Henderson and W.L. Berry, Heuristic methods for telephone operator shifting scheduling: An experimental analysis, Management Science 22(1976)1372–1380.

    Google Scholar 

  17. K.L. Hoffman and M. Padberg, Solving airline crew scheduling problems by branch-and-cut, Management Science 39(1993)657–782.

    Google Scholar 

  18. T.J. Holloran and J.E. Byrn, United Airlines station manpower planning system, Interfaces 16 (1986)39–50.

    Google Scholar 

  19. M. Krishnamoorthy, A. Ernst and J. E. Beasley, Formulations and algorithms for the personnel task scheduling problem, Technical Report, CSIRO Mathematical and Information Sciences, Private Bag 10, Clayton South MDC, Clayton, VIC 3169, Australia, 1997.

    Google Scholar 

  20. H. Koutsopoulos and N. Wilson, Operator workforce planning in the transit industry, Transportation Research 21A(1987)127–138.

    Google Scholar 

  21. J.G. Morris and M.J. Showalter, Simple approaches to shift, days-off and tour scheduling, Management Science 29(1983)942–950.

    Google Scholar 

  22. I.H. Osman and G. Laporte, Metaheuristics: A bibliography, Annals of Operations Research 63 (1996)513–623.

    Google Scholar 

  23. C.C. Ribeiro, M. Minoux and M.C. Penna, On optimal column-generation-with-ranking algorithm for very large scale set partitioning problems in traffic assignment, European Journal of Operational Research 41(1989)232–239.

    Google Scholar 

  24. S. Schindler and T. Semmel, Station staffing at Pan American World Airways, Interfaces 23(1993) 91–98.

    Google Scholar 

  25. J. Siegel (ed.), CORBA Fundamentals and Programming, Wiley, New York, 1996.

    Google Scholar 

  26. H.I. Stern and M. Hersh, Scheduling aircraft cleaning crews, Transportation Science 14(1980)277–291.

    Google Scholar 

  27. V. Valls, A. Pérez and S. Quintanilla, A graph colouring model for assigning a heterogenous workforce to a given schedule, European Journal of Operational Research 90(1996)285–302.

    Google Scholar 

  28. P.H. Vance, C. Barnhart, E.L. Johnson and G.L. Nemhauser, Airline crew scheduling, Technical Report COC-94-07, School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta, GA 30332, 1994.

    Google Scholar 

  29. S.R. White, Concepts of scale in simulated annealing, Proceedings IEEE International Conference on Computer Design, November 1984, pp 646–651.

  30. D.A. Young, Object Oriented Programming with C++ and OSF/Motif, Prentice-Hall, New Jersey, 1995.

    Google Scholar 

  31. D.A. Young, The X Window System: Programming and Applications with X, OSF/Motif, Prentice-Hall, New Jersey, 1994.

    Google Scholar 

Download references

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Dowling, D., Krishnamoorthy, M., Mackenzie, H. et al. Staff rostering at a large international airport. Annals of Operations Research 72, 125–147 (1997). https://doi.org/10.1023/A:1018992120116

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1023/A:1018992120116

Navigation