The extensive water resources development plan that Ethiopia has recently embarked on encompasses all major river basins, including the Abbay Basin where Didessa Sub-basin is situated. The main objective of the study was to assess the impact of water resources development on instream and downstream water availability, and identify intra-sub-basin locations vulnerable to shortage of surface water, in Didessa Sub-basin. The Water Evaluation And Planning (WEAP) Tool was used to model the surface water resources allocation of the sub-basin, based on the water demand data extracted mainly from the Abbay Basin integrated development master plan. Existing demand sites were collected from irrigation and water supply sectors of the government. To estimate the crop water requirement and instream flows requirement (IFR), respectively CROPWAT 8.0 and Indicators of Hydrologic Alteration (IHA) programs were used. The shortage of recorded data of streamflow was supplemented by the outputs of SWAT hydrological model. Three development scenarios, viz., current development (2014), medium-term future development (2015–2030) and long-term future development (2031–2050), were built. It was demonstrated that the model sufficiently represented surface water flow of the sub-basin. The results indicated that at the last year of scenarios (2050), there will be a 1.101 billion cubic meters (BCM), i.e., 10.3 %, reduction in the total annual flow of Didessa River. Besides, it was found out that some of the schemes in Anger, Dabena and Upper Didessa watersheds will have unmet demands at the last year of scenarios. Nonetheless, it was shown that IFR of 5.46 BCM will be fully delivered at the outlet of Didessa River; hence, no sub-basin wide absolute scarcity of water would develop.

Keywords

Demand site Didessa sub-basin IFR Streamflow Supply source Unmet demand WEAP 

Background

Ethiopia has embarked on extensive water resources development plan since few years back. Though the development activities encompass all major river basins of the country, the huge agricultural and hydroelectric power potentials in the Abbay (Upper Blue Nile) Basin have attracted considerable attention. Hence, there are currently a number of water resources development projects in the construction and planning phases in Didessa Sub-basin of the Abbay Basin.

A water-stressed situation in a watershed does not occur instantaneously; rather, it is a phenomenon which develops through time. It has been a common practice to evaluate water crises after symptoms of water scarcity have begun to manifest themselves. It is, of course, very useful to make water allocation analysis even after water shortage has manifested itself, as it would lead to seeking a win–win situation among different water users (demand sites) in the watershed. However, assessing the overall water resources potentials and the existing and planned demand centers in the basin ahead of time would help in limiting developments only to the carrying capacity of the resource, while considering the sustainability issues which need to address the right of the future generation to make their lives from the resource.

The main objective of this study is to assess the impact of additional water demand and surface water resources development in Didessa Sub-basin on downstream and instream water availability, using the Water Evaluation And Planning (WEAP) system. Besides, vulnerable locations to shortage of water within the sub-basin due to water abstraction and use will be identified.

Materials and methods

Location of the study area

Didessa Sub-basin forms the southwestern protruding portion of Abbay Basin in West Ethiopia. The study area is situated between 07°42′40″–09°58′17″ North latitude and 35°33′14″–37°07′52″ East longitude. The total area of the watershed is about 28,092 km2. The major water resources development projects and demand sites to be input to the analysis are distributed on the main stem of Didessa River and along the four major tributaries, namely Anger, Dabena Wama and Upper Didessa rivers. Figure 1 shows location of Didessa Sub-basin.
Fig. 1

Location map of Didessa Sub-basin

Dataset and data sources for Didessa Sub-basin WEAP model

The major data types that are used in this study are hydrological time series data, water demand data, water supply schemes and their corresponding geographical locations, GIS vector map of Didessa Sub-basin and Didessa river system. Existing and planned projects have been included in the model.

McCartney and Girma (2012) witnessed the lack of information on water resources and the implications of different investment options had been a major challenge in the Abbay Basin. The condition in Didessa Sub-basin is even worse. Due to the lack of sufficient hydrological data (shortage of streamflow monitoring stations) at important points in the sub-basin, it was not possible to use recorded flow data in this model. Hence, an output of the SWAT hydrological model of the sub-basin, as suggested by (The Nature Conservancy 2009), has been used.

Table 1 summarizes the dataset used in WEAP modeling of the study area, and their corresponding sources.
Table 1

Types and sources of input data for Didessa Sub-basin WEAP model

Data type

Source

Scale/period

Description

Mean monthly streamflow

Output of SWAT model

Mean of 31 years (1982–2012)

 

Mean monthly evapotranspiration

Ethiopian meteorological agency

Mean of 31 years (1982–2012)

 

Demand sites and supply sources

Ministry of Water irrigation and energy

Oromia irrigation development authority

Nekemte and Bedele towns water supply and sewerage authorities

 

1998 Abbay Basin integrated development master plan

Existing irrigation development schemes

Mean daily water supply

Demand sites and supply sources

Demand sites

The demand sites and their corresponding annual activity levels have been identified from the Abbay Basin integrated development master plan project document and Oromia Irrigation Development Authority (OIDA). The major demand sites in the sub-basin are irrigation, domestic water and hydroelectric power demand sites. The irrigation schemes identified in the master plan amount to about 79,180 ha (MWR 1999). According to this document, small-scale irrigation (SSI) (less than 200 ha) potential in the sub-basin is more than 51,849 ha. However, the final and accurate location of the SSI schemes which would be implemented during the master plan period was not given. Hence, for the present study, the planned SSI schemes are located approximately. Table 2 shows the summary of irrigation development demand sites in the sub-basin, which have been identified to be implemented during the master plan period.
Table 2

Summary of existing and planned irrigation demand sites

Duration

Irrigable area (ha)

Total

Small-scale

Medium scale

Large scale

Base year (1998)

3478

  

3478

Current development (2014)

9196

  

9196

Medium-term future development (2015–2030)

22,241

1144

109,283

132,668

Long-term future development (2031–2050)

41,225

5227

143,418

189,870

Besides, one hydroelectric power generating scheme, with an installed capacity of 300 MW has been identified on the master plan.

