Abstract
The purpose of this study is to present a new model, based on a systemic approach, to analyze the different relationships that may exist between the risk, its management and the performance of the construction companies. Moreover, the process approach used is based first on the classification of different risks in building sector, which are then transferred to the process defined by four main activities of risk management system (RMS), namely identification, analysis, assessment and treatment of risks. In addition, external and internal functional analyses of the RMS using the application of business techniques called APTE method were conducted to describe the process that will link the types of risks to the performance of building companies. The latter is measured according to four perspectives: financial, customers, internal business process, and learning and growth. Hypotheses put in place will be tested, empirically, using a questionnaire to be distributed to customers of our system, the CEO and employees of the construction companies. Finally, the proposed model will provide a new vision on the implementation of RM in Algerian construction companies to manage risks, not only to seize the profit but also to remain competitive and survive in an increasingly dynamic world.
Similar content being viewed by others
References
Abdou OA (1996) Managing construction risks. J Archit Eng 2(1):3–10. https://doi.org/10.1061/(ASCE)1076-0431(1996)2:1(3)
Ahmed A, Kayis B, Amornsawadwatana S (2007) A review of techniques for risk management in projects. Benchmark Int J 14(1):22–36. https://doi.org/10.1108/14635770710730919
Ahmed Zaid M, Chertouk Z (2011) Contribution performance financière et performance sociale dans les entreprises publiques algériennes. Universidad polytecnica de Valencia, pp 1–15
Akintoye AS, MacLeod MJ (1997) Risk analysis and management in construction. Int J Proj Manag 15(1):31–38. https://doi.org/10.1016/S0263-7863(96)00035-X
Amit E, Dutta B, Kolhatkar MJ (2014) Study of risk management in construction projects. Int J Manag 5(6):976–6502
Angappa G, Zahir I, King-Lun C, Lionel F, Thanos P (2015) Performance measures and metrics in outsourcing decisions: a review for research and applications. Int J Prod Econ 161(0925–5273):153–166
Antonio B, Gaudenzi B (2013) Risk management. Events Manag. https://doi.org/10.1007/978-88-470-2531-8
Assaf SA, Al-Hejji S (2006) Causes of delay in large construction projects. Int J Proj Manag 24(4):349–357
Baaziz A, Khelil M (2006) Balanced scorecard et Pilotage de la performance : Cas de la Division Forage. In: Journées Scientifiques et Techniques de Sonatrach JST’7, p 11
Bassioni, Price, Hassan (2005) Building a conceptual framework for measuring business performance in construction: an empirical evaluation. Constr Manag Econ 23(5):495–507
Berkeley D, Humphreys PC, Thomas RD (1991) Project risk action management. Constr Manag Econ 9(1):3–17. https://doi.org/10.1080/01446199100000002
Breysse D, Chaplain M, Jabbour PF (2009) Identification des risques pour les projets de construction: revue des pratiques internationales et propositions Abstract: 19ème Congrès Français de Mécanique, pp 1–10
Chan Toong K (2009) Measuring performance of the Malaysian construction industry. Constr Manag Econ 27:1231–1244. https://doi.org/10.1080/01446190903233137
Chapman RJ (2001) The controlling influences on effective risk identification and assessment for construction design management. Int Proj Manag 19:147–160
Chen LE (2007) Linking knowledge management to organisational business performance in construction. Griffith University Gold Coast Campus, Southport
Cooper DF, Stephen G, Geoffrey R, Phil Walker Gopal M (2005) Project risk management guidelines. Wiley, New York. https://doi.org/10.1016/j.patrec.2005.01.006
Dwight R (1999) Searching for real maintenance performance measures. J Qual Maint Eng 5(3):258–275. https://doi.org/10.1108/13552519910282728
Farina L, Danesi E, Travaglini A, Mancini M, Trucco P (2018) Integration of constructability and project risk management. Manag Ind Eng. https://doi.org/10.1007/978-3-319-58409-6
Flanagan R, Norman G (1993) Risk management and construction. Blackwell, Oxford
Gajewska E, Ropel M (2011) Risk management practices in a construction project—a case study. Publ Libr Chalmers Univ Technol. https://doi.org/10.2469/cp.v1999.n3.2
Gamil Y, Rahman AI (2017) Identification of causes and effects of poor communication in construction industry: a theoretical review. Emerg Sci J 1(4):239–247. https://doi.org/10.28991/ijse-01121
