Abstract
On-site construction challenges and the efficient performance of off-site construction methods have led the building industry toward applying different industrial construction methods such as precast concrete construction. Despite the significant capabilities of industrial building construction, the wastes of the off-site production processes are still substantial. Lean techniques are implemented to reduce or eliminate production wastes. However, lean techniques must be selected based on each production system's characteristics to maximize its impact that could be implemented using root cause analysis (RCA). As a result, the current research investigates the impacts of the simultaneous application of the RCA technique and lean techniques on the total time, costs, and idle time of the precast concrete components (PCCs) production processes. To find wastes effectively, the 5 Whys technique is implemented as RCA. Based on the RCA outcomes, 5S and just-in-time (JIT) techniques are implemented as lean techniques (LT) to improve the production stage of PPCs. According to the results, the total time, cost, and idle time of the production processes showed 39%, 33%, and 90% reduction, respectively, which indicates a more significant improvement than using lean techniques individually.
Graphical abstract
Similar content being viewed by others
References
Ahmad S, Soetanto R, Goodier C (2019) Lean approach in precast concrete component production. Built Environ Project Asset Manag 9:457–470
Bajjou MS, Chafi A, En-Nadi A (2017) The potential effectiveness of lean construction tools in promoting safety on construction sites. Int J Eng Res Africa 33:179–193
Bajjou MS, Chafi A, En-Nadi A (2017) A comparative study between lean construction and the traditional production system. Int J Eng Res Africa 29:118–132
Carvajal-Arango D, Bahamón-Jaramillo S, Aristizábal-Monsalve P, Vásquez-Hernández A, Botero LFB (2019) Relationships between lean and sustainable construction: positive impacts of lean practices over sustainability during construction phase. J Clean Prod 234:1322–1337
Cerfolio RJ, Minnich DJ, Wei B, Watson C, DeCamp MM (2017) Achieving a 3-star society of thoracic surgery lobectomy ranking by using continuing process improvement, lean methodology, and root cause analysis. Seminars Thoracic Cardiovasc Surg 29:550–557
Chiarini A (2012) Lean organization: from the tools of the toyota production system to lean office, vol 3. Springer Science and Business Media, Milan
Demirkesen S (2020) Measuring impact of lean implementation on construction safety performance: a structural equation model. Prod Plan Control 31(5):412–433
Deokar A, Aravind Raj S, Jayakrishna K, Abdul H, Zubar. (2019) Implementation of lean concepts using value stream mapping in automotive firm. Advances in manufacturing technology. Springer, Singapore, pp 141–147
Doskočil R, Lacko B (2019) Root Cause analysis in post project phases as application of knowledge management. Sustainability 11(6):1667
Ekanayake EMAC, Shen GQ, Kumaraswamy MM (2021) Identifying supply chain capabilities of construction firms in industrialized construction. Prod Plan Control 32(4):303–321
El Sakka F, Eid K, Narciss T, Hamzeh F (2016) Integrating lean into modular construction: a detailed case study of company X
Ellram LM (1996) The use of the case study method in logistics research. J Bus Logist 17(2):93
Gan X, Chang R, Zuo J, Wen T, Zillante G (2018) Barriers to the transition towards off-site construction in china: an interpretive structural modeling approach. J Clean Prod 197:8–18
Gangidi P (2019) A systematic approach to root cause analysis using 3× 5 why’s technique. Int J Lean Six Sigma. Emerald Publishing Limited
Goh M, Goh YM (2019) Lean production theory-based simulation of modular construction processes. Automat Constr 101:227–244
Harich J, Rosas MK (2019) process-driven problem solving with root cause analysis: adapting powerful business tools to fit the sustainability problem
Heravi G, Firoozi M (2017) Production process improvement of buildings’ prefabricated steel frames using value stream mapping. Int J Adv Manuf Technol 89(9–12):3307–3321
Heravi G, Kebria MF, Rostami M (2019) Integrating the production and the erection processes of pre-fabricated steel frames in building projects using phased lean management. Construction and architectural management. Emerald Publishing Limited, Bingley
Heravi G, Rostami M, Kebria MF (2020) Energy consumption and carbon emission assessment of integrated production and erection of buildings’ pre-fabricated steel frames using lean techniques. J Clean Prod 253:120045
Hines P, Rich N (1997) The seven value stream mapping tools. Int J Oper Prod Manag 17:46–64
Howell G, Ballard G (1998) Implementing lean construction: understanding and action. In: Proc 6th Ann Conf Intl Group for Lean Constr
Hsu P-Y, Aurisicchio M, Angeloudis P (2017) Investigating schedule deviation in construction projects through root cause analysis. Procedia Comput Sci 121:732–739