The demand sites are distributed all over the sub-basin. Especially, as the areal extent of SSI schemes is small, and they are often managed at farm households’ level, it is common to find them distributed along the majority of the small streams. Figure 2 shows the distribution of demand sites.
Fig. 2

Distribution of demand sites

Supply sources

All supply sources of the existing and planned development in Didessa Sub-basin are fed from surface water resources of the main stem of Didessa River and its tributaries. The mean annual outflow from Didessa River and its major tributaries is depicted on Table 3 below.
Table 3

Mean annual outflow of the major tributaries and the main stem of Didessa River

Sr. no.

River

Catchment area (km2)

Mean annual outflow (BCM*)

1

Anger

7405

3.31

2

Dabena

3341

1.22

3

Upper Didessa

5540

1.98

4

Wama

3372

1.51

5

Didessa (main stem)

28,092

10.71

Source: Tena et al. (2015)

BCM* Billion cubic meters

Currently, there are one reservoir and one pumping station as supply sources for domestic water supply for two urban areas in the sub-basin. One major dam and reservoir project, Arjo-Didessa Dam and Reservoir Project, is under construction, while four other dam and reservoir projects are encompassed in the medium and long-term development plans. The salient features of the supply sources are portrayed on Table 4 below.
Table 4

Major supply sources

Sr. no.

Supply source

Location

Dam height (m)

Storage capacity (MCM**)

Latitude (°)

Longitude (°)

1

Arjo-Didessa reservoir

8.525

36.664

47

1049.9

2

Anger reservoir

9.692

36.74

80

1102

3

Nekemte reservoir

9.431

36.499

30

71.5

4

Negesso reservoir

8.859

36.547

30

104

5

Meka reservoir

9.011

36.482

21

11

6

Bedele water supply

8.436

36.245

Pumping

7

Lower Didessa reservoir

9.486

35.985

78

5510

Source: MWR (1999)

MCM** Million cubic meters

Annual water use rates

  1. I.

    Irrigation water demand:

     
Scarcity of weather monitoring stations, and short records in many of the existing stations is a challenge to the use of site specific crop water requirement estimation. Hence, the existing and planned schemes in the sub-basin were clustered into two categories depending on proximity and the agro-ecological similarity of the areas. Accordingly, two conventional meteorological stations with relatively better data availability, Bedele and Anger stations, were intentionally selected, as they are fairly representing the two agro-ecologic zoning of the existing and planned projects. It has been assumed that Bedele station, located at an altitude of 2011 m above sea level (m.a.s.l), and Anger station, located at an altitude of 1350 m.a.s.l, can, respectively, represent projects located in mid altitude (Woina Dega) and lowlands (Kolla) agro-climatic zones. The projects clustered under Anger Irrigation water demand scheme are found in the altitude range of about 1160–1500 m.a.s.l while those clustered under Bedele (Didessa) irrigation water demand scheme are found in altitude range of about 1500–1970 m.a.s.l. The other point that was considered as criteria for clustering was proximity of the areas to one another (adjacency of the sites). The clusters are:
  1. A.

    Schemes located in Wama Watershed (Negesso Irrigation, small and medium scale irrigation schemes situated in Wama Watershed), schemes situated in Upper Didessa Watershed (Arjo-Didessa Irrigation, small and medium scale irrigation schemes situated in Upper Didessa Watershed and the upper reach of the main stem of Didessa River), and schemes situated in Dabena Watershed are categorized under Didessa irrigation water requirement scheme. To estimate the crop water requirement for this scheme, the meteorological parameters of Bedele Meteorological Station is used.

     
  2. B.

    Schemes located in and around Anger Watershed (Anger Irrigation, Nekemte Irrigation, SSI schemes situated in Anger Watershed and schemes situated on the lower reach of the main stem of Didessa River) are categorized under Anger irrigation water requirement scheme.

     

The irrigation water demand has been estimated for a crop that requires the highest amount of water (sugarcane) as it is going to be grown widely, especially on Arjo-Didessa Irrigation Development Project, the main objective of which is to develop sugarcane on 80,000 hectares of land. Sugarcane is considered to estimate the crop water requirement for the rest of the schemes, too, for two reasons. The first reason is that the freedom that small holder farm households have to select the type of crop to be grown would pose a challenge on determining the accurate type of crops grown and their corresponding areal extent; and the second is that the trend of organizing individual farmers as out-growers of sugarcane, that is being promoted in the former sugar factories, is expected to be practiced in the vicinity and nearby areas to Arjo-Didessa Sugar Factory as well.

Irrigation water demand was estimated using CROPWAT version 8.0, a programme developed by the Food and Agricultural Organization of the United Nations. The outputs of CROPWAT 8.0 (monthly irrigation requirements) for the two areal categories are summarized on Table 5.
Table 5

Summary of irrigation requirements for the two stations

Month

Station

Anger

Didessa

mm

m3/ha

Monthly variation (%)

mm

m3/ha

Monthly variation (%)

January

48.7

487

6.37

96.1

961

19.66

February

73.5

735

9.61

99.1

991

20.28

March

130.8

1308

17.10

80.5

805

16.47

April

175.9

1759

23.00

43.0

430

8.80

May

151.0

1510

19.75

47.6

476

9.74

June

68.5

685

8.96

6.6

66

1.35

July

9.1

91

1.19

0

0

0

August

0.0

0

0

0

0

0

September

2.8

28

0.37

0

0

0

October

0.0

0

0

0

0

0

November

23.3

233

3.05

24.2

242

4.95

December

81.1

811

10.61

91.6

916

18.74

Total

764.7

7647

100.00

488.7

4887

100.00

Crop type: sugarcane

  1. II.

    Domestic water demand:

     
There are two major urban areas which have been deriving water from the tributaries of Didessa River for domestic use. Nekemte, the capital city of East Wollega Administrative Zone, is deriving water from a reservoir constructed on Meka Stream, and Bedele Town is deriving its water from Dabena River. The World Health Organization (WHO) recommends about 100 l of water per person per day to ensure that most basic needs are met and few health concerns arise (WHO 2003). On the other hand the water supply authorities of the two towns claim that they are distributing 4095 and 8400 m3/day for Bedele and Nekemte, respectively. For this study, per capita water supply of 100 l per day (36.5 m3/cap/year) is used.
  1. III.

