Fig. 18
From: Analysis of rail potential and stray current in MVDC railway electrification system

A simplified model of Fig. 5 for verification of stray current for the 75 km floating track
From: Analysis of rail potential and stray current in MVDC railway electrification system

A simplified model of Fig. 5 for verification of stray current for the 75 km floating track