The Galileo Italian National Telescope and its Instrumentation

  • Published:
Experimental Astronomy Aims and scope Submit manuscript

Abstract

The main features of the 3.5m Telescopio Nazionale GALILEO (TNG) have been derived from those of the ESO NTT, although with modifications in several areas, as described e.g. in Barbieri et al., 1994. The site of the TNG is the Observatorio del Roque de los Muchachos, in the Canary Island of La Palma. Construction activities, started in 1993, are nearing completion. The telescope structure, after testing in the Ansaldo factory near Milano, has been disassembled and is gradually being transported and installed on site, in parallel with the rotating dome. The three main mirrors, figured by ZEISS, will be transported in spring '96 to the WHT plant at the Roque for aluminisation before installation on the telescope.

Three major subsystems still undergo intensive activity in Italy, namely testing of the M2 and M3 units, testing of the operational version of the control hardware and software, and construction of the two Rotator Adapters (R/A) for the Nasmyth foci.

First light instruments are also being built. Nasmyth Arm A is reserved for the imaging section, composed by a visual camera, a near-IR camera, plus a common adaptive optics module. On arm B, a faint object spectrograph with long slit, atmospheric dispersion corrector, multiobject and imaging capabilities, will be mounted. A fixed high resolution spectrograph with optical derotation is also being designed.

Attention has already been given to the archive of the data.

It is planned to have first light at the end of 1996, and to start regular scientific operations after an adequate period of debugging and commissioning.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Asili, S., Banni, A., Falchi, E., Porceddu, I., Sanna, G. 1995, Preliminary Report about the first accurate determination of TNG's UTM and astronomical positions, TNG Newsletter no. 11

  2. Balestra, A., Marcucci, P., Pasian, F., Pucillo, M., Smareglia, R., Vuerli, C. 1991, GALILEO Project Workstation Software System, TNG Tech. Report no. 9

  3. Barbieri et al. 1994, Status of the Galileo National Telescope, SPIE 2199, 10

    Google Scholar 

  4. Bevini, F. 1995, TNG Elastic Qualification Measurement, TNG Newsletter no. 11

  5. Bhatia, R., Ciani, A. 1992, The Portable Wavefront Analyzer: ANTARES, TNG Newsletter No.2

  6. Bhatia, R., Ciani, A., Rafanelli, P. 1993, Results from the Shack-Hartmann Analysis of the 3.5m primary mirror of the GALILEO Telescope, SPIE vol. 94, pag. 68

    Google Scholar 

  7. Bonoli, C., Fantinel, D., Baruffolo, A., Bortoletto, F. 1992, A distributed VME telescope control system for remote operations, TNG Tech. Report no. 14

  8. Bonoli, C., Mancini, D., Bortoletto, F., Corcione, L., D'Alessandro, M., Schipani, P., Stefani, R. 1995, “TNG Control System: Computer architecture, interfacing and synchronization”, SPIE 2479, 160.

    Google Scholar 

  9. Bortoletto et al., 1993, Testing Active Optics for the National Telescope Galileo, ICO-16 conf., ESO proc. 48, 439

    Google Scholar 

  10. Bortoletto, F., et al. 1994, Active Optics handling inside Galileo telescope, SPIE 2199, 212

    Google Scholar 

  11. CCI (Comite Cientifico International) Report for year 1994, pag....

  12. Conconi, P., Bevini, F. 1994, Mcchanical Alignement of the TNG, TNG Newsletter no. 7

  13. Conconi, P. 1994, TNG Instrument Plan, Second Edition

  14. diSerego Alighieri, S. 1995, in “Calibrating and Understanding HST and ESO Instruments”, P. Benvenuti & B. Sjoeberg, ESO Conference and Workshop Proceedings, in press

  15. Favaron, P., Bevini, F. 1995, The Rotating System of the TNG Building, TNG Newsletter no. 11

  16. Fusi-Pecci, F., Stirpe, G. 1994, TNG Instrument Plan, Second Edition

  17. Knohl, E.D., Schmidt, M. 1992, Galileo Optic Glances for final tests, in ”From Galileo Occhialino to Optoelectronic”, P. Mazzoldi ed., World Sci. Pub. Co.

  18. Mancini, D., Mancini, G., Ortolani, S., Zitelli, V. 1993, The Seeing Monitor Tower, TNG Tech. Report no. 28

  19. Mancini, D. 1993, The Galileo Telescope Power system, Tech. Report no. 22

  20. Mancini, D., Bevini, F. 1995, The Mechanical assembling of the TNG Az/El encoders, TNG Newsletter No. 10

  21. Marchetti, E., Ragazzoni, R., A wavefront generator for adaptive optics testing, OSA Conf. on Adaptive Optics, October 1995

  22. Porceddu, I., Mancini, D., Ortolani, S., Zitelli, V. 1994, Astronomy and Meteorology I, TNG Newletter no. 8

  23. Porceddu, I., 1995, Astronomy and Meteorology II, TNG Newsletter no. 9

  24. Ragazzoni R., 1994, A K Measurement of the TNG Primary Mirror, TNG Newsletter no. 8

  25. Zambon, M. 1992, The TNG Building, TNG Newsletter no. 2

  26. Zambon, M. 1995, Tender for the TNG Rotating Building, TNG Newsletter no. 10

  27. Wallace, P.T.. 1994, Proposal for Keck Telescope Pointing Algorithms

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Barbieri, C. The Galileo Italian National Telescope and its Instrumentation. Experimental Astronomy 7, 257–279 (1997). https://doi.org/10.1023/A:1007920800245

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1023/A:1007920800245

Keywords

Navigation