    Instream (environmental) flows requirement:

     

Environmental flows is required in order to protect natural reserves and preserve the ecosystems. The ever increasing recognition of environmental flows as vital in maintaining healthy, productive and sustainable river and groundwater systems deserves the attention of all actors. That is, the arbitration in the competition for water between different users, including the environment, should go beyond being the duty of certain institutions or environmental activists. As physical water scarcity is said to occur when there is not enough water to meet all demands, including environmental flows, the environment need to be allocated its fair share of water (FAO 2012). The allocation of water for instream flow requirement right before the symptoms of physical water scarcity like severe environmental degradation, declining groundwater, and water allocations that favor some groups over others, manifests, would help minimize the unfavorable effects occurring as a result of shortage of water.

Hence, environmental flows is one of the various water demands that need to be incorporated in water resources allocation modeling. Current aquatic ecology and empirical observations suggest that a hydrological regime characterized by the full or nearly full range of natural variation is necessary to sustain the full native biodiversity and integrity of aquatic ecosystems (Richter et al. 1997).

Quantifying the ecological reserve for rivers involves determining the water quantity and quality requirements that will ensure that they are sustained in a pre-determined condition. This condition can vary from largely natural to largely modified where there is a large loss of natural habitat, biota and basic ecosystem functioning (Hughes and Hannart 2003). It is, therefore, recognized that while some rivers are environmentally important, the requirements for socio-economic development in a water scarce country suggest that not all rivers can be retained in a near natural state. It is also recognized that resource development should be environmentally sustainable and therefore all rivers should retain some basic ecological functioning.

According to Smakhtin et al. (2006), the desktop environmental flows assessment (EFA) methods are more suitable for initial, reconnaissance-level assessments of environmental flows requirements in unregulated river basins and/or river basins where the pressure on water resources is not yet extreme, but starting to grow. Didessa Sub-basin falls under this category of rivers; hence, the method is appropriate at this level to make initial estimates of EFA. Notwithstanding the importance of obtaining a well refined environmental flows estimates based on ecological and livelihood studies, data scarcity and the fact that hydroecological surveys have rarely been conducted in the sub-basin would compel one to use the desktop model, at least at this initial stage.

The Indicators of Hydrologic Alteration (IHA) calculates parameters for five different types of environment flow components (EFCs): low flows, extreme low flows, high flow pulses, small floods, and large floods. This delineation of EFCs is based on the realization by research ecologists that river hydrographs can be divided into a repeating set of hydrographic patterns that are ecologically relevant. It is the full spectrum of flow conditions represented by these five types of flow events that must be maintained in order to sustain riverine ecological integrity. Not only is it essential to maintain adequate flows during low flow periods, but higher flows and floods and also extreme low flow conditions also perform important ecological functions (The Nature Conservancy 2009).

The low flows is the dominant flow condition in most rivers. In natural rivers, after a rainfall event or snowmelt period has passed and associated surface runoff from the catchment has subsided, the river returns to its base- or low-flow level. These low-flow levels are sustained by groundwater discharge into the river. The seasonally-varying low-flow levels in a river impose a fundamental constraint on a river’s aquatic communities because it determines the amount of aquatic habitat available for most of the year. This has a strong influence on the diversity and number of organisms that can live in the river (The Nature Conservancy 2009).

Thus, the low flows parameter of the IHA’s environmental flows component satisfies the environmental water demand (instream flow requirements) of rivers. Hence, for Didessa Sub-basin, the instream flow requirements at the downstream of the major reservoirs, at the outlet of the four major tributaries and the outlet of Didessa River have been determined using the IHA. The mean annual outflow and instream flow requirements for some important reaches are shown on Table 6.
Table 6

Annual streamflow and instream flow requirements at some important reaches

Sr. no.

Subbasin/Reach Name

Streamflow (BCM)

IFR (BCM)

Remark

1

Anger-5

0.78

0.47

D/s of Anger reservoir

2

Anger-13

2.48

1.52

D/s of Nekemte reservoir

3

Anger-7

3.31

2.13

Outlet of Anger river

4

Dabena-24

1.22

0.73

Outlet of Dabena river

5

Upper Didessa-23

1.98

0.90

D/s of Arjo-Didessa reservoir; outlet of Upper Didessa river

6

Wama-17

0.36

0.18

D/s of Negesso reservoir

7

Wama-21

1.51

0.97

Outlet of Wama river

8

Didessa-Nr. Arjo

3.90

2.41

Gauging station

9

Didessa-15

6.41

3.33

D/s of Dabena’s confluence with Didessa

10

Didessa-9

6.63

3.57

U/s of Anger’s confluence with Didessa

11

Didessa Main-1

10.71

5.46

Outlet of Didessa main

Source for streamflow: Tena et al. (2015)

Figure 3 shows location of points where IFR are determined.
Fig. 3

Location of WEAP IFR points

The WEAP model

Background

The Water Evaluation And Planning version 21 (WEAP21) integrated water resource management (IWRM) model seamlessly integrates water supplies generated through watershed-scale hydrologic processes with a water management model driven by water demands and environmental requirements and is governed by the natural watershed and physical network of reservoirs, canals, and diversions (Yates et al. 2005). WEAP is a PC based surface and groundwater resource simulation tool, based on water balance accounting principles, which can test alternative sets of conditions of both supply and demand. The change in water demand, supply and pollution can be projected over a long-term planning horizon to develop adaptive management strategies.