Grüning M (2002) Performance-measurement-systeme—Messung und Steuerung von Unternehmensleistung (illustrée). Dissertation. Springer, Berlin
Hamzaoui F (2015) Management des risques dans la construction dans l’environnement algérien : Intégration de la méthodologie RBS dans l’approche par le REX. Aboubekr Belkaid, Tlemcen
ISO/CEI Guide 73 (2009) Management du risque—Vocabulaire
Ittner CD, Larcker DF (1998) Are nonfinancial measures leading indicators of financial performance? An analysis of customer satisfaction. J Acc Res 36:36
Jafari M, Chadegani AA, Biglari V (2011) Effective risk management and company’s performance: investment in innovations and intellectual capital using behavioral and practical approach. J Econ Int Financ 3(15):780–786. https://doi.org/10.5897/JEIF11.123
Kagioglou M, Cooper R, Aouad G (2001) Performance management in construction: a conceptual framework. Constr Manag Econ 19(1):85–95
Kaplan RS, Norton DP (1996) The balanced scorecard: translating strategy into action. Harvard Business School Press
Kherbouche A, Megnounif A (2016) A new model for the impact of knowledge management on university performance. J Inf Knowl Manag 15(4):29. https://doi.org/10.1142/S0219649216500416
Kopecká N (2018) A literature review of financial performance measures and value relevance. Springer Proc Bus Econ. https://doi.org/10.1007/978-3-319-68762-9_42
Kot S, Dragon P (2015) Business risk management in international corporations. Procedia Econ Financ 27(15):102–108. https://doi.org/10.1016/S2212-5671(15)00978-8
Lehtiranta L (2011) Relational risk management in construction projects: modeling the complexity. Leadersh Manag Eng 11(2):141–154. https://doi.org/10.1061/(ASCE)LM.1943-5630.0000114
Lichtenstein S (1996) Factors in the selection of a risk assessment method. Inf Manag Comput Secur 4(4):20–25. https://doi.org/10.1108/09685229610130503
Lingle J, Schiemann WA (1996) From balanced scorecard to strategic gauges: is measurement worth it? Am Manag Assoc Manag Rev 85(3):56–61
Liu J, Li B, Lin B, Nguyen V (2007) Key issues and challenges of risk management and insurance in China’s construction industry. Ind Manag Data Syst 107(3):382–396. https://doi.org/10.1108/02635570710734280
Lmoussaoui H, Jamouli H (2015) A new method for Project risk identification: case study of a real construction project. Int J Enhanc Res Manag Comput Appl 4(1):17–22
Lyons T, Skitmore M (2004) Project risk management in the Queensland Engineering Construction Industry: a survey. Int J Proj Manag 22(1):51–61
Mazouni M (2008) Thèse Pour une Meilleure Approche du Management des Risques, Nancy
Megnounif A, Kara Zaitri D (2010) Résumé. In: L’approche systémique et l’analyse des risques. Cas des systèmes hydrauliques de la wilaya de Tlemcen, p 10
Mehdizadeh R (2012) Dynamic and multi-perspective risk management of construction projects using tailor-made Risk Breakdown Structures. PhD Thesis. Université Bordeaux 1
Mohammed HK, Knapkova A (2016) The impact of total risk management on company’s performance. Proc Soc Behav Sci 220:271–277. https://doi.org/10.1016/j.sbspro.2016.05.499
Neely A, Gregory M, Platts K (2005) Performance measurement system design: a literature review and research agenda. Int J Oper Prod Manag 25(12):1228–1263. https://doi.org/10.1108/01443570510633639
NF ISO 31000 (2010) Management du risque Principes et lignes directrices, p 33
Nieto-Morote A, Ruz-Vila F (2011) A fuzzy approach to construction project risk assessment. Int J Proj Manag 29(2):220–231. https://doi.org/10.1016/j.ijproman.2010.02.002
Nnadi EOE, Enebe EC, Ugwu OO (2018) Evaluating the awareness level of risk management amongst construction stakeholders in Nigeria. Int J Constr Eng Manag 7(1):47–52. https://doi.org/10.5923/j.ijcem.20180701.05
Nudurupati S, Arshad T, Turner T (2007) Performance measurement in the construction industry: an action case investigating manufacturing methodologies. Comput Ind 58(2007):667–676. https://doi.org/10.1016/j.compind.2007.05.005
Pagach D, Warr R (2011) The characteristics of firms that hire chief risk officers. J Risk Insur 78(1):185–211. https://doi.org/10.2307/23019543
Perry J, Hayes R (1985) Risk and its management in construction projects. Proc Inst Civ Eng 78(3):499–521. https://doi.org/10.1680/iicep.1985.859
Potts K (2008) Construction cost management: learning from case studies. Taylor and Francis, Abington
Project Management Institute (2008) Guide Du Corpus Des Connaissances En Management De Projet. www.pmi.org
