Skip to main content
Account

Table 3 Validation of stray currents

From: Analysis of rail potential and stray current in MVDC railway electrification system

Train location (km)

\(I_{2}\) (A)

\(I_{1}\) (A)

Length considered l (km)

Estimated stray current through Eq. (2) (A)

Simulated stray current (A)

5

30

37.5

0.31

0.29

12.5

88

244

37.5, 12.5

0.91, 0.84

0.81

25

164

12.5

0.566

0.59

40

65

12.5

0.224

0.26