WEAP has been used in several water related researches/projects across the world. For example WEAP was used to determine the likely impact of a number of possible development scenarios in Lake Tana Catchment, Ethiopia, on lake water levels (Alemayehu et al. 2010). It was also used to evaluate Ethiopia’s policy of large dam construction in the Blue Nile River basin by simulating the impact of one downscaled midrange climate change scenario (A1B) on the performance of existing and planned hydropower and irrigation schemes (McCartney and Girma 2012).

WEAP is widely used in other parts of the world, too. For example, Arranz and McCartney (2007) applied WEAP Model to assess future water demands and resources in the Olifants Catchment, South Africa. Mounir et al. (2011) also conducted a study using WEAP model to investigate scenarios of future water resource development in the Niger River Basin in Niger Republic. Similarly, it was used to assess the potential effects of climate change and adaptive management on irrigation water supply in the Cache Creek watershed in California (Mehta et al. 2013). Hence, WEAP model has high global popularity in scenario analyses of water demands and supplies.

In the present study, WEAP21 is used to evaluate the implications of existing and planned water resources development in Didessa Sub-basin, on instream and downstream water availability.

Model setup

Modeling assumptions

Regardless of the differences in financial returns expected from each scheme, all demand sites were designated equal priority in water provision. Hence, recognizing the environment as a legitimate user of water, it was also designated equal priority to the other demand sites. With the exception of Arjo-Didessa Dam which is currently under construction, and is expected to be commissioned in 2015, all major dams listed in the Abbay Basin integrated development master plan corresponding to Didessa Sub-basin are at the planning stage. Hence, operating rule curves are currently not available for anyone of them, and none is incorporated in the WEAP model of the sub-basin.

The other important assumption to be noted is that the annual water use rate for agriculture (irrigation) is estimated for sugarcane, a crop which will be widely grown, and which has, relatively, higher crop water demand.

Development scenarios

WIKIPEDIA-The Free Encyclopedia defines Scenario analysis as “a process of analyzing possible future events by considering alternative possible outcomes (sometimes called “alternative worlds”)” (WIKIPEDIA 2015). Accordingly, the scenario analysis, which is a main method of projections, does not try to show one exact picture of the future. Instead, it presents consciously several alternative future developments. Consequently, a scope of possible future outcomes is observable.

In a way more relevant to water resources, scenarios are defined as alternative sets of assumptions such as different operating policies, costs, and factors that affect demand such as demand management strategies, alternative supply sources and hydrologic assumptions, with changes in these data able to grow or decline at varying rates over the planning horizon of the study. Thus, scenarios are not created from the minds of the requirements engineers; their definition should be anchored on real situations (Leite et al. 2000). The typical characteristic of this (scenario analysis) method is that it can model many real problems where decisions are based on uncertain information presented as a set of possible outcomes (i.e., scenarios) (Weng et al. 2010).

The Abbay River Basin integrated development master plan MWR (1999) has been the basis to build development scenarios for the present study. The master plan was formulated in 1998, for a time horizon of 50 years. Hence, the years 1998 and 2050 are, respectively, considered as the current accounts year and last year of scenarios.

Assuming different growth rates, two scenarios were formulated on the Abbay Basin integrated development master plan, as to when to implement the planned projects: conservative scenario and accelerated scenario (MWR 1999). The development periods were classified as 1999–2014, 2015–2030 and 2031–2050. However, it was observed that most of the schemes proposed on the master plan have not yet been constructed except a few SSI schemes. Hence, the existing developments are directly translated into base year and current accounts scenario, and a minor adjustment has been made on the implementation timing of the planned developments without significant change in the current accounts year, intermediate years and last year of scenarios. Major projects whose start up years have not yet elapsed are maintained as per their initial schedules as long as they are not preceded by a project whose start up period has passed.

Three development scenarios, namely reference (current development) (1999–2014), medium-term future development (2015–2030) and long-term future development (2031–2050) scenarios have been proposed.

Regarding the developments which were undertaken during the reference scenario time horizon, additional inputs from irrigation development and water supply sectors have been incorporated. As McCartney and Girma (2012) observed, Ethiopia has utilized very little of the Blue Nile water due to physical, infrastructural, socio-economic, etc., constraints. This is particularly true when Didessa River is considered. So far, only few SSI schemes and no hydropower development exist in Didessa Sub-basin. Table 7 portrays the major demand sites and their corresponding annual activity levels in the sub-basin.
Table 7

Scenario building

Sr. no.