Innella F, Arashpour M, Bai Y (2019) Lean methodologies and techniques for modular construction: chronological and critical review. J Constr Eng Manag 145(12):4019076
Jørgensen B, Emmitt S (2008) Lost in transition: the transfer of lean manufacturing to construction. Engineering construction and architectural management. Emerald Group Publishing Limited, Bingley
Kähkönen A-K (2011) Conducting a case study in supply management. Oper Supply Chain Manag 4(1):31–41
Kamei Y, Fukushima T, McIntosh S, Yamashita K, Ubayashi N, Hassan AE (2016) Studying just-in-time defect prediction using cross-project models. Empir Softw Eng 21(5):2072–2106
Kim SK, Ahn NG (2017) Root cause analysis of the information industry ecosystem problems. J Inf Technol Appl Manag 24(4):71–92
Ko C-H (2010) Application of lean production system in the construction industry: an empirical study. J Eng Appl Sci 5(2):71–77
Latino MA, Latino RJ, Latino KC (2019) Root cause analysis: improving performance for bottom-line results. CRC Press, Boca Raton
Li S, Fang Y, Wu X (2020) A systematic review of lean construction in mainland China. J Clean Prod 257:120581
Li X, Li Z, Guangdong W (2018) Lean precast production system based on the CONWIP method. KSCE J Civil Eng 22(7):2167–2177
Márquez FP, Ramirez IS (2020) Introductory Chapter: Introduction to lean manufacturing. Lean manufacturing and six sigma-behind the mask. IntechOpen, London
McCutcheon DM, Meredith JR (1993) Conducting case study research in operations management. J Oper Manag 11(3):239–256
Meng X (2020) Proactive management in the context of construction supply chains. Prod Plan Control 31(7):527–539
Nicał AK (2018) Enhancing lean concept in precast concrete manufacturing with advanced material requirements planning system. Építészmérnöki Kar
Nounou A (2018) Developing a lean-based holistic framework for studying industrial systems. Prod Plan Control 29(13):1096–1111
Ohno T (1988) Toyota Production System: Beyond Large-Scale Production. CRC Press, Boca Raton
Okes D (2019) Root cause analysis: the core of problem solving and corrective action. Quality Press, Milwaukee
Otto K, Mosqueda JS (2019) Model based root cause analysis of manufacturing quality problems using uncertainty quantification and sensitivity analysis. Int Design Eng Tech Confer Comput Inf Eng Conf 59179:V001T02A071
Pernstål J, Feldt R, Gorschek T, Florén D (2019) FLEX-RCA: a lean-based method for root cause analysis in software process improvement. Softw Qual J 27(1):389–428
Rahani AR, Al-Ashraf M (2012) Production flow analysis through value stream mapping: a lean manufacturing process case study. Procedia Eng 41:1727–1734
Ramadan M, Al-Maimani H, Noche B (2017) RFID-enabled smart real-time manufacturing cost tracking system. Int J Adv Manuf Technol 89:969–985
Robbins T, Tipper S, King J, Ramachandran SK, Pandit JJ, Pandit M (2020) Evaluation of learning teams versus root cause analysis for incident investigation in a large united kingdom national health service hospital. J Patient Saf 8:1800–1805
Rother M, Shook J (2003) Learning to see: value stream mapping to add value and eliminate Muda. Lean Enterprise Institute, Cambridge
Sacks R, Korb S, Barak R (2017) Building lean, building BIM: improving construction the Tidhar way. Routledge, London
Salem R, Musharavati F, Hamouda AM, Al-Khalifa KN (2016) An empirical study on lean awareness and potential for lean implementations in Qatar industries. Int J Adv Manuf Technol 82(9–12):1607–1625
Sarhan JG, Xia Bo, Fawzia S, Karim A (2017) Lean construction implementation in the saudi arabian construction industry. Constr Econ Build 17(1):46–69
Serrat O (2017) The five whys technique. Knowledge solutions. Springer, Singapore, pp 307–310
Seth D, Seth N, Dhariwal P (2017) Application of value stream mapping (VSM) for lean and cycle time reduction in complex production environments: a case study. Prod Plan Control 28(5):398–419
Suhaini NA, Abas NH, Nagapan S, Nadarason K (2019) Identification of construction waste generated at precast concrete plants: case study. IOP Conf Series Mater Sci Eng 601:12036
Tauriainen M, Marttinen P, Dave B, Koskela L (2016) The effects of BIM and lean construction on design management practices. Procedia Eng 164:567–574
Tezel A, Koskela L, Aziz Z (2018) Lean thinking in the highways construction sector: motivation, implementation and barriers. Prod Plan Control 29(3):247–269
Wilson TD, Lisle DJ, Schooler JW, Hodges SD, Klaaren KJ, LaFleur SJ (1993) Introspecting about reasons can reduce post-choice satisfaction. Pers Soc Psychol Bull 19(3):331–339
Zarei B, Sharifi H, Chaghouee Y (2018) Delay causes analysis in complex construction projects: a semantic network analysis approach. Prod Plan Control 29(1):29–40
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Laika, M., Heravi, G., Rostami, M. et al. Improving the Performance of Precast Concrete Production Processes by Simultaneous Implementation of Lean Techniques and Root Cause Analysis. Iran J Sci Technol Trans Civ Eng 46, 2649–2666 (2022). https://doi.org/10.1007/s40996-022-00839-4
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s40996-022-00839-4