Rad PF, Levin G (2002) The advanced project management office: a comprehensive look at function and implementation. CRC Press, Boca Raton
Renaud A, Berland N (2007) Mesure de la performance globale des entreprises. 28Ème Congrès, pp 1–23
Renuka SM, Umarani C, Kamal S (2014) A review on critical risk factors in the life cycle of construction projects. J Civ Eng Res 4(2A):31–36. https://doi.org/10.5923/c.jce.201401.07
Rezakhani P (2012) Classifying key risk factors in construction. Buletinul Institutului Politehnic Din Iaşi 2(LXII):12
Rolstadas A (1998) Enterprise performance measurement. Int J Oper Prod Manag 18(9/10):989–999. https://doi.org/10.1108/01443579810225577
El Sayegh SM (2014) Project risk management practices in the UAE construction industry. Int J Proj Organ Manag 6(1/2):121. https://doi.org/10.1504/IJPOM.2014.059748
Serpell A, Ferrada X, Rubio L, Arauzo S (2015) Evaluating risk management practices in construction organizations. Proc Soc Behav Sci 194:201–210. https://doi.org/10.1016/j.sbspro.2015.06.135
Shen LY, Wu GWC, Ng CSK (2001) Risk assessment for construction joint ventures in China. J Constr Eng Manag 172(1):76–81
Shendage N (2016) A survey on risk assessment and management in construction project. Int J Innov Res Sci Eng Technol 5(12):20927–20932
Sohrabinejad A, Rahimi M (2015) Risk determination, prioritization, and classifying in construction project case study: Gharb Tehran commercial-administrative complex. J Constr Eng 2015:1–10. https://doi.org/10.1155/2015/203468
Sorrill CM, Cooper D, Chapman C (1987) Risk analysis for large projects: models, methods and cases. J Oper Res Soc 38(12):1217. https://doi.org/10.2307/2582754
Tah JHM, Carr V (2000) A proposal for construction project risk assessment using fuzzy logic. Constr Manag Econ 18(4):491–500. https://doi.org/10.1080/01446190050024905
Taillandier F (2009) La notion de risque comme clef du pilotage d’un parc patrimonial immobilier. Université de Savoie. https://tel.archives-ouvertes.fr/tel-00427702
Tam VWY, Shen LY (2012) Risk management for contractors in marine projects. Organ Technol Manag Constr Int J 2007:403–410. https://doi.org/10.5592/otmcj.2012.1.5
Tummala VMR, Burchett JF (1999) Applying a risk management process (RMP) to manage cost risk for an EHV transmission line project. Int J Proj Manag 17:223–235
Violante A, Dominguez C, Paiva A (2018) Risk management in construction projects: Are small companies prepared? MOJ Civ Eng 4(1):1–7. https://doi.org/10.15406/mojce.2018.04.00090
Ward S, Chapman C (2003) Project risk management—processes, techniques and insights. Wiley, Chichester
Wiguna IPA, Scott S (2005) Nature of the critical risk factors affecting project performance in Indonesian building contracts. In: 21st Annual ARCOM conference, 1(September), pp 7–9
Winch GM (2002) Managing construction project, an information processing approach. Blackwell, Oxford
Wysocki RK (2004) Project management process improvement. Artech House, Norwood
Yadav N (2017) Performance management and measurement in HR and payroll. Int J Manag 8(6):76–80
Yang C, Chuang S, Huang R (2009) Expert systems with applications manufacturing evaluation system based on AHP/ANP approach for wafer fabricating industry. Expert Syst Appl 36:11369–11371. https://doi.org/10.1016/j.eswa.2009.03.023
Žaneta Ilmete O, Juris Binde O, Borzovs J, Brūna I, EDorrenberg F, Jerzy Kisielnicki I, Sloka B (2014) Scientific Committee—Editorial Board Project Management Development—practice and perspectives. In: Conference proceedings. Riga
Zeng J, An M, John Smith N (2007) Application of a fuzzy based decision making methodology to construction project risk assessment. Int J Proj Manag 25(6):589–600. https://doi.org/10.1016/j.ijproman.2007.02.006
Zou PXW, Zhang G (2009) Managing risks in construction projects: life cycle and stakeholder perspectives. Int J Constr Manag 9(1):61–77. https://doi.org/10.1080/15623599.2009.10773122
Zulqarnain I (2014) Risk management in civil engineering projects. Research Gate
Author information
Authors and Affiliations
Corresponding author
Ethics declarations
Conflict of interest
The authors declare that they have no conflict of interest.
Rights and permissions
About this article
Cite this article
Baba Ahmed, A.N., Megnounif, A. The impact of risk management on business performance: case of Algerian construction organizations. Innov. Infrastruct. Solut. 5, 102 (2020). https://doi.org/10.1007/s41062-020-00354-3
Received:
Accepted:
Published:
DOI: https://doi.org/10.1007/s41062-020-00354-3