Description

Scenarios

Base Year (1998)

Reference (current development) (1999–2014)

Medium-term future development (2015–2030)

Long-term future development (2031–2050)

A

Domestic water demand (MCM/year at the end of scenario period)

  A.1

Nekemte town domestic water demand

1.93

3.67

6.97

15.57

 A.2

Bedele town domestic water demand

0.50

0.95

1.81

4.04

B

Agricultural (irrigation) activity levels (ha)

 B.1

EW-SSI

3161

8079

19,903

37,951

 B.2

WW-SSI

80

80

80

80

 B.3

IAB-SSI

201

401

822

822

 B.4

Jima-SSI

36

636

1436

2372

 B.5

Arjo-Didessa irrigation

80,000

80,000

 B.6

Anger irrigation

8000

14,450

 B.7

Nekemte irrigation

6000

11,220

 B.8

Negesso irrigation

5000

21,315

 B.9

Hida irrigation

5650

5650

 B.10

Wama irrigation

325

325

 B.11

Lugo irrigation

285

285

 B.12

Dimtu and Didiga irrigation

5167

5167

 B.13

Upper Dabena irrigation

1150

 B.14

Dabena irrigation

6150

 B.15

Urgessa irrigation

2933

C

Hydropower activity level (GWH)

 C.1

Lower Didessa hydropower (300 MW installed capacity)

1582

D

Environmental flows requirement

Data source: MWR (1999), OIDA (2014)

Schematic of the study area

A schematic, or schematic diagram, is a representation of the elements of a system using abstract, graphic symbols rather than realistic pictures. A schematic usually omits all details that are not relevant to the information the schematic is intended to convey, and may add unrealistic elements that aid comprehension (WIKIPEDIA 2015). The Schematic View is the starting point for all activities in WEAP (SEI 2011).

WEAP allows the display of GIS layers as overlays or backgrounds on the WEAP Schematic. Hence, Didessa Sub-basin vector layer, which includes Didessa River system, has been added. An image of the WEAP schematic is shown below (Fig. 4).
Fig. 4

Screenshot of the schematic of Didessa Sub-basin WEAP model

The existing and planned development in the sub-basin during the three development scenarios have been summarized on the following figures (Fig. 5).
Fig. 5

Line representation (schematic) of the model for different development scenarios

The monthly headflows data were obtained from the SWAT Hydrological Model of the Sub-basin (Tena et al. 2015) and entered into the headflows environment for each stream. Similarly, the data for all demand sites, supply and resources, key assumptions, etc. were entered.

Results and discussion

The WEAP model performs a mass balance of flow sequentially down a river system, making allowances for abstractions/water use and inflows. The elements that comprise the water demand–supply system and their spatial relationship are characterized within the model. The WEAP model for Didessa River system was setup to simulate the base year (1998) situation and three subsequent scenarios: the Reference (current) situation (1999–2014), the Medium-term future development (2015–2030), and the long-term future development (2031–2050) scenarios. The basis for the timelines of these scenarios is the Abbay Basin integrated development master plan of 1998.

For each scenario, the main outputs analyzed include the extent of satisfying the water demand of different sectors, the degree to which the instream flow requirements is satisfied, and the spatial and temporal variation in water shortages, if any. Due consideration was rendered to determining the streamflow at the catchment outlets and the outlet of the main stem of Didessa River so as to determine the cumulative impact of additional upstream water abstraction on instream and downstream water availability.

Water demand, streamflow and instream flow requirements (IFR)

The total annual water demand under the three development scenarios is depicted on Table 8 below.
Table 8

Total annual water demand under the three development scenarios

Scenario

Demand (MCM)

% of the mean annual streamflow

Reference

74.72

0.70

Medium-term Future

746.22

6.97

Long-term Future

1199.33

11.20

The annual streamflow of the main stem of Didessa River and the four major tributaries as per the WEAP model of the sub-basin, for the three development scenarios are depicted below (Fig. 6).
Fig. 6

Annual streamflow under each scenario (output of WEAP model)

From the SWAT hydrologic model of the sub-basin, the mean annual flowout at Didessa-Abbay confluence is 10.71 BCM (Tena et al. 2015). This value is sufficiently comparable with WEAP’s 10.63 BCM for the reference scenario. The SWAT hydrologic modeling of Didessa Sub-basin involved setting up the model using a DEM of 20 m horizontal resolution, land use/cover and soils maps obtained from the Ministry of Water, Irrigation and Energy. Weather data from selected weather monitoring stations were used to setup the model.

The model calibration and validation were performed using the sequential uncertainty fitting (SUFI-2) algorithm of SWAT calibration and uncertainty programs (SWAT-CUP). The model predicted monthly discharge with high accuracy, with Nash Sutcliff Efficiency (NSE) values of 0.87 and 0.80 for the calibration (1982–1986) and validation (1992–1996) periods, respectively; and coefficient of determination (R2) values of 0.87 and 0.80 for the calibration and validation periods, respectively. The calibration and validation of the model were performed for a measured flow data at Didessa Near Arjo gauging station, which is located at 8°4′N latitude and 36°25′E longitude.

The following chart (Fig. 7) depicts the temporal and spatial distribution of streamflow at the end of the long-term future development scenario. The streamflow for the main stem of Didessa River according to SWAT Hydrologic Model (‘natural’) has been added for comparison. In WEAP, natural flow is meant to indicate the river flow without any development. Besides, the outputs of the SWAT model for the major tributaries and main stem of Didessa River at its outlet have been considered as natural flow, as there is no flow monitoring station towards the downstream ends of the rivers to get recoded flow data and make analyses of water consumption and instream flow requirement. The word natural has been put in single quotation mark (‘natural’) to make a distinction that the flow is not a recorded natural flow.
Fig. 7

Monthly streamflow at the end of Long-term future development scenario

The streamflow data for the tributaries is also reasonably comparable to those obtained from the SWAT hydrologic model.

The monthly Instream Flow Requirement for the main stem of Didessa River at the end of the long-term future development scenario is depicted below (Fig. 8). The chart shows that the Instream Flow Requirement varies in a similar trend with the monthly streamflow.
Fig. 8

Monthly IFR for Didessa River at Didessa-Abbay confluence (2050)

Table 9 shows streamflow, IFR, and IFR delivered at some important reaches of the main stem of Didessa River and its tributaries. It can be observed from the table that except Dabena River, the IFR has been satisfied in the mentioned reaches. It seems that the flow of Dabena River cannot satisfy the urban, agricultural and environmental water needs of the currently existing demand sites (Bedele Town Water Supply) and the plan to be implemented until 2050.
Table 9

Annual streamflow and instream flow requirements for some important reaches

Sr. no.

