Nice, France
|
2007
|
0.91 km total segments
|
8.7 km, 21 stops
|
Alstom
|
Battery, (Ni-MH) (SAFT)
|
20 CITADIS vehicles
|
Seville, Spain
|
2011
|
0.6 km line segment
|
2.2 km, 5 stops
|
CAF
|
ACR Evodrive supercapacitors
|
4 URBOS 3 vehicles
|
Shenyang, China
|
2013
|
Segments totaling 2.5 km
|
69.9 km, 65 stops, 4 lines
|
CNR Changchun
|
Voith supercapacitors
|
30 “dolphin” vehicles
|
Zaragoza, Spain
|
2013
|
2 km off-wire segment, charging at stops
|
12.8 km, 25 stops
|
CAF
|
ACR Freedrive battery/supercapacitors
|
21 URBOS 3 vehicles
|
Guangzhou, China
|
2014
|
Completely catenary free, charging at stops
|
7.7 km, 10 stops, Haizu Circle Line
|
CSR ZELC
|
SIEMENS SITRAS ES supercapacitors (Maxwell)
|
7 vehicles
|
Nanjing, China
|
2014
|
90% catenary free, OCS only at stops and acceleration points
|
8 km, 13 stops, Hexi line
|
CSR Puzhen
|
Bombardier Primove battery (Li ion)
|
15 FLEXITY 2 vehicles
|
Kaohsiung, Taiwan
|
2015
|
Completely catenary free, charging at stops
|
8.2 km, 14 stops
|
CAF
|
ACR Evodrive supercapacitors
|
9 URBOS vehicles
|
Dallas, TX
|
2015
|
Oak Cliff Streetcar, 1.6 km
|
2.6 km, 4 stops
|
Brookville
|
ABB battery (Li ion nickel manganese cobalt)
|
2 LIBERTY vehicles
|
Konya, Turkey
|
2015
|
1.8 km
|
21 km, 35 stops
|
Skoda
|
CATFREE battery (nano-lithium titanium)
|
12 FORCITY CLASSIC 28T vehicles
|
Santos, Brazil
|
2106
|
0.4 km
|
11.4 km, 14 stops
|
Vossloh
|
ABB battery (Li titanate)
|
22 TRAMLINK V4 vehicles
|
Seattle, WA
|
2016
|
Seattle First-Hill Streetcar, 4 km (downhill track)
|
4 km, 10 stops
|
Inekon
|
Battery (Li ion)(SAFT)
|
6 TRIO 12 vehicles
|
Detroit, MI
|
2016
|
New M-1 streetcar line, (length tbd—60% of system proposed)
|
5.1 km, 20 stops
|
Brookville
|
ABB battery (Li ion nickel manganese cobalt)
|
6 LIBERTY 12 vehicles
|
Doha Education City, Qatar
|
2016
|
Completely catenary free, charging at stops
|
11.5 km, 25 stops
|
Siemens
|
SITRAS HES battery (Ni-MH)/supercapacitors
|
19 AVENIO vehicles
|
Granada, Spain
|
2017
|
4 segments totaling 4.95 km
|
15.9 km, 26 stops
|
CAF
|
ACR Freedrive battery/supercapacitors
|
13 URBOS 3 vehicles
|
Luxembourg
|
2020
|
3.6 km off-wire segment between Pont Rouge and Gare Centrale, charging at stops
|
16 km, 24 stops
|
CAF
|
ACR Freedrive battery/supercapacitors
|
21 URBOS 3 vehicles
|
Nice
|
2018
|
Completely catenary free, charging at stops
|
11.3 km
|
Alstom
|
SRS with Ecopack (battery/supercapacitors)
|
19 Citadis X05 vehicles
|
Munich, Germany
|
–
|
Planned English Garden extension, 1 km with 2 stops
|
8 km, 4 new stops
|
Stadler
|
Battery (Li ion)
|
4 VARIOBAHN vehicles with batteries ordered (w/10 more pre-wired for future battery retrofit)
|