Subbasin/reach name

Streamflow (BCM)

IFR (BCM)

IFR delivered (BCM)

Remarks

1

Anger-5

0.78

0.47

0.47

 

2

Anger-13

2.48

1.52

1.52

 

3

Anger-7

3.31

2.13

2.13

Outlet of Anger R.

4

Dabena-24

1.22

0.724

0.703

Unmet IFR = 0.021

5

Upper Didessa-23

1.98

0.90

0.90

Outlet of Wama R.

6

Wama-17

0.36

0.177

0.177

 

7

Wama-21

1.51

0.975

0.975

Outlet of U/Didessa R.

8

Didessa- Nr. Arjo

3.90

2.405

2.405

 

9

Didessa-15

6.41

3.568

3.568

 

10

Didessa-9

6.63

3.326

3.326

 

11

Didessa Main-1

10.71

5.463

5.463

Outlet of Didessa R.

Change in streamflow and water consumption

The existing and planned development will cause some changes in river flow of the tributaries and the main stem of Didessa River. Table 10 summarizes streamflow for the current development and the two future development scenarios.
Table 10

Changes in river flow under each scenario for the major tributaries and the main stem of Didessa River

Sr. no.

River

‘Natural’ (output of SWAT model)

Annual stream flow under each scenario (BCM)

Current development

Medium-term future development

Long-term future development

a. Mean annual streamflow across scenarios

1

Anger

3.31

3.243

3.049

2.928

2

Dabena

1.22

1.219

1.218

1.189

3

Wama

1.51

1.487

1.474

1.430

4

Upper Didessa

1.98

1.977

1.537

1.533

5

Didessa Main

10.71

10.632

10.016

9.609

Sr. no.

River

‘Natural’ (output of SWAT model)

Annual water consumed under each scenario (BCM)

Current development

%

Medium-term future development

%

Long-term future development

%

b. Change (decrease) in annual flow across scenarios

1

Anger

3.31

0.07

2.0

0.26

7.9

0.38

11.5

2

Dabena

1.22

0.001

0.1

0.002

0.2

0.031

2.5

3

Wama

1.51

0.023

1.5

0.036

2.4

0.080

5.30

4

Upper Didessa

1.98

0.003

0.2

0.443

22.4

0.447

22.6

5

Didessa Main

10.71

0.078

0.7

0.694

6.5

1.101

10.3

The base for estimation of the consumed is taken as the ‘natural’ flow (SWAT’s output)

Table 10 portrays the mean annual streamflow across scenarios. It shows that at the end of the long-term future development scenario, the annual flow of Didessa River will decrease to 9.609 BCM. This shows that the water consumed by demand sites will be 1.101 BCM (10.3 % of the mean annual flow). Table 10 shows the water consumption details for the main stem and the four major tributaries of Didessa River.

Spatial and temporal occurrence of water shortage/Unmet demands under each scenario

Spatial (Watershed-wise) occurrence of unmet demand

The spatial occurrence of unmet demands across the watersheds is shown bellow (Table 11).
Table 11

Spatial occurrence of unmet demands across watersheds

Sr. no.

Watershed/reach name

Scenarios

Volume of water (MCM)

Demand

Supply delivered

Unmet demand

1

Anger

Reference

55.54

50.29

5.25

Medium-term future

254.58

235.20

19.38

Long-term future

450.77

410.18

40.59

2

Dabena

Reference

0.95

0.93

0.02

Medium-term future

1.81

1.81

0.00

Long-term future

39.71

34.13

5.58

3

Wama

Reference

8.12

7.76

0.36

Medium-term future

47.92

47.92

0.00

Long-term future

165.69

165.69

0.00

4

Upper Didessa

Reference

3.11

2.53

0.58

Medium-term future

425.49

410.45

15.04

Long-term future

430.06

414.84

15.22

5

Didessa Main (some reaches)

Reference

7.00

6.56

0.44

Medium-term future

16.42

16.25

0.17

Long-term future

113.10

112.93

0.17

 

Total

Reference

74.72

68.07

6.65

Medium-term future

746.22

711.624

34.59

Long-term future

1199.33

1137.77

61.56

As shown above, there is unmet demand in all watersheds particularly for the medium-term and long-term future development scenarios, although there is variation in the extent of shortage. In this regard, Wama Watershed is in a better condition.

Spatial (Demand site-wise) occurrence of unmet demand

Demand sites with unmet water demand and their corresponding unmet demands are portrayed on Fig. 9 below.
Fig. 9

Annual unmet demand per demand sites at the end of each scenario period

The output of WEAP shows that during the Reference Scenario period, the water demand of some demand sites were not satisfied. The major demand sites with unmet demand are SSI demand sites in East Wollega Administrative Zone. Of course, there is no sub-basin wide absolute scarcity of water during this scenario. As indicated in the Abbay Basin Integrated Development Master Plan document, the exact location of all SSI schemes is not known; therefore, the shortage might have occurred due to the approximate positioning of the schemes. The second possible cause of the shortage is that for all irrigation demand sites, the crop water requirement was calculated for the highest crop water demand, which might not have been the case in practice. The total annual unmet demand was about 6.65 MCM.

During the medium-term future development Scenario, most of the demands are met. Some SSI demand sites and one large scale irrigation demand site have unmet demand. The annual unmet demand during the medium-term future development scenario is 34.59 MCM. The total supply delivered is 711.624 MCM (6.645 % of the total annual streamflow), against a demand of 746.22 MCM (6.97 % of the total Didessa annual flow).

At the end of the long-term future development scenario, the annual unmet demand in Didessa Sub-basin would reach about 61.56 MCM. The annual supply delivered would be about 1137.77 MCM (10.62 % of the mean annual flow), against a demand of 1199.33 MCM (11.20 % of the annual flow). The demand sites with unmet demand are SSI demand sites in East Wollega, West Wollega and Jima Zones, and medium and large scale irrigation demand sites in Dabena and Upper Didessa Watersheds. Bedele Town Demand Site, which derives its water from Dabena River, is also included among sites with unmet demand.

Temporal occurrence of unmet demands

Table 12 shows temporal (monthly) occurrence of unmet demand under the three development scenarios.
Table 12

Temporal occurrence of unmet demand across watersheds (MCM)

Scenario

Month

Sum

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Long-term future development

16.21

14.75

10.48

7.46

3.92

0

0

0

0

0

0.10

8.65

61.56

Medium-term future development

10.90

9.37

4.09

1.49

0

0

0

0

0

0

0.10

8.65

34.59

Reference

1.87

2.02

0.09

0.07

0

0

0

0

0

0

0

2.60

6.65

The above table shows that at the end of the long-term future development scenario (2050), demand will be fully met during the months of June–October only. This is typically the main rainy season in the study area. During the remaining seasons, there are varying amount of unmet demand.

Water shortage hotspots

Similar to the characteristics of rainfall distribution, there is variability in the spatial and temporal distribution of streamflow across the sub-basin. The water shortage hotspots are identified depending on the extent to which the surface water resource in the corresponding catchment is capable of meeting the demand of demand sites and the instream flow requirements.

With respect to watersheds, the water demand in Anger Watershed is the most unmet. All the demands in Dabena Watershed, including Bedele Town Demand Site, are unmet at the end of the long-term future development scenario. The shortage of water to meet the water demand of Bedele Town water supply is very critical if alternative water source is not available. The annual water demand of Bedele water supply demand site is unmet by about 2,62,000 m3.

Similarly, environmental water needs are not met in Dabena Watershed. To fully meet the annual Instream Flow Requirement, a deficit of 21 MCM of water is observed. Temporally, shortage of water is observed during the months of November–March.

In the other watersheds too, there are patch pockets where demands are not fully met. The demand of most SSI demand sites in East Wollega, West Wollega, I/A/Bora and Jima zones (Anger, Wama and Upper Didessa Watersheds), and that of Hida Irrigation (located in Upper Didessa Watershed) are unmet during the medium term future development scenario (for some of them) and the long-term future development scenario (for most of them). The instream flow requirements are met in all watersheds except Dabena. Regarding the SSI demand sites, the shortage of water might have occurred due to the possible reason of locating some of the sites approximately.

Summary and conclusions

Summary

The main objective of the study was to assess the possible impacts of upstream surface water abstraction in Didessa Sub-basin on downstream water availability and environmental flows. The water evaluation and planning (WEAP) Tool was used to evaluate the impacts. The three major categories of demand sites encompassed in the analysis were the irrigation demand sites, domestic (urban) water demand sites and hydroelectric power demand site. The annual activity levels for the demand sites were collected primarily from the Abbay Basin integrated development master plan of 1998. Besides, recent data on irrigation development and water supply have been collected from the irrigation development and water supply sectors of the government.

During the model setup, all demand sites, including the environmental flows, were assigned the same priority. The basic reason behind is that the environment is legitimate user of water and, therefore, should be allocated its fair share of the resource.

The agricultural (irrigation) water demand (crop water requirement) was estimated using CROPWAT 8.0, a program developed by the Food and Agricultural Organization of the United Nations. To be on the safest side, the highest crop water demand was considered. At the end of the master plan period, the total irrigation annual activity level will reach 189,780 ha, and the corresponding annual water requirement will be 1.162 BCM. The supply requirement for the two urban areas, Nekemte and Bedele towns, will be 19.612 MCM per year.

Similarly, the environmental flows (instream flow requirement) was estimated using the indicators of hydrologic alteration (IHA), a program developed by The nature conservancy. At the outlet of Didessa River, the total annual IFR of about 5.46 BCM is fully met at the end of the long-term future development scenario (end of the master plan implementation period).

The analysis has shown that, at the end of the master plan implementation period (2050), the reduction in the mean annual flow of Didessa River due to the development will be about 10.3 % of the total. Similarly, the reduction in the annual flow of the major tributaries will be 11.5, 2.5, 5.3 and 22.6 %, respectively, for Anger, Dabena, Wama and Upper Didessa rivers. Watershed wise, Dabena is the only one with unmet instream flow requirement. Despite the non-existence of universal shortage of water in Didessa Sub-basin, there are water shortage hotspots in all watersheds. The temporal occurrence of these shortages and the unmet IFR are during the months of November–March. This is the typical dry season in the area, and it is the season with the highest irrigation water requirement.

Conclusions

As part and parcel of the endeavors to assess the sustainability and environmental integrity of the existing and planned water resources development in Didessa Sub-basin, the water evaluation and planning (WEAP) model has shown a clue on what would possibly happen after the planned water resources development is fully implemented. It has been shown that at the end of the long-term future development scenario period (2050), some watersheds in Didessa Sub-basin will fall under a water shortage situation.

Overall, the impact of the existing and planned water resources development on delivery of instream flow requirements and downstream water availability is minimal. By the end of 2050, the reduction in the total annual flow of Didessa River due to the existing and planned water resources development would be about 1.101 BCM (10.3 % of the total annual flow). A watershed which should be rendered special focus is Dabena Watershed, where the water demand of all demand sites, including the IFR, would not be met at the end of the long-term future development scenario. If the water resources development plans in this watershed need to be implemented without any major detrimental effect on the environment, it might be necessary to make arrangements to provide storage facilities that would minimize the ill-effects of the development endeavors.

Regarding the irrigation development demand sites whose demands are not met, the watersheds where they are situated are, generally, not in a water shortage situation. Therefore, the problem might be resolved by locating the schemes based on proper feasibility analyses.

Moreover, this study demonstrates that the problems associated with lack of information on water resources, especially recorded hydrological data, can be tackled by supplementing the existing data from few conventional gauging stations with the outputs of hydrological models like SWAT, and using in water allocation models.

This analysis was made based on data and information gathered from the master plan project document, which is crude by its nature, as it was prepared for a large river basin, where there is the possibility of overlooking things that were happening at sub-basin or small watershed scale. Hence, some of the parameters that were input in the WEAP model were fixed based on assumptions. Nonetheless, the results of this study are indicative of what may happen and what need to be done; and the data generated here might be a springboard for further study on issues related to sustainable water resources planning and development in the sub-basin.

The study was conducted on the basis of the Abbay Basin integrated development master plan, where groundwater was not considered as an alternative supply source, in order to evaluate the impact of the existing and planned development on instream and downstream water availability. It was considered that the assumptions on which the master plan study was based will prevail, as this is one possible scenario. Therefore, it is recommended that further study addressing potential climate and land use/cover change scenarios, and groundwater resources as alternative supply sources be conducted in the future. Besides, it is recommended that site specific crop water demand be estimated based on surveys to perform more refined water resources allocation modeling.

Notes

Acknowledgments

The authors are grateful to the editor of the journal and the anonymous reviewer/s for their relevant and valuable comments on earlier version of the manuscript due to which the contents of this paper have been enriched.

References

  1. Alemayehu T, McCartney M, Kebede S (2010) The water resource implications of planned development in the Lake Tana catchment. Ethiopia Ecohydrol Hydrol 10(2–4):211–222CrossRefGoogle Scholar
  2. Arranz R, McCartney M (2007) Application of the water evaluation and planning (WEAP) model to assess future water demands and resources in the olifants catchment, South Africa. IWMI Working Paper 116. Colombo, Sri Lanka: Internation Water Management InstituteGoogle Scholar
  3. FAO (2012) Coping with water scarcity-An action framework for agriculture and food security. Food and Agricultural Organization of The United Nations, RomeGoogle Scholar
  4. Hughes DA, Hannart P (2003) A desktop model used to provide an initial estimate of the ecological instream flow requirements of rivers in South Africa. J Hydrol 270:167–181CrossRefGoogle Scholar
  5. Leite JC, Hadad GD, Doorn JH, Kaplan GN (2000) A scenario construction process. Requirements Eng 5:38–61CrossRefGoogle Scholar
  6. McCartney MP, Girma MM (2012) Evaluating the downstream implications of planned water resource development in the Ethiopian portion of the Blue Nile River. Water Int 37(4):362–379. doi:10.1080/02508060.2012.706384 CrossRefGoogle Scholar
  7. Mehta VK, Haden VR, Joyce BA, Purkey DR, Jackson LE (2013) Irrigation demand and supply, given projections of climate and land-use change, in Yolo County, California. Agric Water Manag 117:70–82CrossRefGoogle Scholar
  8. Mounir ZM, Ma CM, Amadou I (2011) Application of water evaluation and planning (WEAP): a model to assess future water demands in the Niger River (In Niger Republic). Modern Appl Sci 5(1):38–49CrossRefGoogle Scholar
  9. MWR (1999) Abbay River Basin master plan project—phase 3—main report. Ministry of Water Resources, Addis AbabaGoogle Scholar
  10. Richter BD, Baumgartner JV, Wigington R (1997) How much water does a river need? Freshw Biol 37:231–249CrossRefGoogle Scholar
  11. SEI (2011) WEAP water evaluation and planning system user guide. Stockholm Environ Institute, SomervilleGoogle Scholar
  12. Smakhtin VU, Shilpakar RL, Hughes DA (2006) Hydrology-based assessment of environmental flows: an example from Nepal. Hydrol Sci 2:207–222CrossRefGoogle Scholar
  13. Tena BA, Srinivasa Rao GVR, Abbulu Y (2015) Assessment of spatio-temporal occurrence of water resources in Didessa Sub-basin, West Ethiopia. IJCSEIERD 5:105–120Google Scholar
  14. The Nature Conservancy (2009) Indicators of hydrologic alteration version 7.1 User’s Manual. User’s Manual. The Nature ConservancyGoogle Scholar
  15. Weng S, Huang G, Li Y (2010) An integrated scenario-based multi-criteria decision support system for water resources management and planning—a case study in the Haihe River Basin. Expert Syst Appl 37:8242–8254CrossRefGoogle Scholar
  16. WHO (2003) Right to water. Retrieved from Office of the United Nations High Commissioner for Human Rights: http://www2.ohchr.org/english/issues/water/docs/Right_to_Water.pdf
  17. WIKIPEDIA (2015) Scenario_analysis. Retrieved from WIKIPEDIA The Free Encyclopedia: http://en.wikipedia.org/wiki/Scenario_analysis
  18. Yates D, Sieber J, Purkey D, Lee (2005) WEAP21—a demand-, priority-, and preference-driven water planning model-part 1: model characterisitics. Int Water Res Assoc 30(4):487–500CrossRefGoogle Scholar

Copyright information

© Springer International Publishing Switzerland 2015

Authors and Affiliations

  • Tena Bekele Adgolign
    • 1
  • G. V. R. Srinivasa Rao
    • 1
  • Yerramsetty Abbulu
    • 1
  1. 1.Department of Civil Engineering, College of Enginering (A)Andhra UniversityVisakhapatnamIndia

Personalised recommendations